My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6598 Cobble Bliss St
Zephyrhills
>
Building Department
>
Building Plans
>
6598 Cobble Bliss St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 6:35:17 AM
Creation date
2/19/2025 12:09:12 PM
Metadata
Fields
Template:
Building Plans
Street #
6598
Location
Cobble Bliss St
Contractor
DR Horton
Building Plans - Permit #
1249
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETAl 6 W/ (9) 1 Od x 1 112" HOG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />S <br />,:MPSON LTA2 W/ (8) 10d x 1 1/2* HOG NAILS, WOOD TO WOOD: <br />NIPSON HIOA OR LGT2 Wl 1 Od x 1 1/2* HDG NAILS, FILL ALL HOLES. <br />CA <br />— — — <br />CA <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />C=J3 <br />711i <br />CJ3T "? <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />il <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />CJ5 <br />N 0 11 a <br />a It It N <br />i <br />CJST <br />MANUFACTURERS SPECIFICATIONS. <br />I <br />I <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />AH? <br />I <br />j <br />rlA-'\ <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />iZ <br />CONNECTERS ARE TO BE GALVAN ZED. <br />77- <br />AHO <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />=E 1 El <br />CONCRETE LINTELS. <br />-:I- <br />AH1 1 <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4- NOMINAL BEARING (4-). <br />ZX4 BLOCKING BETWEEN TRUSSES - <br />21V O.C. TOE NALED TO ADJACENT <br />- - - - - - - - - - - - - - - - - <br />- - - - - - <br />AH113 <br />B. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />TRUSSES W1 M i8d COMMON <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />NAILS & SECURETO BM. Wl <br />. . . . . . . . - — - — - — -- <br />AH15 <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />SIMPSON LTA2 USED TO BRACE <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />TOP OF WALL <br />APPROVAL. <br />. . . . . . ..... <br />- — - — - — <br />AH17 <br />9. PLACE 2X4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />4i� <br />SECURE 2x MEMBERS TO WALL WITH HILT[ X-ZF, POWDER ACCTUATED <br />- — - — - — - <br />AH19 <br />FASTENER, ZF 72 P8S36, A77* * x2 7/8"LONG, WITH WASHER@ 16"O.C. <br />10, TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />. . . . . III . . . . . . . <br />- — - — - — - — - — <br />-- <br />AM21 <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />I <br />RATIONAL ANALYSIS. <br />I <br />12. ALL ELEVATIONS ARE REFERENCED FROM 9-0', FINISH FLOOR. UNLESS <br />�91 LJ <br />- — — - — - — - — - — <br />22X3 ri <br />- AH23 <br />NOTED OTHERWISE. <br />I ATTIC' <br />— - — - — - — - — - — - — . . . . . <br />. . . . <br />. <br />I <br />A <br />. . . . . . . . . . . . . - — - — - — <br />- — - <br />--- <br />— - — <br />. . . . . . . . . . <br />A <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />------------------- <br />---------- <br />— - — - — - — - — <br />—.1 . . . . . . <br />Al <br />1 ROOF GIRDERS Wi UPLIFT IN EXCESS OF 2,500 USS SHALL BE <br />FABRICATED W/ A 2x6 BTM. CHORD (MIN.) <br />2 COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />— — — — — — — — <br />. . . . . . <br />Al <br />;�ITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />H <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />.. . . . . . . . . . . . . <br />All <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 8"FROM THE CENTER OF THE COLUMN, <br />--..j 6— <br />t . . . . . . . <br />A2 <br />. . . . . . <br />- <br />— - — - — - — <br />A2 <br />L- - - - - - - - - - - - <br />— - — - — - — <br />- — - — - — - — - <br />A3 <br />FIR �D07 <br />. . . . . . <br />A4 <br />— - — <br />— - — - <br />— - — --- <br />AS <br />- — - — - — - — -- <br />- — - — - — - — - <br />AS <br />- — - — - — - — <br />- — - — - — - — - <br />A6 <br />- — - — - — - — - — <br />- — - — - — - — - <br />AH2aA <br />— . . . . . . <br />- — - — - — - — -- — - <br />AM21A <br />L- - - - - - - - - - - - <br />— . . . . . . <br />- — - — - — - — - — - — - <br />AH <br />. . . . . . <br />- — - — - — - — - <br />22x54 <br />AH <br />Arnc <br />-'C <br />r �'x4- <br />ACCESS <br />ACCESS - — - — - — - <br />AH15A <br />- — - — - — - — - — <br />AH13A <br />- — - — - — - — - <br />— - — - — - — - — - — - — - — <br />AHI IIA <br />j <br />7:—' 7' —AH7E'- <br />It — - — - — — - <br />Is <br />— - — - — - — - . . . . . . . <br />. <br />AHGA <br />-lA <br />.1 <br />R <br />rIA <br />IA <br />2 <br />. . . . . . - — - — - — <br />- <br />CHO <br />GA <br />- — - — <br />T'r <br />--- <br />CH? <br />GGEA - <br />CJ3 <br />- <br />It 11 It 11 <br />CJ5 <br />It <br />CA <br />N <br />.] <br />IL- - -11- - A <br />-tL- <br />It 11 11 11 <br />I I <br />CJ3 <br />lk <br />CA <br />CA <br />FRAMING PLAN <br />7CALE: 1/4- = 1'-0- <br />F'A k C N I T 1 9 T <br />5 <br />Design <br />G r2o USE& <br />LONGWOOD, FL 32750 <br />PH: 407-774-6078 <br />FAX: 407-774-4078 <br />www.abde*QpWoup.com <br />AA #: 0003325 <br />I, DRAFnNG BY: <br />A.B. DESIGN GROUP <br />DRAFTING INC. <br />5439 BEAUMONT CENTER BLVD. <br />SUITE 1004 <br />TAMPA, FLORIDA 33634 <br />PH: SL34366-2628 <br />FAX- Slj:M� <br />m""" <br />I"BUDIDIV. de XIST!"ll <br />SILVERADO <br />LOT #23 <br />BLK #10 <br />PROJECT# <br />03719.000-23101 <br />MOIDEZ. <br />2795-F <br />'6AP.AGE 8WD9(;: <br />RIGHT <br />PAGE: <br />FRAMING <br />PLAN <br />150 MPH EXP. B <br />p <br />DW 10/30. <br />8CALIE: 1/4"=I'—O" <br />alfz= <br />S3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.