Laserfiche WebLink
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: USP HTA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />SMALL JACKS < 9' MAY BE NAILED W/ (10)d x 1 1/2" HDG NAILS, CONCRETE TO <br />WOOD FLOOR: <br />USP LPTA W/ (10) 1 Od x 1 1/2" HOG NAILS, WOOD TO WOOD: <br />USP RT16A OR LUGT2 W/ 1 Od x 1 1/2" HOG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE VITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON LINTEL <br />MANUFACTURER SHOWN IN STRUCTURAL PLANS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (4'). <br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 2X4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,5W LBS SHALL BE <br />FABRICATED W/ A 2x6 BTM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />& TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 8" FROM THE CENTER OF THE COLUMN. <br />I -PLY <br />G: 496 LBS <br />U:-145LBS <br />14-LY <br />G: 671 LBS <br />U:-317 LBS <br />1-PLY <br />G: 677 LBS <br />U:-390 LBS <br />2X4 BLOCKING BETWEEN TRUSSES 24" O.C. TOE <br />NAILED TO ADJACENT TRUSSES W/ (2) 16d COMMON <br />NAILS & SECURE TO BM. W/ USP HLPTA75 USED TO <br />BRACE TOP OF WALL. <br />FRAMING PLAN <br />SCALE: 1/4" = 1'-0" <br />14-L.Y <br />GL 2032 LBS <br />U:-1280 LBS <br />G: 2013 LBS <br />U: -1006 LBS <br />1-PLY <br />1569 LBS <br />-897 LBS <br />1441 N. RONALD REAGAN BL <br />LONGWOOD, FL32750 <br />PH: 407-774-6078 <br />FAX: 407-7744078 <br />wwwAbdesigngroup.eom <br />L AA d: 0003325 <br />R <br />14 <br />01 <br />V <br />8 <br />14 <br />0 <br />v <br />O <br />r <br />ti <br />4A <br />91 <br />OU13DIV. & LOT <br />SILVERADO <br />LOT 49 <br />BLK 6 <br />P1iOJECTp <br />04128.002-49061 <br />MODEI: <br />4EAB <br />"1672-ARIA" <br />GARAGE STrMG: <br />RIGHT <br />PAGE: <br />FRAMING <br />PLAN <br />%150 MPH EXP. B <br />'u W, i �_ iT ►TT i 7 <br />DAIM 01/18/19 <br />19CALE: 1/4"=1'—O" <br />$MEET <br />s3 <br />