Laserfiche WebLink
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: <br />USP HTA 16 W/ (9) 1 Od x 11,7 HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />USP LPTA W/ (10) 1Od x 110 HOG NAILS, <br />WOOD TO WOOD: <br />USP RT16A OR LUGT2 W/ 1 Od x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE, <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO MATCH CONNECTOR FINISH. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON LINTEL <br />MANUFACTURER SHOWN IN STRUCTURAL PLANS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (4-). <br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN MALL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 PSS36, .177" ` x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,5W LBS SHALL BE <br />FABRICATED W/ A 2x6 BTM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY I ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TOA STEEL COLUMN. <br />MAINTAIN AT LEAST 8" FROM THE CENTER OF THE COLUMN. <br />FRAMING PLAN <br />SCALE: 1/4" = 1'4r <br />1 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL32750 <br />PH: 407-774.6078 <br />FAX:407-774-4078 <br />Www.abditWngmup.o <br />AA 8: 0003325 <br />N <br />iO <br />Z <br />•W <br />V <br />Z <br />` <br />y <br />,Wso <br />N <br />O <br />o <br />M <br />C <br />u <br />mulwiv. a LOT <br />SILVERADO <br />LOT #10 <br />BLK #7 <br />1pvtO"=T# <br />04128.002-10072 <br />MODEL: <br />4EAB <br />"1672—ARIA" <br />GARAOE 9TfWG: <br />LEFT <br />PAGE <br />FRAMING <br />PLAN <br />50 MPH EXP. <br />ARCFNrEOT <br />BTATE OF FLORDA <br />i <br />1L 1 5 2Q►1' <br />JAMES J. <br />AR <br />Dw T 07/14/19 <br />SCA 4"=1-0 <br />almalm, 11 <br />'S 3 <br />