Laserfiche WebLink
FRAMING NOTES: <br />•• e u 1 r■ e r• <br />6 <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) 1Od x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 1Od x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H1OA OR LGT2 W/ 1Od x 1 1/2' HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (4"). <br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 20 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .177"' x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />HEADER SCHEDULE <br />MARK <br />SIZE 6 <br />DESCRIPTION <br />REMARK <br />10 <br />(2) 2X12 <br />© <br />(2) 2X0 <br />BEAM SCHEDULE <br />INDICATES OPENING BELOW / T.O.B. = TOP OF BEAM I B.O.L. = BOTTOM OF LINTEL I T.O.A. = TOP OF ARCH / T.O.S = TOP OF SLAB <br />ABBREVIATIONS E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />(psi) <br />XH' <br />REINFORCEMENT <br />STIRRUPS <br />REMARKS <br />BTM. <br />TOP <br />MID <br />SIZE <br />SPACING <br />BB1 <br />MASONRY <br />3000 <br />Sx8 <br />(1)#5 <br />WA <br />GROUTED SOLID <br />"CAST-CRETE" <br />SAFE LOAD TABLES <br />SAFE GRAVITY LOADS <br />FOR <br />8" PRECAST <br />& PRESTRESSED <br />U-LINTELS <br />SAFE LATERAL <br />8" PRECAST & PRESTRESSED <br />LOADS <br />FOR <br />U-LINTELS <br />SAFE UPLIFT LOADS <br />FOR 8" <br />PRECAST <br />& PRESTRESSED <br />U-LINTELS <br />SAFE <br />LOAD <br />- POUNDS <br />PER <br />LINEAR <br />FOOTSAFE <br />4-4-See <br />OAD <br />*-4-- <br />SAFE <br />LOAD <br />- POUNDS <br />PER <br />LINEAR <br />FOOT <br />TYPE <br />LENGTH <br />SWKm=rrm <br />I •sa• <br />I *'mm <br />I Ftm <br />n40a <br />aP44m <br />lasm <br />arum <br />TYPE <br />LENGTH <br />Blm <br />BPo <br />RCMU <br />T <br />LENGTH YPE~ <br />—IT <br />W%IT <br />anew <br />WWIT <br />all -sr <br />eNP1T <br />erssr <br />MW <br />w2w <br />FWT <br />armu <br />811WIT <br />Irxwr <br />3'd (42') PRECAST <br />2231 <br />3'4• m PRECAST <br />,026 <br />,o24 <br />ins <br />V4r (42') PRECAST <br />,m <br />aan <br />304 <br />am <br />am <br />Nat <br />70N <br />+m <br />3m <br />acv4 <br />4m <br />em <br />Ns <br />Toot <br />4%V (48n PRECAST <br />,986 <br />4•d (46•) PRECAST <br />7B6 <br />753 <br />1300 <br />4•d (4V) PRECAST <br />tan <br />aloe <br />3m <br />=a <br />4m <br />em <br />em <br />t30 <br />Oo0 <br />3m <br />3N0 <br />4m <br />00 <br />em <br />P4• (54') PRECAST <br />,598 <br />f4• 041 PRECAST <br />59•e <br />801 <br />ion <br />sd (6P) PRECAST <br />tae7 <br />30 <br />m7 <br />33u <br />40• <br />4n+ <br />em. <br />1207 <br />2m <br />rm <br />am <br />400 <br />4711 <br />nn <br />84• (#49 PRECAST <br />1217 <br />S4• R4•) PRECAST <br />411 <br />411 <br />746 <br />B4• MC) PRECAST <br />tme <br />am <br />sae <br />no <br />3n1 <br />4e22 <br />tote <br />Ina <br />Ole <br />m <br />em <br />3w <br />an <br />S-,0' (M PRECAST <br />,on <br />6'-10• M PRECAST <br />340 <br />339 <br />818 <br />6'-,0• (To•) PRECAST <br />m <br />t <br />sn <br />aw <br />am <br />Ora <br />m <br />ts7 <br />m3 <br />me <br />3NI7 <br />3m <br />Rae <br />Sd (m7 PREcar <br />eoe <br />Sd M PRECAST <br />SIT <br />n, <br />400 <br />Sd (769 PRECAST <br />m <br />am <br />mt <br />3n <br />IN <br />t4n <br />tm <br />no <br />27n <br />m+ <br />Ina <br />Td IeD9 I>4rECA8T <br />743 <br />Td (90j PRECAST <br />424 <br />04 <br />363 <br />rd (##') PRECAST <br />rn <br />, <br />, <br />m7 <br />am <br />rn <br />100 <br />1624 <br />sm <br />210 <br />3e27 <br />3m <br />Sd (11Z7 PRECAST <br />564 <br />V4• (112') PRECAST <br />325 <br />512 <br />230 <br />VW (»27 �GST <br />eN <br />7n <br />t <br />4tn <br />Mo. <br />eN <br />ee2 <br />171e <br />tea <br />wee <br />mt <br />sta <br />tad (128) PRECAST <br />476 <br />tad• (128') PRECAST <br />294 <br />401 <br />180 <br />10-C (12r) PRECAST <br />m <br />m <br />Ne <br />It <br />, <br />mt <br />m <br />m <br />n10 <br />ton <br />t70 <br />aaM <br />2m <br />1,•4• (,38') PRECAST <br />382 <br />„'4• (138� PRECAST <br />2eo <br />452 <br />154 <br />11'4• (138) PRECAST <br />04 <br />m <br />m <br />IM <br />W <br />tN <br />, M. <br />4" <br />m <br />+m <br />"G <br />raa• <br />NO <br />12d (,M1 PRECAST <br />887 <br />IZ- (,44') PRECAST <br />244 <br />402 <br />137 <br />1" (1M.) PRECAST <br />Oro <br />40 <br />»1 <br />m <br />t <br />t <br />tm <br />470 <br />m <br />So <br />+m <br />t <br />am <br />IV-,r (1807 PRECAST <br />206 <br />,3.4• (18P) PRECAST <br />217 <br />324 <br />110 <br />13d (iW) PRECAST <br />418 <br />m <br />e07 <br />m <br />00 <br />t <br />1m <br />4n <br />m <br />m <br />110 <br />M <br />1M <br />IW4r (,86•) PRECAST <br />279 <br />74'-0' (158� PRECAST <br />206 <br />293 <br />100 <br />W4r Ilan PRECAST <br />30 <br />m <br />m <br />7aN <br />m <br />Im <br />NO <br />40 <br />m <br />10p <br />t <br />1 <br />ten <br />14•d (,761 PRE <br />N.R <br />,4'd (1761 PRE <br />N.R <br />284 <br />91 <br />,Pd (178� PRE <br />m <br />m <br />m <br />m <br />m <br />eft <br />m <br />m <br />a/e <br />ra <br />1tN <br />17at <br />1S4• (180) PRESTRESSEDN.R <br />1S4' (1Sq PREST O <br />N.R. <br />260 <br />83 <br />1S4• (164.) PR681RE88FD <br />9>< <br />m <br />30 <br />m <br />40 <br />a" <br />0V <br />m <br />70 <br />7 <br />Nt <br />Im <br />1T4• ( PRE81R66BEC <br />N.R <br />1T4• U589 PRESTRESSED <br />N.R. <br />104 <br />64 <br />,rd R089 PRIM, D <br />to <br />ra <br />m <br />m <br />m <br />m <br />en <br />74o <br />m <br />7m <br />ta+ <br />Na <br />14n <br />1S4' Mn PRESIDED <br />N.R <br />1Sd mn PRESTRESSED <br />N.R. <br />14B <br />52 <br />1S4• Mn PRESTRESSED <br />ra <br />10 <br />m <br />m <br />m <br />4n <br />447 <br />m <br />M <br />40 <br />aO <br />1 <br />2TW CA" PRESTRESSED <br />N.R. <br />211 Mn PIeS1PE85ED <br />N.R <br />125 <br />42 <br />21'-C O n PRE <br />w <br />m <br />3V <br />m <br />40 <br />m <br />2Zd PM PRESTRESSED <br />N.R <br />116 <br />40 <br />2Zd 049 PRESTRESSED <br />ra <br />ra <br />ta7 <br />m <br />to <br />m <br />m <br />m <br />m <br />w <br />m <br />813 <br />m <br />40 <br />mm <br />m <br />m <br />i <br />2?d 01649 PRESTRESSED <br />N.R. <br />24'd ( PRFbTRE88ED <br />N.0. <br />21'47' ') PRESTRESSED <br />N.R <br />91 <br />33 <br />W-V (ZES9 PRESTRE88m <br />1s <br />1x <br />t7a <br />m <br />M'7 <br />m <br />3t3 <br />4s <br />4/0 <br />m <br />4n <br />m <br />m <br />m <br />eN <br />m <br />1m <br />-tm - <br />(#) THE NUMBERS IN PARENTHESIS <br />REDUCTIONS FOR GRADE <br />40 FIELD <br />ARE <br />ADDED <br />PERCENT <br />REBAR, <br />(#) THE <br />REDUCTIONS <br />NUMBERS <br />IN <br />FOR GRADE <br />PARENTHESIS <br />40 <br />ARE <br />FIELD ADDED <br />PERCENT <br />REBAR. <br />ALL VALUES TAKEN FROM *SAFE LOAD TABLES• BY CAS'TCRETE MAY 2016 EDITION -PRECAST PRODUCTS BY OTHERS TO MEET OR EXCEED VALUES STATED ABOVE <br />ALL PRECAST PRODUCTS ARE TO BE INSTALLED PER MANUFACTURES SPECIFICATIONS - PROVIDE MINIMUM 4.OF BEARING PAST EACH SIDE OF WINDOW OPENING <br />PRODUCT CONTROL NOTICE OF ACCEPTANCE F.E.C.P, CORPORATION-CASTE-CRETE <br />DIVISION ACCEPTANCE #: 160126.03 <br />©m�000 <br />OD®0®Om <br />000v000 <br />0m0000cr.� <br />©o��roo <br />0�Fc7000�0' <br />om00000 <br />�m00E��0 <br />�m000�c <br />Om�0�m0 <br />000ly©mo <br />00000mv <br />000m000 <br />0000000 <br />®�000�o <br />0�00�00 <br />000©0�© <br />®�m00 <br />0�00�00 <br />ooE[���oo <br />0��0®00 <br />�00000� <br />0��00®m <br />�— — — — — — — — — — — 8F16-1T/OMI1B— — — — — — — — — — — — — — —8F18.1TIOMi08— —— — — — — — — — — — — —F16-1T/0M/1B— — — — — <br />11 Zl. LL N j <br />AU? e <br />NUNO, PROVIDE BB1 WHERE <br />ROOF TRUSSES BEAR, TOP <br />OF WALL EL. 9'4', UNO. <br />( <br />o <br />p <br />1 <br />8RF14 <br />( <br />1T/OMI08 <br />�sG <br />( <br />41 <br />b <br />FH5 <br />( <br />8F36-1TlOMI06 ( � <br />- � 8F16-1T/OM/OB o- � 9'4" 1 z <br />I(,4.. .«. ,,. H"..._ ,". 8F36-1TlOMI18 �. <br />174• 1 <br />6 <br />1 LIFT BEAM PLAN <br />SCALE: 114' = 1'-0' <br />Grown <br />1441 N. RONALD RFAOAN BLVD. <br />LONOWOOD, FL 52750 <br />PH: 407.7744078 <br />FAX: 407.7744078 <br />www.ebdtteigngroup.com <br />� AA #: 0009325 J <br />DRAFTING BY: <br />A.B. DESIGN GRO]BLVD. <br />DRAFTING INC. <br />6439 BFAUMONT CENTER BUTTE 1004 <br />TAMPA, FLORIDA 938 <br />PH: 813888-2828 <br />FAX: 813.6864802 <br />I�IIIIIIIIII <br />BVHDIV. as LOT: <br />SILVERADO <br />LOT #1 <br />BLK 14 <br />PR,oJSCT/ <br />03719.000— 01141 <br />UoaaL: <br />2795—CAMDEN <br />OARAO>C >lQII,TO: <br />RIGHT <br />PAOffi: <br />LIFT BEAM <br />PLAN AND <br />NOTES <br />150 MPH EXP. B <br />D W 06/11/20 <br />a*13ILI caT <br />s2 <br />