Laserfiche WebLink
30" <br />MIN. EACH WAY <br />e <br />MONOLITHIC FOOTING <br />• ro <br />9z <br />STEEL REINFORCING IN GROUTED <br />gI <br />STEEL REINFORCING IN GROUTED <br />•• a <br />d a <br />CELL SEE PLAN FOR SIZE AND <br />SPACING REQUIREMENTS <br />d a <br />} <br />CELL SEE PLAN FOR SIZE AND <br />SPACING REQUIREMENTS <br />; .� <br />1 ' , • •,' P•" <br />Lu <br />t <br />U <br />W <br />1a. �rT-.(..�•,_..._ -,..._ ' <br />I• <br />W <br />GARAGE DOOR <br />RECESS <br />mLu <br />}� <br />a <br />� <br />Q <br />a <br />FM <br />J <br />a N <br />- Z <br />8" CMU WALL <br />O N <br />8" CMU WALL <br />I> �� CORNER BARS, SAME SIZE AS BAR <br />uJ LU <br />B" <br />O <br />iv <br />- Z <br />IN FOUNDATION WITH 3a'LEG EACH <br />LuJ u <br />WAY AT ALL CHANGES IN DIRECTIONS <br />n N <br />TOP OF SLAB <br />n <br />TOP OF SLAB <br />I ... SO THAT THE STEEL REINF. IS CONTINUOUS <br />' <br />• <br />MATCH AMOUNT OF CONTINUOUS BARS <br />.�•I • `Irl: <br />?Ic- <br />CURB FOR <br />• <br />EXT. PORCH SLAB <br />n <br />SEE BLAB SCHEDULE <br />BAR SIZE 48 BAR DIA <br />4" CHAMFER (1STORY) <br />.�^ <br />SEE SLAB SCHEDULE TOP OF GARAGE <br />r, .ILL <br />•' o. CONTINUOUS STEEL MONOLITHIC <br />FOOTING REINFORCEMENT SEE SCHEDULE <br />'. <br />`Lv <br />7;p, <br />MASONRY <br />UNITS SET <br />AT ELEV: <br />W/ 1/2" ISOLATION <br />8" CHAMFER (2-STORY) #3 <br />18" <br />EXT. PORCH SLAB <br />-4" CHAMFER (I -STORY) <br />JOINT (WHERE <br />0 • <br />• • <br />#4 <br />24 <br />W/ 1/2" ISOIATION <br />, 8" CHAMFER <br />APPLICABLE) <br />i <br />SEE SCHEDULE #5 <br />3a <br />JOINT (WHERE <br />.. •"'�--'� <br />EE SCHEDULE <br />WHEN TRANSITIONS ARE MADE FROM FOUNDATIONS HAVING <br />g <br />FOR WXD, BAR SIZE <br />3a' <br />APPLICABLE) <br />Z 4_ <br />FOR VVXD, BAR SIZE <br />DIFFERENT NUMBER OF CONTINUOUS BARB PROVIDE THE LEAST <br />LE <br />AND BAR QUANTITY <br />g AND BAR QUANTITY <br />NUMBER OF BARS (is. 2 TO 3, PROVIDE 2 BARS), UNO <br />#7 <br />42' <br />EXTERIOR MONO -FOOTING <br />EXTERIOR MONO -FOOTING <br />MONOLITHIC FOUNDATION <br />RECESS AROUND GARAGE <br />2 <br />GARAGE SCALE:3/4"=1'-0" <br />3 CORNER BARS DETAIL <br />4 DOOR OPENING <br />SCALE: 3/4"=1'-(Y' <br />SCALE: 3/4"=1'-0` <br />I <br />$ NEW REINF. BAR <br />a SECURED W/2-PART <br />2" CAPPED <br />a g EPDXY. MIN. EMBED <br />GALVANIZED PIPE <br />< 8", LINO <br />W/FLANGE ®BASE <br />4 p FOLLOW ALL MANF. <br />N SPECIFICATIONS FOR <br />4 <br />x InUSE AND <br />PREPARATION OF <br />HOLE <br />SECURE FLANGE TO <br />Z <br />W <br />SLAB W114) 1/4" X 2 1/4" <br />TAPCONS <br />19� <br />4" CHAMFER (,STORY) <br />8" CHAMFER (2-STORY) <br />ADDING BAR TO <br />LA <br />MONOLITHIC FOUNDATION <br />(Dj2LRD <br />� <br />SCALE:3/4"=1'-a' <br />SCALE:3/4"=1'-a <br />STEEL REINFORCING IN GROUTED <br />CELL SEE PLAN FOR SIZE AND <br />SPACING REQUIREMENTS <br />Z <br />oa <br />U <br />a U) <br />a0 <br />N 8" CMU WALL <br />TOP OF SLAB <br />'I SEE SLAB SCHEDULE <br />z <br />g <br />"ISOLATED" COLUMN PAD <br />6CENTERED <br />UNDER WALL AND <br />.T.-� <br />POURED MONOLITHICALLY WITH <br />„ FOUNDATION AND SLAB <br />SEE SCHEDULE <br />.tT <br />FOR WXD, BAR SIZE <br />AND BAR QUANTITY <br />n <br />COMBINED EXTERIOR MONO - <br />FOOTING AND COL. PAD <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL32750 <br />PH: 407-774.8078 <br />FAX: 407-7744078 <br />W W W.abde*Wngroup.com <br />L AA 0: 0003325 <br />ti <br />� <br />ip <br />fY <br />xxnmly ae WTt <br />SILVERADO <br />LOT #62 <br />BLK" #6 <br />FMOJMT# <br />041 8. 2-6 06 <br />HODzu <br />4EBB <br />"1828-CAL ' <br />GAVAOR BWUM : <br />RIGHT <br />PAOlM <br />DETAILS <br />150 MPH EXP. B <br />