Laserfiche WebLink
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: <br />USP HTA16 W/ (9) 10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />USP LPTA W/ (10)10d x 1 1/2" HDG NAILS, <br />WOOD TO WOOD: <br />USP RT16A OR LUGT2 W/ 1Od x 1 112" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO MATCH CONNECTOR FINISH. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON LINTEL <br />MANUFACTURER SHOWN IN STRUCTURAL PLANS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (4"). <br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 20 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 PBS36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER / ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,500 LBS SHALL BE <br />FABRICATED W/ A 2x6 BTM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 6" FROM THE CENTER OF THE COLUMN. <br />C <br />2X4 BLOCKING BETWEEN TRUSSES 24" O.C. <br />TOE NAILED TO ADJACENT TRUSSES W/ (2) li <br />COMMON NAILS & SECURE TO SM. W/ USP <br />HLTPTA25 USED TO BRACE TOP OF WALL. <br />i <br />1 <br />ATTI <br />ACCEES <br />m <br />m� <br />11 �:" �� <br />joy r <br />1 <br />, <br />FRAMING PLAN <br />SCALE: 1/4" = 1'-W <br />lA <br />3.1 <br />1441 N. RONALD REAGAN BLVD, <br />LONGWOOD, FL 32750 <br />PH: 407-7746078 <br />FAX: 407-7744078 <br />www.abdesigngroup.dom <br />L AA M: 0003328 , <br />�R <br />N <br />O <br />OF <br />� <br />w� <br />J <br />6 <br />a <br />a <br />$$ill <br />Ll <br />ilL. <br />il...3 <br />BUDDIV. & w1r: <br />SILVERADO <br />LOT #7 <br />BLK #18 <br />PROX111= <br />04128.00 -07181 <br />MODMIA <br />4EBB <br />"1828-CALI" <br />GARAGZ BVrING: <br />LEFT <br />PAGffi: <br />FRAMING <br />PLAN <br />150 MPH EXP. B <br />DrtmT <br />AT ., 12/03/19 <br />8CA=: 1/4"=1'-0" <br />9 <br />s3 <br />