FRAMING NOTES:
<br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE
<br />CONCRETE TO WOOD ROOF: SIMPSON HETAL20 W! (14) 10d x 1 1/2" HDG NAILS.
<br />CONCRETE TO WOOD FLOOR:
<br />SIMPSON LTA2 W/ (8)10d 11 1/2"HDG NAILS, WOOD TO WOOD:
<br />SIMPSON H10A OR LGT2 W/ 1Dd x 1 1/2" HDG NAILS, FILL ALL HOLES.
<br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER
<br />SCHEDULE.
<br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE
<br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH
<br />MANUFACTURER'S SPECIFICATIONS,
<br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS
<br />ARE TO BE GALVANIZED.
<br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE,
<br />CONNECTERS ARE TO BE GALVANIZED.
<br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE
<br />CONCRETE LINTELS.
<br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND
<br />CLEAR SPAN OPENINGS,
<br />7. LINTELS SHALL HAVE 4" NOMINAL BEARING (4•).
<br />8. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE
<br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE
<br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS
<br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND
<br />APPROVAL.
<br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES
<br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED
<br />FASTENER, ZF 72 P8S36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C.
<br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END
<br />UNLESS OTHERWISE SHOWN DIFFERENT.
<br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON
<br />RATIONAL ANALYSIS.
<br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS
<br />NOTED OTHERWISE.
<br />HEADER SCHEDULE
<br />MARK
<br />or=8� ln�
<br />REMARK
<br />1Q
<br />(2) 2X8
<br />BEAM SCHEDULE
<br />INDICATES OPENING BELOW / T.O.B. = TOP OF BEAM / B.O.L. = BOTTOM OF LINTEL I T.O.A. = TOP OF ARCH / T.O.S = TOP OF SLAB
<br />ABBREVIATIONS E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT
<br />MARK
<br />DESCRIPTION
<br />(psfc
<br />SIZE
<br />REINFORCEMENT
<br />STIRRUPS
<br />REMARKS
<br />BTM.
<br />TOP
<br />MID
<br />SIZE
<br />SPACING
<br />BB1
<br />MASONRY
<br />3000
<br />8x8
<br />(1)#5
<br />NIA
<br />GROUTED SOLID
<br />"CAST-CRETE"
<br />SAFE LOAD TABLES
<br />SAFE GRAVITY LOADS
<br />FOR
<br />8" PRECAST
<br />& PRESTRESSED
<br />U-LINTELS
<br />SAFE LATERAL
<br />8" PRECAST & PRESTRESSED
<br />LOADS
<br />FOR
<br />U-LINTELS
<br />I
<br />SAFE UPLIFT LOADS
<br />FOR 8"
<br />PRECAST
<br />& PRESTRESSED
<br />U-LINTELS
<br />SAFE
<br />LOAD
<br />- POUNDS
<br />PER
<br />LINEAR
<br />FOOT
<br />401AMIO�
<br />LPL
<br />�
<br />SAFE
<br />LOAD
<br />- POUNDS
<br />PER
<br />LINEAR
<br />FOOT
<br />TYPE
<br />LENGTH
<br />an
<br />lrsaa
<br />owls
<br />wta,s
<br />23
<br />FKm
<br />"'I'm��
<br />ww"
<br />wm4s
<br />sue®
<br />mms is
<br />��
<br />spas,"
<br />TYPE
<br />LENGTH
<br />am
<br />we
<br />RCAeII
<br />TYPE
<br />LENGTH
<br />oa,r
<br />Near
<br />eF1a•n
<br />I wow
<br />clan
<br />I IF16er
<br />enan
<br />morn
<br />rain
<br />raw
<br />Nan
<br />WSW
<br />solo:-,r
<br />mac
<br />Nz•) PRECAST
<br />2291
<br />m
<br />one
<br />"lea
<br />ew
<br />art
<br />amt
<br />low
<br />3S (42) PRECAST
<br />1026r4i
<br />t69B
<br />8d (42) PRECAST
<br />,am
<br />Mr
<br />30 4
<br />4aM
<br />arcs
<br />elm
<br />?wss
<br />mm
<br />4a16
<br />mm
<br />mo
<br />am
<br />Ism
<br />,tea
<br />Iowa
<br />are
<br />mN
<br />raw
<br />mr
<br />OW
<br />mot
<br />V-0• (4n PRECAST
<br />1a66
<br />2M
<br />2mt
<br />m
<br />4110
<br />mal
<br />70M
<br />ew
<br />4'd ( PRECAST
<br />766
<br />130E
<br />4'-0• (4B� PRECAST
<br />I=
<br />2m
<br />aw
<br />ame
<br />4m
<br />m
<br />wo
<br />21m
<br />4M
<br />0113
<br />iw
<br />w4
<br />IOX4
<br />iNNI
<br />,�
<br />zm
<br />an
<br />iNe
<br />4m
<br />m
<br />e#N
<br />4'd (547 PRCi'/1$T
<br />16BB
<br />,em
<br />2110
<br />Mat
<br />Dm
<br />46m
<br />sled
<br />am
<br />4'-0' (547 PRECAST
<br />502
<br />1073
<br />'r4r (54") PRECAST
<br />,w
<br />>016
<br />Dm
<br />33M
<br />4M
<br />mt
<br />ewe
<br />21ee
<br />am
<br />Mm
<br />7M7
<br />am
<br />10m1
<br />the
<br />,w
<br />mN
<br />2w
<br />Isis
<br />4ma
<br />4M1
<br />we
<br />5'•4' (641 PRECAST
<br />1217
<br />taw
<br />tom
<br />,ew
<br />mr
<br />ails
<br />mm
<br />w
<br />S•{' (64") PRECAST
<br />411
<br />746
<br />S-C (64') PRECAST
<br />,sr
<br />171
<br />me
<br />are
<br />are
<br />art
<br />4m
<br />pm
<br />am
<br />m
<br />ma
<br />trN
<br />me
<br />fete
<br />are
<br />mn
<br />4m
<br />(70•) PRf.CABT
<br />1662
<br />11mt,mIMfor
<br />MN
<br />mm
<br />mm
<br />CM PRECAST
<br />W
<br />816
<br />6'-10• (70') PRECAST
<br />sees-ta
<br />�
<br />m
<br />4m
<br />mo.
<br />nmms-10'
<br />m
<br />,w
<br />1 are
<br />1 2M
<br />3w7
<br />I NX
<br />1 0113
<br />S-0r (m PRECAST
<br />EOB
<br />UN
<br />MD
<br />3M
<br />aoN
<br />aw
<br />Ora
<br />eeM
<br />S4• (>8') PRECAST
<br />1m7
<br />721
<br />4M
<br />I
<br />&-r M PRECAST
<br />em
<br />am,
<br />SM
<br />an
<br />2177
<br />are
<br />GM
<br />mI
<br />me
<br />14r
<br />I tem
<br />I m
<br />I Des
<br />I art
<br />1 Wit
<br />T-0r (On PRECAST
<br />743
<br />toll
<br />lrA
<br />2m
<br />Dee
<br />Mm
<br />aM
<br />aer
<br />Td' (BO') PRECAST
<br />AIM
<br />594
<br />m
<br />T-0' lw') PRECAST
<br />7D
<br />t
<br />Mm
<br />NV
<br />am
<br />toll
<br />I=
<br />m
<br />am
<br />awl
<br />ew
<br />errs
<br />m
<br />t2M
<br />I tam
<br />I tm
<br />I a12e
<br />I Mn
<br />I ma
<br />W— 11 PRECAST
<br />(
<br />m
<br />lmo
<br />,ea
<br />Me4
<br />ale
<br />M,e
<br />=let
<br />7-0" (111) PRECAST
<br />328
<br />512
<br />MOS•4'
<br />(ttZ7 PRECAST
<br />me
<br />/
<br />t471
<br />1
<br />m
<br />tm
<br />/ea
<br />Mm
<br />aw
<br />ear
<br />m
<br />sea
<br />tam
<br />Lela
<br />Iw
<br />z m
<br />me
<br />ta4T (1267 PRECAST
<br />475
<br />me
<br />m
<br />mN
<br />m2177
<br />21r
<br />7me
<br />a (12� PRECAST
<br />281
<br />401
<br />1B0
<br />taa (72B) PRECAST
<br />m
<br />am
<br />w
<br />H
<br />,
<br />sett
<br />em
<br />,sm
<br />mal
<br />mr
<br />Dal
<br />4m1a
<br />m
<br />m
<br />I 1w
<br />sm
<br />Imd
<br />Mee
<br />no
<br />ll'-C (7 1 PRECAST
<br />302
<br />ar
<br />tam
<br />mr
<br />am
<br />mu
<br />41111
<br />IT-4 (130n PRECAST
<br />260
<br />4S2
<br />154
<br />114r (13r) PRECAST
<br />m
<br />a
<br />w
<br />,w
<br />,
<br />,rm
<br />em
<br />er
<br />law
<br />tMe
<br />3 M
<br />MD
<br />4110
<br />Yt
<br />w
<br />W2
<br />IMA
<br />ism"
<br />210
<br />( 4P) PRECAST
<br />1Y•O' 1
<br />387
<br />w
<br />mim1
<br />,am
<br />2M
<br />Mae
<br />m
<br />1" (1"') PRECAST
<br />244
<br />402
<br />137
<br />17-T (144r) PRECAST
<br />m
<br />4m
<br />rN
<br />m
<br />„
<br />,
<br />tem
<br />w
<br />m
<br />/m4
<br />me,
<br />21r
<br />Mr
<br />aem
<br />4m
<br />m
<br />I 1m
<br />tar
<br />IM
<br />mm
<br />1sr nth PRECAST
<br />2I1B
<br />m
<br />ms
<br />ism
<br />uM
<br />teas
<br />2m
<br />aw
<br />(160' PRECAST
<br />2IT
<br />324
<br />110
<br />1sr (lair) PRECAST
<br />4m
<br />me
<br />w
<br />m
<br />w
<br />,
<br />,m
<br />m
<br />7m
<br />mae
<br />,4m
<br />I=
<br />mm
<br />m1s4•
<br />4m
<br />480
<br />m
<br />ltm
<br />of
<br />i
<br />,w
<br />100 (166i PRECAST
<br />279
<br />4m
<br />tee
<br />tar
<br />tar
<br />tw
<br />am/
<br />Mao
<br />14'-0• (III PRECAST
<br />206
<br />203
<br />100
<br />W-V (18n PRECAST
<br />am
<br />m
<br />am
<br />7N
<br />m
<br />t
<br />tfm
<br />4N
<br />lm
<br />ter
<br />tam
<br />1w
<br />2w
<br />fro
<br />4m
<br />42
<br />717
<br />tam
<br />1
<br />t
<br />lump
<br />14'4P (1767 PRESTRESS®
<br />N.R.
<br />M
<br />M
<br />M
<br />M
<br />M
<br />m
<br />M
<br />14%r (17W) PRE
<br />N.R.
<br />284
<br />61
<br />14'4T (17W) PRESTRESS®
<br />Me
<br />me
<br />aM
<br />ar
<br />em
<br />an
<br />m
<br />em
<br />m
<br />t
<br />M
<br />tm
<br />1131
<br />17M
<br />O
<br />7m
<br />tam
<br />loot
<br />7aN
<br />aN7
<br />Its
<br />1S•4 (1N� PRESTRESSED
<br />N.R.
<br />M
<br />Nt
<br />M
<br />M
<br />M
<br />M
<br />M
<br />1S�r (16{� PRESTRESSED
<br />N.R.
<br />269
<br />63
<br />1S-0• (Igor) PRESTREW
<br />aN
<br />m
<br />Ma
<br />m
<br />416
<br />me
<br />w
<br />am
<br />me
<br />M1
<br />,
<br />1m
<br />412
<br />7m
<br />I=
<br />1M
<br />eW
<br />2w
<br />sem
<br />IT 4• (2067 PRt:$i
<br />NA
<br />M
<br />M
<br />M
<br />M
<br />M
<br />M
<br />1Ta• R� PRF81IE88®
<br />N.R
<br />tom
<br />84
<br />1T�' ROB') PRf
<br />tD
<br />tea
<br />ms
<br />an
<br />4r
<br />tar
<br />m
<br />740
<br />rs
<br />1
<br />me
<br />l0,
<br />m
<br />,4m
<br />am
<br />em
<br />am
<br />tam
<br />,em
<br />SO
<br />mR
<br />1C4' R92') ME56IRE88®
<br />NA
<br />M
<br />M
<br />M
<br />M
<br />N1
<br />M
<br />M
<br />1S4• RS2') PRESIAESB�
<br />N.R.148
<br />S2
<br />ISM' R827 PRESTRESSED
<br />tm
<br />tm
<br />m
<br />Ma
<br />ar
<br />4M
<br />w
<br />m
<br />w
<br />Mi
<br />w
<br />1
<br />W
<br />,aD
<br />ar
<br />40
<br />ms
<br />tw
<br />>ZQ
<br />ism
<br />iris
<br />,n,4r
<br />R�9 PRESTRESSED
<br />NR
<br />M
<br />NL
<br />M
<br />M
<br />Nit
<br />Nl
<br />M
<br />21L• P
<br />N.R.
<br />126
<br />42
<br />21Lr R56) PRF$7RES8®
<br />-
<br />a
<br />m
<br />w
<br />m A
<br />ar
<br />w
<br />4m
<br />m
<br />am
<br />em
<br />m
<br />mr
<br />1m
<br />am
<br />me
<br />m
<br />tlu
<br />tam
<br />14"
<br />2P-0r t26:) PRE
<br />N.R
<br />MR
<br />M
<br />M
<br />M
<br />MR
<br />M
<br />M
<br />� PRES7ti8>i®
<br />N.R
<br />1"
<br />40
<br />27-0' Retry Plies
<br />tar
<br />tD
<br />m7
<br />am
<br />sm
<br />see
<br />am
<br />eN
<br />4m
<br />ew
<br />1iN
<br />m
<br />1f0
<br />11e
<br />mam
<br />am
<br />7N
<br />low
<br />tar
<br />tam
<br />24'-0r (2WI PRESIIEM
<br />NA
<br />M
<br />M
<br />M
<br />M
<br />M
<br />M
<br />M
<br />W-C Mn PFE87FEWO
<br />RR
<br />91
<br />33
<br />2FP P" PRr
<br />to
<br />1N
<br />w
<br />=
<br />w
<br />am
<br />Ms
<br />4m
<br />4m
<br />em
<br />4m
<br />w
<br />w
<br />em
<br />fN
<br />m
<br />4m
<br />mt
<br />m4
<br />ism
<br />tm
<br />(#) THE NUMBERS IN PARENTHESIS
<br />REDUCTIONS FOR GRADE
<br />40 FIELD
<br />ARE
<br />ADDED
<br />PERCENT
<br />REBAR.
<br />(#) THE
<br />REDUCTIONS
<br />NUMBERS
<br />IN
<br />FOR GRADE
<br />PARENTHESIS
<br />40
<br />ARE
<br />FIELD ADDED
<br />PERCENT
<br />REBAR.
<br />• ALL VALUES TARN FROM 1aAFE LOADTASLES' 13Y CASTCRETE MAY 201E EDITION - PRECAST PRODUCTS BY OTaERS TO MEET OR FXC®VN.UES STATED ABOVE
<br />• ALL PRECASTPRODIICTS ARE TO BE NBTALLED PER MANUFACTURES SPECIFICATIONS • PROVIDE MINIMUM 4 OF SEARING PAST EACH SIDE OF WWDOWOPENNG
<br />PRODUCT CONTROL NOTICE OF ACCEPTANCE F.E.C.P. CORPORATiOWCASTE-CRETE
<br />DIVISION ACCEPTANCE #: 1"126.03
<br />F� —____ 8F16.1T/OMIOB— — — — — — — — — 8F76-1T/OM/OB------------8F76-1T/OMlOB ,____
<br />I
<br />1
<br />1�
<br />♦♦
<br />I
<br />UNO, PROVIDE BB1 WHERE
<br />ROOF TRUSSES BEAR, TOP
<br />OF WALL EL. 8'-0". UNO.
<br />8RF14-
<br />1 1 ♦♦
<br />1 1
<br />i 1
<br />1 1 ♦♦
<br />1 1
<br />1 1
<br />1 8F16-1T/0M/0B 146
<br />1 1
<br />1 L_ —
<br />1
<br />L------------- `:::::--L ------
<br />LIFT BEAM PLAN
<br />SCALE: 1/4" = l'-W
<br />8F20-lT/0W0B
<br />>i
<br />1
<br />1
<br />1
<br />1 Q
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1441 N. RONALD RFAGAN B(
<br />LONGWOOD, FL 327W
<br />PH: 407-774,6078
<br />FAX: 407-7744078
<br />www.abdesigngroup.com
<br />L AA g: 0003325
<br />L4Wb
<br />kV ab IAT:TT PARKT #35#9CT�1000-35091c
<br />EAB2—ARIA"
<br />1IIIJG:IGHT
<br />PAGIC:
<br />LIFT BEAM
<br />PLAN
<br />AND NOTES
<br />160 MPH EXP. C
<br />PRII�T 3/14/20
<br />DATw•
<br />8CALw: 1/4"=1'-0"
<br />BBwwT
<br />111 s2
<br />
|