My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7847 Davie Ray Dr
Zephyrhills
>
Building Department
>
Building Plans
>
7847 Davie Ray Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 8:14:42 AM
Creation date
2/19/2025 12:01:51 PM
Metadata
Fields
Template:
Building Plans
Street #
7847
Location
Davie Ray Dr
Contractor
DR Horton
Building Plans - Permit #
22654
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRAMING NOTES: <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: <br />USP HTA16 W/ (9)10d x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />USP LPTA W/ (10)10d x 1 1/2" HDG NAILS, <br />WOOD TO WOOD: <br />USP RT16A OR LUGT2 W/ 10d x 1 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO MATCH CONNECTOR FINISH. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON LINTEL <br />MANUFACTURER SHOWN IN STRUCTURAL PLANS. <br />6. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />7, LINTELS SHALL HAVE 4" NOMINAL BEARING (4"). <br />6. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />9. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILT] X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 P8S36, .177" ° x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />10. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />11. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />12. ALL ELEVATIONS ARE REFERENCED FROM 0'-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />TRUSS MANUFACTURER/ENGINEER NOTES: <br />1. ROOF GIRDERS W/ UPLIFT IN EXCESS OF 2,500 LBS SHALL BE <br />FABRICATED W/ A 2x6 STM. CHORD (MIN.) <br />2. COORDINATE ANY TRAY/COFFERED CEILINGS, AND ATTIC ACCESS <br />WITH THE ARCHITECTURAL PLANS TRAYS AND COFFERS ARE NOT <br />SHOWN ON THIS PLAN IN ORDER TO AVOID CONFUSION AND MISTAKES. <br />3. TRUSS COMPANY / ENGINEER IS RESPONSIBLE FOR ALL TRUSS TO <br />TRUSS CONNECTIONS. <br />4. AVOID PLACING A TRUSS PERPENDICULAR TO A STEEL COLUMN. <br />MAINTAIN AT LEAST 8" FROM THE CENTER OF THE COLUMN. <br />COLUMN SCHEDULE <br />MARK <br />812E a8A8E <br />PLATE OR <br />REMARK <br />DEBCFtIPTN)N <br />REINFORCEMENT <br />WD_1 <br />4X6 (3 X' X5 A-) SYP. <br />USP HTT4 WSW DIA <br />5/S3.1A <br />PT., WOOD POST <br />x 5" EXP. BOLT <br />L------------------------J <br />ROOF FRAMING PLAN <br />SCALE: 1/4" = 1'-0" <br />1441 N. RONALD REAGAN BL <br />LONGWOOD, FL 32780 <br />PH: 407-7746078 <br />FAX: 407-774-4078 <br />www.abdesigngroup.00m <br />L AA A: 0003325 <br />f <br />:e <br />Q <br />J <br />F <br />8c7HDIK S. IAT <br />ABBOTT PARK <br />LOT #45 <br />BLK #9 <br />PRGJECTO <br />04181.000-45091 <br />MoDzu <br />4EHB <br />"2605- HAYDEN" <br />GARAGE EWDM: <br />RIGHT <br />PAGE: <br />ROOF FRNAMING <br />PLA <br />AND NOTES <br />160 MPH EXP. C <br />DA 12/06/19 <br />SIICALIN: 1/4.=1'-0. <br />8HEL'T <br />S6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.