Laserfiche WebLink
c <br />0 <br />11 1 1-2" 2" <br />N <br />00 O <br />T CV <br />1'-611 <br />FOAM LOUVER <br />3 <br />DETAIL <br />- <br />SCALE: 3/4"=1'-0" <br />GARAGE DOOR <br />2 <br />DETAIL <br />SCALE: 3/4"=1'-0" <br />WINDOW TRIM <br />(DDETAIL <br />=;(CALE: 3/4"=1'-0" <br />4" WIDE STUCCO <br />BAND (+1) <br />6" FASCIA (TYP.) <br />4" WIDE STUCCO <br />BAND (+1) <br />1'-0' <br />12 <br />5 <br />REAR ELEVATION <br />SCALE: 1/4"=1'-0" <br />FRONT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. (TYP.) <br />12 <br />5 <br />FIN. 1ST FLOOR _ <br />BLDG. HEIGHT <br />5:12 <br />12 <br />4" WIDE STUCCO <br />5 BAND (+1) <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. <br />(3L (TYP.) T.O. MASONRY <br />4" WIDE STUCCO <br />( ---- BAND (+1) <br />6" FASCIA (TYP.) c� <br />� N <br />EJ T.O. MASONRY <br />AL <br />---- T.O. WINDOW `- <br />-- <br />-------- <br />co <br />d <br />co <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C 1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />W <br />�-_1 <br />�o° � <br />>c <br /><0 <br />W �0E- <br />(n 0 III <br />QZ)WF- <br />_ F- 5;J <br />IL CD W W <br />Z) r�� <br />Y01—z <br />'dw00C/) <br />z z z F w <br />� J Q 2 J <br />wa=crd- <br />�CQpOU <br />Z:)2zLi- cn <br />�F-¢zo <br />n <br />ON <br />Q O <br />0 <br />�Q <br />Q <br />O <br />0 <br />o <br />w(j) <br />� <br />Z <br />O <br />A "NEW <br />o <br />�w <br />Ow <br />O <br />� <br />w <br />O <br />IL <br />U) <br />w <br />0 <br />z <br />z <br />Od <br />rno <br />'mz <br />�QQQQ <br />IT <br />AN 19 222 <br />COMMUNITY: <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6120 <br />RELEASED:1/20/202 <br />SHEET <br />A2.1 <br />0 <br />z <br />z <br />Q <br />z <br />T <br />z <br />ii <br />ji <br />z <br />Q <br />x <br />z <br />J <br />rn <br />w <br />z <br />z <br />r <br />z <br />ji <br />2 <br />0 <br />z <br />2 <br />z <br />0 <br />z <br />Q <br />2 <br />r <br />i <br />:n <br />A <br />z <br />A <br />]C <br />J <br />7) <br />n <br />x <br />i <br />K <br />z <br />z <br />z <br />M <br />