Laserfiche WebLink
0 <br />0 <br />0 <br />r <br />40 <br />• <br />e <br />• <br />2'-0" <br />IN M <br />LANAI SLAB: <br />3 ,V2GONG. SLAB ON <br />GRADE (2500 P51 <br />c� <br />MIN.) w/ 6x6-W1.4xW1.4 <br />I <br />MESH OR FIBER MESH <br />ON q5% COMPACTED <br />FILL OR VIR61N SOIL. <br />I <br />q � I <br />5D 13 R2" STEP 5D-I <br />12" WIDE GONG. <br />TURNDOWN EXTENDED <br />MIN. 12" BELOW GRADE <br />2 <br />5D- <br />• • • • • I • • <br />,I I <br />6'-4" <br />• I FRENCH DOOR - <br />RECESS PER <br />MANUFACTURERS <br />INSTRUCTION <br />I <br />•I <br />I <br />I' I <br />g <br />• I NOTE: REFER TO BLOCK <br />I PLAN FOR ALL DOWEL <br />LOCATION DIMENSIONS. <br />I I <br />I <br />•I � <br />I <br />.I <br />2 <br />I <br />5D-I I I <br />Iq'-4n <br />I 4 <br />5D- I <br />3 Y2" STEP <br />mel moss, <br />MIN <br />5D— I I <br />--1 -3 y2" STEP J <br />• • <br />I I 5D-I I <br />o I <br />I Io <br />I I 5 Io <br />2 <br />5D- <br />13'-4" 5'-41I <br />38'-8" <br />20�_I ,1 <br />10 <br />I• <br />I <br />1- <br />I <br />t <br />I• <br />-3 y2n STEP <br />2 <br />5D-1 <br />I. <br />HVAG <br />UNIT <br />I• <br />I• <br />4 <br />I I 5 <br />I <br />I 5D-I <br />I I• <br />' <br />GARAGE SLAB: <br />3 /2 GONG. SLAB ON GRADE <br />(2500 P51 MIN.) w/ 6x6-W1.4xW1.4 <br />MESH OR F I BER MESH OVER 6®®� . <br />MIL. POLY ON 015% COMPACTED <br />FILL OR VIRGIN SOIL. <br />I• <br />I <br />w � I <br />I <br />0 <br />• <br />• <br />0 <br />c� <br />LEGEND <br />• ® INTERIOR BEARING WALL <br />• _ _ _ BEARI N6 WALL ABOVE <br />• BEAM / HEADER <br />• LOCATION AND EXTENT OF 5HEARWALL <br />• I: :I EXTENT OF OVERFRAMIN6 <br />•.,.- _-. _.._-_INDIGATE5 1/8"A" 5AW GUT CONTROL JOINT <br />INDIGATE5 LOCATION OF REINFORGED GMU GORE <br />(SEE NOTES) <br />J L METAL WHIR, <br />INDIGATE5 P05T ABOVE. PROVIDE 50LID <br />BLOGKIN6 UNDER P05T OR JAMB ABOVE. <br />REFER TO 5-0.0 FOR TYPICAL <br />STRUCTURAL NOTES � SCHEDULES <br />1j <br />s �, <br />f <br />°Llp; <br />or- <br />© copyright : M' <br />Structural E <br />2QL <br />ingT <br />, n . <br />�..z <br />Z <br />JL <br />W <br />w <br />z <br />c <br />CO <br />z <br />rn <br />w <br />a <br />J <br />LZ <br />a <br />Z= <br />. <br />QEll <br />C-) <br />at =) <br />t <br />c <br />CC <br />LU Cn <br />E <br />S-� <br />Q <br />M <br />E <br />> <br />J- <br />1 <br />a <br />z <br />W <br />o <br />Y��,p <br />0 <br />y <br />2 C9 <br />Nd <br />�. <br />C N <br />co M <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />J S B <br />drawn by: <br />DJ R <br />issue date: `j 1- <br />`j 8-21 <br />REVISIONS: <br />date: initial: <br />o <br />o <br />q <br />Z <br />5LAB PLAN <br />sheet: <br />4 <br />O <br />LL <br />W <br />cn <br />0 <br />z <br />x <br />� <br />a <br />U) <br />Z) <br />Z0 <br />(L <br />x <br />C� <br />z <br />J J <br />20'-0" <br />SCALE: 1/4"=1'-0" (22x34 SHEET) <br />SCALE: I/S"=1'-0" (110 SHEET) <br />Fm 1 *0 <br />