Laserfiche WebLink
ri <br />0 <br />4" WIDE <br />STUCCO <br />d +1 I <br />BAND <br />I <br />4" \� <br />I <br />I <br />�r +1 <br />/ <br />---� 4"WIDE <br />STUCCO <br />BAND <br />WINDOW HEAD & SILL DETAILS <br />SCALE: 3/4"=1'-0" <br />4" WIDE <br />STUCCO <br />BAND I +1 <br />I <br />211 I <br />GARAGE HEAD TRIM DETAIL <br />SCALE: 3/4"=1'-0" <br />1 <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. <br />35 SH <br />12 <br />5 <br />5:12 12� 5 <br />0 <br />12 <br />5 <br />I h� <br />(2) 3068 *35 SH <br />REAR ELEVATION <br />SCALE: 1/4.'=1' 0• <br />BLDG. HEIGHT h <br />ROOF SHINGLES PER 5:12 <br />COMMUNITY SPECS. ROOF SHINGLES PER <br />\/ 12 COMMUNITY SPECS. <br />12 5 <br />5 <br />4" WIDE STUCCO BAND (+1) 2 <br />6" FASCIA, TYP. <br />T.O. MASONRY <br />T.O. WINDOW T <br />1 4" WIDE co <br />I I ' <br />El El El mEl El �� ? STUCCO BANDco <br />4" WIDE STUCCO BAND (+1) <br />El p El El m p *25SH <br />CV <br />FIN. FLOOR <br />Qu I <br />16070 GARAGE DOOR 4" STUCCO 3068 1'-4" STUCCO <br />BAND (+1) BAND RETURN <br />FRONT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />TEXTURE <br />BODY COLOR <br />FINISH <br />.ed•r::.. c•nt.•r`.. <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />It <br />W <br />_ CC <br />�:OOF- <br />>o <br />ao <br />LU Z) 0 <br />(!)UwW <br />Q W <br />2 -j <br />I� IL <br />Y 0 I- Z <br />�Ii00U) <br />Lu <br />ZZZF—Z <br />i Q J <br />W a-_ <br />-i U) C) 0 _Q <br />H Q z 0 <br />n <br />0 a <br />C, <br />O <br />�¢ <br />Q <br />O <br />Vl <br />0 <br />z <br />O <br />U <br />� <br />w <br />w <br />0 <br />w <br />ct$ <br />ra�, <br />vl <br />< <br />1-" <br />w <br />Z <br />w <br />O <br />U <br />O <br />a <br />a <br />in <br />W <br />0 <br />t <br />Z <br />O <br />F <br />d <br />o <br />WZ <br />aaaa� <br />c �• <br />. a: <br />•u .: <br />2 2 20Z1 <br />COMMUNITY: <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6100 <br />RELEASED: 11/19/21 <br />SHEET <br />A2. I <br />