Laserfiche WebLink
f; <br />fJ <br />RAISED <br />WITH SAND FINISH <br />FOAM MEDALLION DETAIL <br />SCALE: 3/4"=1'-0" <br />,GARAGE TRIM DETAIL <br />SCALE: 3/4"=1'-0" <br />WINDOW TRIM DETAIL <br />SCALE: 3/4"=1'-0" <br />1'-0" <br />ROOF SHINGLES PER <br />COMMUNITY SPECS <br />(TYP.) <br />REAR ELEVATION <br />SCALE: 1 /4"=1'-0" �22::x34::�SCALE: 1/8"=1'-0"11 "x17 <br />BLDG. HEIGHT <br />ROOF SHINGLES PER <br />of, 8,-o„ ,-0„ COMMUNITY SPECS <br />(TYP.) <br />12 12 4" WIDE STUCCO <br />5 5 BAND (+1) <br />o HEEL HIGHT <br />M 4" WIDE STUCCO <br />BAND (+1) <br />r� 3 <br />„ T.O. MASONRY M <br />cnico <br />'- " T.O. WI co <br />T <br />4" WIDE STUCCO <br />BAND(+1) - <br />L 18" DECORATIVE <br />FOAM SHUTTERS c0 <br />00 <br />4" WIDE STUCCO F, <br />BAND (+1) <br />2 <br />2`-0" STUCCO 25 SH <br />— — — — — — _ — — — — — — — — BAND RETURN — — _ — — — cV — FIN_FLR� <br />16070 GARAGE DR. 3068 <br />FRONT ELEVATION <br />SCALE: 1 /4"=1'-0" �22::x34::�SCALE: 1/8"=1'-0"11 "x17 <br />ROOF SHINGLES PER <br />COMMUNITY SPECS <br />(TYP.) <br />6" WIDE STUCCO <br />BAND (+1) <br />1'-0" <br />12 <br />5 <br />4 <br />12 <br />5 <br />CRICKET <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />'<;•":':;; <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C 1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />W <br />�-_� <br />�o °� <br />} <br />> Ir Q 0 <br />W:D aF- <br />cl)0I <br />Q W F- <br />_ CC <br />:D IY !Y <br />Y O 1- z <br />.6LL00C/5 <br />zzzP: zL'i <br />W CL - <br />C/) 00 0 <br />a?o <br />o <br />cz - C) <br />00 <br />• ti <br />N <br />c O <br />n <br />Q o <br />O � <br />Q <br />Q <br />o <br />cn <br />O <br />z <br />0 <br />O <br />r� <br />0 <br />w <br />j <br />i*i <br />W <br />0 <br />� <br />w <br />w <br />m <br />M <br />cu <br />Z <br />� <br />O <br />z <br />o <br />C <br />O <br />U <br />cn <br />ui <br />0 <br />N <br />O <br />w <br />o <br />wzaaaaa <br />G J+•' <br />••.��� 0 5 2021 <br />t: <br />..•`Q <br />MUNI'TY; <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6101 <br />RELEASED:10/26/21 <br />SHEET <br />Awl. I <br />