Laserfiche WebLink
seal: �o`���G'. • • ° , <br />REAR LANAI DROPPED BEAMS: !- GEND ROOF FRAMIN6 ��:= :.`o 4 <br />FA5TEN DROPPED BEAM5 TO (2)2x 12 w/ Y2" 05B/PLYWOOD • SEE ROOF TRU55 UPLIFT CONNECTOR SCHEDULE FOR ALL ROOF ' * ' <br />P05T5 PER DTL U/5D-2 (TYP. OF 2) — BTWNPLYS (TYP. OF 3) TRUSS CONNECTORS. • ® INTERIOR BEARING WALL - <br />— <br />— — ,�- — . ,0pz -0T <br />DROPPED BEA—M • - - - BEARIN6 WALL ABOVE ' gyp'•., ,c <br />• ROOF 5HEATHIN6 SHALL BE �1/16" MIN. 05B/PLYWOOD 5HEATHIN6 24 ' <br />�•.• <br />�+ • BEAM /HEADER EXPOSURE 1. FASTEN 5HEATHIN6 TO ROOF MEMBERS w/ 2 3/8"x0.113"b ss o <br />O RING SHANK NAILS (R5R5-01 OR EQUIV.) O 6 O.G. AT PANEL E06E5 8 1'11111161 <br />4x6 P05T w/ 51 MP50N i i o o �� ©copyright : MUL u <br />w • LOCATION AND EXTENT OF 5HEARWALL ®6 O.G. IN FIELD. FASTEN 5HEATHIN6 TO GABLE END 4 DRA6 OZ1 <br />ABA46Z BA5E I I v Stru ,1 n ,1 . <br />(TYP. OF 2) �W HIP GIRDER TRU55 Lu� - TRU55E5 w/ RIN6 5HANK NAILS ® 3" O.G. (U.N.O.). PROVIDE BLOGKING g <br />�p I CD . I: • : : I EXTENT OF OVERFRAMIN6 ALON6 PANEL E96E5 AT FIRST 2 TRU55 BAYS FROM 6ABLE END. CD <br />PROVIDE "H" STYLE CLIPS ALON6 UNSUPPORTED EDGES. o Z <br />�(1 i 5D-2 � I 1 • - INDICATES I/S"A" SAW GUT CONTROL JOINT • ROOF 5HEATHIN6 FOR MAIN ROOF TRU55E5 SHALL EXTEND w N <br />l o y 01 5D-2 CONTINUOUSLY UNDER ALL OVERFRAMIN6. = z o <br />INDICATES LOCATION OF REINFORCED GMU GORE c� <br />� 51MP50N HUG412 FASTENE � (SEE NOTES) TRU55 ALL VALLEY SETS. FASTEN EACH TO TRUSS BELOW w/ � Z <br />a <br />51MP50N VTGR GLIP5 0 24" O.G. '-'-' <br />1 BAGK TO GMU BLOGK w/ <br />-F-F-F J L METAL HANGER + J <br />51MP50N TITEN SGREWS •ALL METAL HANGERS SHALL BE SPECIFIED BY THE TRU55 CC E <br />INDICATES POST ABOVE. PROVIDE 50LID MANUFACTURER, UNLE55 OTHERWISE NOTED. Z a <br />BLOGKIN6 UNDER P05T OR JAMB ABOVE. A a <br />• ERECT AND INSTALL ROOF TRU55E5 PER WTGA 4 TPI 5 BG51 I o, <br />\ fit <br />I ~ "GUIDE TO 6000 PRACTICE FOR HANDLING, IN5TALLIN6 8 BRAGIN6 m <br />If U_ OF METAL PLATE GONNEGTED WOOD TRU55E5." LU W ° E <br />\ MAINTAIN 24 O.G. SPACING O • ROOF TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH 4 EN6. = a > A <br />\ I / OVER MEGH. GL05ET I r_ v FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. �.. d <br />CM <br />miZ �o <br />IL • SUPPORT PORCH d SHORT SPAN ROOF TRU55E5 w/ 2x4 LEDGER W <br />FASTENED TO FRAMING w/(2) 3"x0.131" NAILS 0 16" O.G. e <br />\ lu <br />HIP C71RDER TRU55 / cc m <br />I \ / I oe � a. <br />\ / I M&K project number: <br />068-2001 1 <br />project mgr: J s B <br />I \ / I drawn by: DJ R <br />issue date: 1 1-18-2 j <br />REVISIONS: <br />I I I date: initial: <br />5D-2 I I I <br />I I <br />REFER TO 5-0.0 FOR TYP I GAL <br />I I 5TRUGTURAL NOTES 5GHEDULE5 CU <br />I � <br />I I SD-2 <br />0 <br />I I I <br />I I <br />I O I d <br />Li <br />Ca <br />STRUG I URAL 6ABLE END ROOF TRU55LL <br />I <br />O <br />ROOF 61 RDER TRU55 W <br />TRU55 O.F. / / I �--+ Z <br />Lu 0 24 O.G. <br />o <br />\ I a <br />N TRU55 O.F. L z U) <br />24" O.G. I o <br />N <br />LO <br />3-PT. BR6. ROOF p <br />~ I HIP GIRDER TRU55 TRU55E5 0 24" O.G. I d <br />U <br />HIP 61RDER TRU55 I ~ <br />ii <br />F <br />U_ <br />tL — — — — — — I — — — — — o0 0 U) <br />x <br />LU <br />v D <br />1 - - - - - - - - - - < 0 O z <br />' Q J J <br />3 ROOD RANI I N6 PLAN sheet: <br />5D-2 I SCALE: 1/4"= I'-0" (2244 SHEET) <br />SCALE: 1/6"=1'-O" (IlxI1 SHEET) <br />Sm <br />1 .3 <br />UPL I �T CONNECTORS <br />BEARING CONDITION <br />TRU55 <br />CONNECTOR <br />LENGTH <br />< 15' <br />SIMP50N H2.5T <br />SINGLE ROOF TRU55 BEARIN6 ON <br />> 15' <br />S1MP50N HIOA <br />WOOD STUD WALL/WOOD BEAM <br />ROOF 61 RDER TRU55 BEARIN6 ON <br />ALL <br />51 MP50N HT520 <br />WOOD STUD WALL/WOOD BEAM <br />SINGLE ROOF TRUSS OR PORCH <br />ALL <br />51MPSON HETAI6 <br />BEAM BEARING ON GMU WALL <br />ROOF 6.T., FLUSH BEAM OR <br />ALL <br />(2) SIMPSON HETAI6 <br />FLUSH G.T. BR6. ON GMU WALL <br />ALL BEARIN6 POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED <br />WITH CONNECTOR A5 LISTED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN <br />THE UPLIFT CONNECTORS PER SECTION 2.2 OF AN51/TPIr2014 <br />"NATIONAL DESIGN STANDARDS FOR METAL PLATE CONNECTED WOOD <br />TRU55 CONSTRUCTION". MdK HAS ENGINEERED ALL ROOF TRU55 UPLIFT <br />CONNECTORS IN ACCORDANCE WITH THE REQUIREMENTS OF ASGE-7-I6. <br />ALL UPLIFT CONNECTORS AND LOADS PER THIS DRAWING SHALL <br />SUPERSEDE THE TRU55 MANUFACTURER'S UPLIFT CONNECTOR <br />SPECIFICATIONS AND LOADS SHOWN ON THE SHOP CARDS. <br />