Laserfiche WebLink
t) <br />_i <br />Lh <br />IM <br />O <br />I <br />� <br />1 <br />4'-211 4'-6" 3'-0" 6'-4" 5-01/2" 5'-1 11211 4'-6" 6'-0" <br />MB-1 MB-1 MB-1 <br />r-- <br />%n <br />i <br />T— <br />I <br />� (V <br />� tY� <br />1 <br />51_011 31 <br />_211 51_211 1_011 161_011 21-011 <br />ge <br />Jf <br />13'-411 51_411 20'-011 <br />01 (ZBLOCK FLAN <br />SCALE: I/4"=1'-0" (22x34 5HEET) <br />SCALE: 1/5"=l'-0" (Ilxll SHEET) <br />• ® INTERIOR BEARIN6 WALL <br />• _ BEARIN6 WALL ABOVE <br />• BEAM / HEADER <br />• LOGATION AND EXTENT OF 5HEARWALL <br />• I: : I EXTENT OF OVERERAMIN6 <br />•—'—--INDIGATE5 1/8"A" 5AW GUT GONTROL JOINT <br />INDIGATE5 LOGATION OF REINEORGED GMU GORE <br />El (SEE NOTES) <br />J L METAL HAN6ER <br />INDIGATE5 P05T ABOVE. PROVIDE 50LID <br />t3LOGKIN6 UNDER POST OR JAMB ABOVE. <br />MABONRY LINTEL PETA I LB <br />REINFORGEMENT <br />MARK <br />DE516NATION <br />TOP <br />BOTTOM <br />SHEAR REINFORGEMENT <br />MB-I <br />8F8-OB/0T <br />----- <br />---- <br />MB-2 <br />SF8-IB/OT <br />----- <br />(1) #5 <br />MB 3 <br />8FI6-I6/IT <br />(1) #5 <br />(1) #5 <br />MB-4 <br />8RF14-IB <br />----- <br />----- <br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PREGA5T CO., <br />AND LOTT'S CONCRETE. <br />NOTE5: <br />I. ALL LINTEL5 w/ 5PAN5 6REATER THAN 14'-0" 5HALL BE PRE5TRE55ED. <br />2. 5HORE FILLED LINTEL5 A5 REQURIED. <br />3. ALL LINTEL5 5HALL HAVE 4" MINIMUM BEARIN6 U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTELS. <br />5. ALL REINFORCEMENT 5HALL BE 6RADE 60, fy=60 k5i <br />6. ALL LINTELS 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE516N. <br />1. ALL LINTELS ARE TO BE LOCATED DIRECTLY ABOVE THE OPENIN6 BELOW <br />MASONRY' L I NTEL A55EMBL I E5 <br />5EE 5GHEOULE AND 5PEGIFIGATION5 FOR ADD'L INFO <br />rr---T rr--�, <br />MIN. (1) COUR5E/13OND I i MIN. (1) COURWSOND <br />L4J I BEAM ABOVE LINTEL i L4J I BEAM ABOVE LINTEL <br />6ROI7f GROUT <br />BOTTOM REIN. <br />4Q� PREGA5T LINTEL Pi/� Q � PREGAST LINTEL w/ <br />__ � EMBEDDED REIN. # EMBEDDED REIN. <br />MB-1 MB-2 <br />L -- i �4J— TOP Co", IF <br />itm i_Q_J I TOP COURSE, IF REG t) PER ARCH. <br />i i REQ'D PER ARCH. - -� <br />• TOP REINF. OR CONT. GONT• BOND BEAM <br />BOND BEAM REIN. REIN. A5 REQ D <br />GROUT <br />6ROUT _ BOTTOM REIN. <br />BOTTOM REIN. _a PREGA5T LINTEL W <br />EMBEDDED REIN. <br />. I PRECAST LINTEL w/ <br />i'-�A-� IR EMBEDDED REIN. <br />MB-3 N M13-4 <br />REFER TO 5-0.0 FOR TYPICAL <br />STRUCTURAL NOTES ff SCHEDULES <br />seal: �� � fJ 3 <br />® <br />CE, ^ <br />OF <br />1 <br />AeO <br />copyright : MULHERN P - <br />sjr al �ng e822. <br />C <br />z <br />IIIJ LU <br />w <br />w <br />=z <br />CJ <br />c� <br />z <br />w <br />a- <br />J <br />i <br />� <br />Q <br />Z= <br />C) <br />A <br />Q <br />� <br />W F- <br />y <br />C <br />� Q) <br />=CZ <br />3:Q <br />ME <br />> <br />J~ <br />A <br />a� <br />z <br />W <br />p <br />�CD <br />ti <br />o `r <br />y <br />M � <br />W <br />CD N <br />c <br />CD <br />M a <br />IV <br />IV <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />J S B <br />drawn by: <br />p,JR <br />issue date: 0 `I - `I 4-22 <br />REVISIONS: <br />date: <br />initial: <br />sheet: <br />M <br />Cz <br />Fm2.0 <br />