Laserfiche WebLink
40'-011 <br />S <br />No 7 <br />0+0 21'-4" 18'-8" <br />• INTERIOR BEARIN6 WALL <br />PATIO SLAB: <br />12" WIDE <br />GONG.---� <br />A <br />=� �T o <br />HVAG <br />3 Y2 GONG. SLAB ON 6RADE (2500 P51 MIN.) <br />TURNDOWN <br />BEARIN6 WALL ABOVE <br />��°° <br />UNIT SD -I <br />w/ 6x6-W1.4xW1.4 MESH OR FIBER MESH ON <br />EXTENDED <br />MIN. 12 BEAM /HEADER <br />q5% GOMPAGTED FILL OR V I R61 N SOIL. <br />BELOW <br />6RADE <br />• LOCATION AND EXTENT OF SHEARWALL <br />© copyright : MULHE LP <br />r-.-.-.-.� <br />• I: � :::::: ; I EXTENT OF OYERFRAMIN6 <br />Structural Engineering, Inc. <br />• • • • • <br />------ —------- <br />— — — — - �� — �i� <br />------=----3y2" STEP <br />Z <br />N <br />- <br />• - —INDICATES I/S"A" SAW GUT CONTROL JOINT <br />� °; <br />LU <br />Q I <br />5D-I q <br />INDICATES LOCATION OF REINFORCED GMU GORE <br />El <br />=LU <br />Z o <br />c <br />z <br />I <br />(SEE NOTES) <br />i 5D-I SD-1 <br />y„3 5TSTEP <br />I I 2 /2 <br />J � METAL HAN6ER <br />W aa <br />L <br />+ CD <br />• <br />_.. --- __ ___ _..-- -_ .--.._-- _._._ -.- _-_.-. _ ._ _.. -.- <br />I I • • • • • • <br />�` INDICATES P05T ABOVE. PROVIDE 50LID <br />Z Cr- E E <br />F a <br />�_g — <br />13LOGKIN6 UNDER P05T OR JAMB ABOVE. <br />_ CM <br />6 _411 11 <br />E <br />i <br />REFER TO 5-0.0 FOR TYPIGAL <br />m E <br />STRUGTURAL NOTE5 5GHEDULE5 <br />Z " Q <br />• I FRENCH DOOR REGE55 I <br />I <br />Jz Mo <br />CP <br />a o f <br />PER MANUFAGTURERS <br />INSTRUCTION I • <br />— <br />UJ m <br />Lil N <br />�. co Q. <br />i I <br />I I I <br />"W- <br />GONGRETE SLAB: I <br />M&K project number: <br />c� <br />I 3l2" GONG. SLAB ON I <br />068-200 1 1 <br />6RADE (2500 PSI MIN.) w/ <br />6x6-W1.4xW1.4 MESH OR I <br />project mgr: JSB <br />FIBER MESH OVER 6 MIL. I <br />drawn by: DJR <br />I POLY ON q5% GOMPAGTED I <br />issue date: 0 j `� 7 2 2 <br />• FILL OR VIR61N SOIL. <br />REVISIONS: <br />I NOTE: REFER TO BLOCK I <br />date: initial <br />• I PLAN FOR ALL DOWEL <br />-LOGATION DIMENSIONS. I • <br />o <br />o <br />r41 <br />2 <br />I 12 <br />i I <br />� <br />O <br />20'-0" oe 20'-0" <br />Of <br />�------ <br />--y2" 5TEP------- <br />I <br />I <br />4 4 <br />I i <br />I <br />Q <br />3 y2 �� STEP o <br />I • <br />0 <br />6ARA6E SLAB: I <br />3 r2" GONG. SLAB ON 6RADE sm <br />I <br />• I (2500 P51 MIN.) w 6x6-W1.4xW1.4 I 7 <br />j„j <br />MESH OR FIBER U5H OVER 6 5D-I <br />co <br />MIL. POLY ON q5% GOMPAGTED <br />FILL OR VIRGIN SOIL. L 3 STE—I— <br />P <br />I <br />0 Z <br />IL <br />N <br />5D-I <br />I <br />U) <br />I I I <br />IZ <br />co <br />• = <br />UJ d <br />I LU <br />----- ---------- L-o <br />---- ---J <br />n 0 Z <br />V-1 <br />J J <br />sheet: <br />1 3 <br />2 <br />SLAB PLAN <br />Q <br />5D-I 5D-I <br />20'-8" 5'-4" <br />SD -I <br />14" '-0 <br />I SCALE: 1/4"=1'-O" (22x34 SHEET) <br />SCALE: 1/6"=1'-O" (Ilxll SHEET) <br />FihM <br />40'- <br />" <br />• <br />y .. <br />