Laserfiche WebLink
2.5 TON CU <br />SA(EX.) SA(EX.) <br />�o <br />0 0 <br />Z�t <br />0 <br />MECHANICAL PARTIAL FLOOR PLAN - <br />CONSTRUCTION VENTILATION AND DEMOLITION <br />SCALE: 1/4" = V - 0" <br />CU-1 <br />O5 TON_ C: <br />0 0 <br />MANUFACTURER SIZED <br />REFRIGERANT LINES <br />800 800 800 <br />@� @� O4 <br />CONDENSATE DRAIN <br />TO SPLASHBLOCK <br />75 CFM <br />O.A. <br />2325R <br />MECHANICAL PARTIAL FLOOR PLAN - <br />NEW CONSTRUCTION <br />KEYED NOTES <br />OREMOVE EXISTING AHU-4 AND CONDENSING UNIT AND ALL <br />ASSOCIATED DUCTWORK, SUPPORT, WIRING, THERMOSTAT, <br />CONDENSATE DRAIN, DIFFUSERS/GRILLES, ETC. <br />O30x8 SIDEWALL SUPPLY GRILLES, TITUS MODEL 30OFS OR <br />EQUIVALENT. <br />O (2) 24x24 FILTERED RETURN GRILLES WITH MERV 8 <br />FILTERS <br />OPROVIDE PROPER SERVICE ACCESS FOR AHU AND HEATER <br />CONTROLS. <br />OREFER TO PIPING DETAIL ON SHEET M501. <br />CONSTRUCTION VENTILATION <br />1. CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE INFECTION <br />CONTROL RISK ASSESSMENT (ICRA) PREPARED FOR THIS PROJECT. CONTRACTOR <br />SHALL REVIEW THE REQUIREMENTS IN THE REPORT AND PERFORM ALL WORK IN <br />ACCORDANCE WITH THOSE REQUIREMENTS. CONTRACTOR SHALL STRICTLY ADHERE <br />TO THE LIMITS OF CONSTRUCTION AREA, AND WHERE PHASING APPLIES SHALL <br />ADHERE TO THE PHASING PLAN. ANY WORK OUTSIDE THE CONSTRUCTION AREA <br />SHALL BE COORDINATED WITH THE OWNER AND PERFORMED IN ACCORDANCE <br />WITH THE ICRA REPORT, UNDER THE SUPERVISION OF THE OWNER'S <br />REPRESENTATIVE OR OTHER DESIGNATED ICRA COMMITTEE OFFICER. <br />2. TO THE EXTENT THAT IT IS REQUIRED BY THE ICRA, THE CONTRACTOR <br />SHALL ENDEAVOR TO MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN <br />AREAS SURROUNDING AND ADJACENT TO THE CONSTRUCTION WORK ZONE, AND <br />ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA <br />REPORT WILL REQUIRE MEASURES TO THIS EFFECT INCLUDING ERECTION OF <br />CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE AIR PRESSURE <br />IN THE CONSTRUCTION ZONE RELATIVE TO OTHER AREAS OF THE NEW FACILITY. <br />3. CONSTRUCTION VENTILATION REQUIREMENTS FOR THIS PROJECT ARE TO <br />MAINTAIN .02" WG NEGATIVE PRESSURE IN ALL CONSTRUCTION AREAS, OR <br />THAT LISTED IN THE OWNERS ICRA, WHICHEVER IS GREATER. ALL EXHAUST <br />AIR SHALL BE FILTERED THRU PORTABLE AIR SCRUBBER MACHINES EQUIPPED <br />WITH 99.97% EFFICIENT FILTERS, AND THAT MEET EPA, OSHA, NEC, AND ANSI <br />STANDARDS. AIR TO BE EXHAUSTED TO THE EXTERIOR OF THE STRUCTURE, OR <br />THE CORRIDOR AS INSTRUCTED BY THE OWNER. <br />4. IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE <br />CONTRACTOR AT A MINIMUM SHALL PROVIDE EQUIPMENT AND COMPONENTS <br />NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION WORK <br />ZONE RELATIVE TO ADJACENT AREA. EXISTING HVAC SYSTEMS AND COMPONENTS <br />SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY <br />THE OWNER'S INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS <br />OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS <br />AND AT A MINIMUM AS FOLLOWS: <br />A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE <br />CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED <br />DURING THE CONSTRUCTION DURATION. <br />B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE <br />FILTERED AND/OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. <br />C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR <br />APPROVAL BY THE INFECTION CONTROL COMMITTEE. <br />D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE <br />IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND <br />PROVIDE DOCUMENTATION TO THE OWNER AS REQUIRED. <br />5. COORDINATE IN ADVANCE ANY REQUIRED EQUIPMENT SHUTDOWN WITH <br />THE OWNER, AND VERIFY BEFORE SHUTDOWN THAT EXISTING OR DESIRED AIR <br />PRESSURE RELATIONSHIPS WILL NOT BE ADVERSELY AFFECTED. <br />CONSTRUCTION VENTILATION KEYED NOTES <br />OCONTRACTOR TO PROVIDE AS MANY NEGATIVE AIR UNITS AS REQUIRED TO <br />MAINTAIN THE NEGATIVE AIR PRESSURE AS REQUIRED BY THE OWNER IN <br />AREA OF RENOVATION DURING ALL PHASES OF CONSTRUCTION. SEE <br />"CONSTRUCTION VENTILATION" NOTES ON THIS SHEET. <br />O CONTRACTOR TO ROUTE EXHAUST DUCT OUTSIDE CONSTRUCTION BARRIER AND <br />TERMINATE AS PER OWNER REQUIREMENTS. <br />CO PROVIDE MAGNAHELIC GAUGE TO MONITOR NEGATIVE AIR PRESSURE IN <br />CONSTRUCTION AREA. <br />OD CONSTRUCTION BARRIERS BY OTHERS. SEE ARCHITECTURAL PLANS FOR EXACT <br />LOCATION. <br />�E AT AREAS REQUIRING ABOVE CEILING WORK, INCLUDING PIPING, CONDUIT, AND <br />WIRE ROUTING, PROVIDE PORTABLE AIR SCRUBBER UNITS, ABATEMENT <br />TECHNOLOGIES - AIRE GUARDIAN MOBILE CONTAINMENT CUBE, OR EQUIVALENT. <br />DEMOLITION LEGEND <br />SYMBOL <br />DESCRIPTION <br />EXISTING TO REMAIN <br />—_— <br />EXISTING TO BE REMOVED <br />DEMO TO THIS POINT <br />NEW CONSTRUCTION LEGEND <br />SYMBOL <br />DESCRIPTION <br />NEW CONSTRUCTION <br />EXISTING TO REMAIN <br />CONNECT TO EXISTING AT THIS POINT <br />AA 26001479 <br />Sheet Notes: <br />Smith <br />Seckman <br />Reid, Inc. <br />301 North Cattlemen Road, Suite 300 <br />Sarasota, FL 34232 <br />(941) 907-7750 <br />FAX: (941) 907-7751 <br />www.ssr-inc.com <br />Firm Certification - CA-0000857 <br />SSR# 1636044.0 <br />Erick Phelps - PE #64598 <br />Christopher E. Durliam - PE #76655 <br />``x%kII 1111////, <br />K P HF <br />No. 64598 <br />O°.°• STATE OF <(/` <br />ERICK PHELPS <br />PE - 64598 <br />F LC) k L -, .� \AN� <br />� k- <br />............ <br />$~S I L 1 A L I S T <br />Key Plan <br />kAADI! ICCI IC IIATC n1 7QPRIDW AI <br />Issue Log <br />CONSTRUCTION <br />DOCUMENTS <br />FLORIDA CANCER SPECIALISTS <br />EQUIPMENT REPLACEMENT <br />38010 MEDICAL CENTER AVE. <br />ZEPHYRHILLS, FL 33540 <br />Drawing Title <br />MECHANICAL PARTIAL <br />FLOOR PLAN - DEMOLITION <br />& NEW CONSTRUCTION <br />71604 <br />07/15/2016 <br />SCALE: 1/4" = 1'- 0" <br />Scale <br />Drawn By <br />Approved By <br />Filename <br />SWWo, LLC 2007 <br />1/4" = 1'- 0" Sheet Number <br />DAO M300EAP <br />