<br />GENERAL DEMOLITION NOTES
<br />1. IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO PROVIDE FOR FIRE RETARDANT WOOD NAILER
<br />ALL REQUIRED DEMOLITION TO BE PERFORMED, WITHOUT SPECIFICALLY I><
<br />ADDRESSING EACH AND EVERY ITEM. CONTRACTOR TO PROVIDE FOR ALL CLOSE CEILING SPACE WITH 6
<br />INCIDENTAL AND ASSOCIATED DEMOLITION REQUIRED FOR RENOVATED OR CLOSE OPEN DUCTS W/25 MIL FIRE -RETARDANT POLY.
<br />NEW WORK TO BE CONSIDERED COMPLETE. GA. GALV. SHEET METAL SEAL ALL JOINT PENETRATIONS
<br />2. DEMOLITION KEYNOTES: REFER TO KEYNOTE LEGEND FOR EXPLANATION 7 AND PERIMETER WITH DUCT
<br />OF EACH NUMBERED ITEM ON THE DEMOLITION PLAN. SPECIFIC DEMOLITION SEAL AROUND ALL PIPE TAPE
<br />ITEMS ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN AND DUCT PENETRATIONS
<br />THEMSELVES. ADDITIONAL DEMOLITION NOT DIRECTLY INDICATED MAY BE IN THE PARTITION AND
<br />REQUIRED TO ACHIEVE THE DESIRED RESULT. POLY BARRIER WITH DUCT
<br />3. SITE VISIT: PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE TAPE
<br />FACILITY AND THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING EXIST GWB OR ACT CEILING
<br />CONDITIONS. NO CLAIMS FOR ADDITIONAL WORK DUE TO UNFORESEEN
<br />PLASTER TAPE ALL JOINTS;
<br />CONDITIONS WILL BE CONSIDERED
<br />4. ADDITIONAL ITEMS: FOR DEMOLITION AND PHASING, WHERE INDICATED,
<br />ACCEPTABLE SUBSTITUTION:
<br />REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL OR PLUMBING DRAWINGS
<br />MOBILE DUST CONTAINMENT AND
<br />AND SPECIFICATIONS FOR ADDITIONAL INFORMATION SPECIFIC TO EACH
<br />FIRE RATED, SMOKE TIGHT
<br />?%OLTTION WORK: CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE
<br />CONSTRUCTION ISOLATION
<br />BARRIER UNITS BY 'KONTROL
<br />COMPRESSIBLE INSULATION
<br />INCONVENIENCE TO ADJACENT OCCUPIED BUILDING AREAS AS POSSIBLE.
<br />KUBE" (OR EQUAL).CONTAINMENT
<br />DEMOLISH IN AN ORDERLY AND CAREFUL MANNER AS REQUIRED TO
<br />UNIT TO HAVE
<br />ACCOMMODATE NEW WORK. PROTECT EXISTING SUPPORTING STRUCTURAL
<br />JOINT COMMISSION COMPLIANCE
<br />CONTINUOUS SEALANT BEAD
<br />MEMBERS. PERFORM DEMOLITION IN ACCORDANCE WITH APPLICABLE
<br />DOCUMENTATION
<br />AUTHORITIES HAVING JURISDICTION. SCHEDULE ALL DEMOLITION WORK WITH
<br />FINISH OCCUPIED SIDE WITH
<br />OWNER PRIOR TO START OF THE WORK. GENERAL CONTRACTOR SHALL
<br />GLOSS PAINT
<br />COORDINATE ALL TRADES TO ENSURE THE WORK IS PERFORMED IN A
<br />TIMELY MANNER AS SCHEDULED.
<br />RENOVATION SIDE
<br />OCCUPIED SIDE
<br />6. EXISTING SYSTEMS: ALL EXISTING SYSTEMS SUCH AS ALARMS,
<br />ELECTRICITY, WATER SPRINKLERS, ETC. SHALL REMAIN ACTIVE AT ALL
<br />NOTE
<br />TIMES DURING DEMOLITION AND CONSTRUCTION, ANY EXCEPTION TO THIS
<br />.�Jp
<br />ADEQUATE BRACING
<br />5/8" GWB ON 3 5/8" MTL
<br />SHALL BE COORDINATED WITH OWNER AND ARCHITECT PRIOR TO THE
<br />FOR POLY BARRIER TO
<br />STUDS 1 HR) - U.L. DESIGN
<br />IEE&NFLICTS: ANY CONFLICTS FOUND WITH EXISTING CONDITIONS AND
<br />ENSURE A CONTINUOUS
<br />96D INSULATION BAITS
<br />REQUIREMENTS FOR NEW CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT
<br />SEAL WHILE MAINTAINING
<br />TO THE ATTENTION OF THE ACHITECT. IF THE CONFLICT AFFECTS THE
<br />REQUIRED NEGATIVE AIR
<br />SEAL PERIMETER OF WALL WITH
<br />PROGRESS OF THE WORK, VERIFY WITH ARCHITECT SOLUTION NECESSARY
<br />PRESSURE
<br />DUCT TAPE
<br />PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK. COORDINATE
<br />. SECURE ALL TAPE W/E& CONTINUOUS SEALANT BEAD
<br />ALL TRADES TO ASCERTAIN NO FURTHER WORK WILL BE IMPACTED BY THE
<br />HIGH TACK SPRAY OR COMPRESSIBLE INSULATION
<br />CONFLICT OR ITS SOLUTION.
<br />EQUAL
<br />EQU
<br />8. REMOVE AND REPLACE EXISTING CONSTRUCTION AS NECESSARY TO
<br />COMPLETE THE MECHANICAL, ELECTRICAL AND PLUMBING DEMOLITION WORK
<br />AT THIS FLOOR LEVEL, ABOVE AND BELOW. EXAMPLE: PENETRATE AND
<br />CONSTRUCTION BARRIER D ETAI L
<br />PATCH STRUCTURAL FLOOR, PARTITIONS, CEILINGS AND FIRE PENETRATIONS
<br />FOR MECHANICAL, ELECTRICAL AND PLUMBING PENETRATIONS.
<br />S(ALE: 3" = 1'-0"
<br />9. COORDINATE AND SCHEDULE ACCESS TO ALL DEPARTMENTS OUTSIDE OF
<br />THIS SCOPE OF WORK WITH THE OWNER PRIOR TO ANY WORK.
<br />10. PROVIDE NEGATIVE AIR PRESSURE FROM ALL AREAS UNDER
<br />RENOVATION FOR THE DURATION OF DEMOLITION AND CONSTRUCTION.
<br />f CEILING AS SCHEDULED
<br />11. STRUCTURE: PREVENT MOVEMENT OR SETTLEMENT OF STRUCTURE.
<br />- -
<br />PROVIDE AND PLACE BRACING OR SHORING AND BE RESPONSIBLE FOR
<br />ONE LAYER 5/8"
<br />SAFETY AND SUPPORT OF STRUCTURE. ASSUME LIABILITY FOR SUCH
<br />GWB TOP OF
<br />MOVEMENT, SETTLEMENT, DAMAGE OR INJURY. CEASE OPERATIONS AND
<br />PARTITION
<br />NOTIFY THE ARCHITECT IMMEDIATELY IF SAFETY OF THE STRUCTURE
<br />APPEARS TO BE ENDANGERED. TAKE PRECAUTIONS TO PROPERLY
<br />CONT. TRACK
<br />SUPPORT THE STRUCTURE. DO NOT RESUME OPERATIONS UNTIL SAFETY IS
<br />ffS CTION: EXERCISE CARE DURING WORK TO PROTECT EXISTING
<br />CONSTRUCTION TO REMAIN. REPAIR TO EXISTING CONSTRUCTION DUE TO
<br />DAMAGE SHALL BE DONE AT NO COST TO THE OWNER.
<br />13. CONSTRUCTION SEPARATION PARTITIONS: ERECT AND MAINTAIN DUST
<br />3 5/8" METAL STUDS ® 16" O.C.
<br />PROOF PARTITIONS AS REQUIRED TO PREVENT SPREAD OF DUST, FUMES
<br />AND SMOKE TO OTHER PARTS OF THE BUILDING. PARTITIONS SHALL BE
<br />MINIMUM 1-HOUR RATED CONSTRUCTION WHEN SEPARATING WORK FROM
<br />ONE LAYER LEAD -LINED 5/8" GWB ON
<br />OCCUPIED AREAS, ALONG EXIT ACCESS CORRIDORS AND BUILDING EXITS
<br />PROCEDURE SIDE OF PARTITION
<br />OR WHERE REQUIRED BY CODE OR GOVERNING AUTHORITY. ON
<br />COMPLETION, REMOVE PARTITIONS AND REPAIR DAMAGED SURFACES TO
<br />PROCEDURE ROOM SIDE
<br />MATCH ADJACENT SURFACES AND FINISHES. (SEE
<br />7
<br />WA60WMWIMATERIALS: EXCEPT WHERE NOTED OTHERWISE, MAINTAIN
<br />ONE LAYER 5/8" GWB ON NON -
<br />POSSESSION OF ALL MATERIALS BEING DEMOLISHED. EQUIPMENT AND
<br />PROCEDURE SIDE OF PARTITION
<br />ARTICLES OF VALUE REMAIN THE PROPERTY OF THE OWNER. NOTIFY THE
<br />ARCHITECT PRIOR TO REMOVAL AND OBTAIN ACCEPTANCE REGARDING
<br />METHOD OF REMOVAL REMOVE ALL MISCELLANEOUS MATERIALS,
<br />SOUND ATTENUATION INSULATION
<br />LINE OF STRUCTURE
<br />CONNECTORS, FASTENERS, FLOORING, CEILING TILE AND GRID, ETC., NOT
<br />REQUIRED FOR NEW CONSTRUCTION. ARTICLES OF NO VALUE, INCLUDING
<br />CONT. RUNNER
<br />TRASH, DEBRIS, WASTE MATERIALS, ETC., SHALL BE IMMEDIATELY REMOVED
<br />FROM THE SITE AND DISPOSED OF IN A LEGAL, APPROVED MANNER.
<br />1
<br />15. REPAIR: REPAIR ALL DEMOLITION PERFORMED IN EXCESS OF THAT
<br />CONT. SEALANT
<br />BOTH SIDES OF
<br />REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
<br />PARTITION
<br />16. DISPOSAL- REMOVE FROM SITE ALL CONTAMINATED, VERMIN INFESTED
<br />OR DANGEROUS MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE,
<br />��11/2- GAP AT BOTTOM GWB TYP.
<br />APPROVED MEANS SO AS NOT TO ENDANGER THE HEALTH OF WORKERS
<br />AND PUBLIC. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
<br />17. COMPLETION OF CONSTRUCTION PHASES: REMOVE ALL DEMOLISHED
<br />MATERIALS, TOOLS, EQUIPMENT, ETC., FROM THE SITE UPON COMPLETION
<br />NON RATED
<br />OF THE WORK. LEAVE SITE IN CONDITION ACCEPTABLE TO THE ARCHITECT,
<br />AND READY FOR THE NEXT PHASE OF WORK.
<br />LEAD -LINED LOW -WALL,
<br />18. REFER TO HOSPITAL'S PROTOCOLS FOR INFORMATION REGARDING
<br />INFECTION CONTROL AND DEMOLITION AND CONSTRUCTION. THESE
<br />PROTOCOLS ADDRESS BUT ARE NOT LIMITED TO THE FOLLOWING:
<br />PARTITION
<br />A. REMOVAL OF DEBRIS FROM THE PROJECT.
<br />B. DELIVERY OF NEW MATERIALS INTO THE BUILDING.
<br />A.) 3-5/8" METAL STUDS ® 16" O.C., TYP.
<br />C. STORAGE OF CONSTRUCTION MATERIALS.
<br />B.) 5/8" LEAD -LINED GWB AT PROCEDURE SIDE OF WALL.
<br />D. CLEANING OF DUST AND DEBRIS FROM BOTH CONSTRUCTION AND
<br />C.) 5/8" GWB AT NON -PROCEDURE SIDE AND TOP OF WALL.
<br />OCCUPIED AREAS.
<br />D.) USE LOW -WALL PARTITION BRACE WHERE INDICATED -
<br />19. MAINTAIN AT ALL TIMES THE FIRE RATED INTEGRITY OF ALL VERTICAL
<br />SEE FLOOR PLANS AND DETAIL C2/A001.
<br />SHAFTS.
<br />20. CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO ALL
<br />HOSPITAL PROTOCOLS AS THEY RELATE TO CONSTRUCTION NOISE,
<br />LINE OF STRUCTURE
<br />VIBRATION, INFECTION CONTROL AND ANY OTHER THAT MAY AFFECT THE
<br />ONGOING SAFE OPERATION OF THE FACILITY DURING CONSTRUCTION.
<br />21. CONTRACTOR SHALL ROUTE/SCHEDULE DELIVERY OF CONSTRUCTION
<br />MATERIALS AS WELL AS THE REMOVAL OF CONSTRUCTION DEBRIS TO
<br />MINIMIZE ITS IMPACT TO HOSPITAL OCCUPIED AREAS.
<br />EXTEND GWB TO 6" ABOVE CLG.
<br />22. NO CONSTRUCTION MATERIALS SHALL BE STORED IN OCCUPIED
<br />PATIENT AREAS.
<br />23. CONTRACTOR SHALL SWEEP AND DAMP MOP FLOORS ALONG THE
<br />AREAS OF MATERIAL MOVEMENT TO LIMIT THE SPREAD OF DUST AND
<br />DEBRIS THROUGHOUT THE OCCUPIED AREAS.
<br />CEILING AS SCHEDULED
<br />24. THE INTEGRITY OF THE FIRE/SMOKE COMPARTMENTS SHALL BE
<br />MAINTAINED AT ALL TIMES DURING THE CONSTRUCTION PROCESS,
<br />ONE LAYER 5/8" LEAD -LINED GWB
<br />DURING PHASED CONSTRUCTION, SHOULD A FIRE/SMOKE BARRIER BE
<br />REMOVED, EITHER A PERMANENT NEW BARRIER OR TEMPORARY BARRIER
<br />MEETING THE REQUIREMENTS OF THAT BARRIER WHICH IS BEING REMOVED
<br />FURRING TO MATCH EXISTING ADJACENT
<br />SHOULD BE CONSTRUCTED BEFORE THE EXISTING BARRIER IS REMOVED.
<br />(DEPTH, SPACING, ETC.) CONSTRUCTION
<br />25. IF DURING THE DEMOLITION PROCESS, THE CONTRACTOR ENCOUNTERS
<br />DAMAGE AFFECTING THE INTEGRITY OF ANY EXISTING RATED
<br />EXISTING WALL
<br />WALL/MEMBRANE, HE SHALL REPAIR SUCH DAMAGE IN ORDER TO RETURN
<br />WALL/MEMBRANE TO ITS INTENDED FIRE/SMOKE RATING.
<br />26. FIRE ALARM AND SMOKE DETECTION SYSTEMS SHALL REMAIN ACTIVE
<br />DURING THE ENTIRE CONSTRUCTION PROCESS, SPRINKLER HEADS MAY BE
<br />COVERED DURING HOURS OF CONSTRUCTION, BUT MUST BE REMOVED
<br />DURING IDLE HOURS. SHOULD THE ABOVE BE IMPOSSIBLE, A FIRE WATCH
<br />CONT. SEALANT
<br />SHALL BE ESTABLISHED UNTIL SUCH TIME AS THE AUTOMATIC SYSTEMS
<br />CAN BE PLACED BACK INTO OPERATION.
<br />27. IF THE FIRE PROTECTION SPRINKLER SYSTEM AND/OR THE REQUIRED
<br />FIRE ALARM SYSTEM IS SHUT DOWN GREATER THAN 4 HOURS IN A
<br />24-HOUR PERIOD, THE AUTHORITY HAVING JURISDICTION SHALL BE
<br />1 2" GAP AT BOTTOM GWB TYP.
<br />/
<br />NOTIFIED AND AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL
<br />PARTIES LEFT UNPROTECTED BY THE SHUTDOWN UNTIL THE SPRINKLER
<br />2
<br />SYSTEM AND/OR FIRE ALARM SYSTEM HAS BEEN RETURNED TO SERVICE.
<br />28. CONSTRUCTION BARRIERS MUST BE COMPLETED BEFORE DEMOLITION
<br />N 0 N RATED
<br />BEGINS. POST SIGNAGE AS REQUIRED AT DOORS TO THE WORK AREA:
<br />"CONSTRUCTION AREA - DO NOT ENTER"
<br />LEAD -LINED, SINGLE
<br />29. CONSTRUCTION BARRIERS ARE TO MAINTAIN ACCESS TO ALL ACTIVE
<br />MEDICAL GAS ISOLATION, CONTROL VALVES AND ALARM PANELS.
<br />SIDED, FURRED PARTITION.
<br />30. PROVIDE TEMPORARY EMERGENCY EGRESS LIGHTING, SIGNAGE, FIRE
<br />ALARM DEVICES AND EXTINGUISHERS AS REQUIRED.
<br />A.) FURRING TO MATCH ADJACENT EXISTING (DEPTH, SPACING, ETC.)
<br />31. NOTIFY OWNER 48 HOURS PRIOR TO OBSTRUCTION OF DOORWAYS FOR
<br />CONSTRUCTION
<br />RECONSTRUCTION OF PARTITIONS. COORDINATE WORK WITH OWNER TO
<br />B.) 5/8" LEAD -LINED GWB AT PROCEDURE SIDE OF WALL.
<br />OCCUR AT TIME OF MINIMAL USAGE, SUCH AS WEEKENDS OR AFTER
<br />C.) EXTEND GWB TO 6" MIN. ABOVE CEILING
<br />REGULAR HOURS.
<br />32. AT NO TIME SHALL ANY EGRESS DOOR OR PASSAGE BE OBSTRUCTED
<br />PROVIDING AN ALTERNATE, CODE COMPLIANT MEANS OF EGRESS,
<br />PARTITION TYPES
<br />WITHOUT
<br />B3
<br />REFER TO N.F.PA. 101 SECTION 18.7.9
<br />SCALE: NTS
<br />33. CONTRACTOR SHALL REMOVE DEBRIS FROM CONSTRUCTION AREA IN
<br />AIR TIGHT CONTAINER.
<br />EILING AS SCHEDULED
<br />LEAD LINING SHALL CONFORM TO LEAD LINING PLAN AS PROVIDED.
<br />IT SHALL BE CONTINUOUS THROUGHOUT.
<br />MAINTAIN INTEGRITY OF RADIATION SHIELDING,
<br />EAD LINING SHALL CONFORM TO PHYSICIST'S REPORT AS PROVIDED BY OWNER.
<br />IT SHALL BE CONTINUOUS THROUGHOUT.
<br />MAINTAIN INTEGRITY OF RADIATION SHIELDING.
<br />3 5/8" METAL STUDS ® 16" O.C.
<br />DNE LAYER 5/8" GWB EACH SIDE
<br />SOUND ATTENUATION INSULATION
<br />CONT. RUNNER
<br />CONT. SEALANT
<br />BOTH SIDES OF
<br />P RTITION
<br />1 /2" GAP AT BOTTOM GWB TYP.
<br />3
<br />NON RATED PARTITION
<br />A.) 3 5/8" STUDS AT 16" O.C.
<br />B.) 5/8" GWB BOTH SIDES OF STUDS TO
<br />BOTTOM OF STRUCTURE ABOVE
<br />'irt , JAMB OR SILL CONDITION
<br />.EAD LINED HOLLOW METAL FRAME
<br />FAQ IINFI> =A
<br />PROCEDURE ROOM SIDE
<br />LEAD SHIELDING TO TIE-IN TO NEW LEAD LINED PARTITION FOR CONTINUOUS RADIATION BARRIER
<br />HEAD/JAM B/SILL
<br />LEAD -LINED VIEW WINDOW
<br />C) SCALE: 3r - 1'-0r
<br />3" x 1 /4" STL CHANNEL
<br />ATTACHED TO DBL. BOXED
<br />MTL STUDS AT END OF
<br />Cn
<br />j
<br />LOW PARTITION AND STL
<br />o
<br />E a I
<br />BASE PLATE
<br />I
<br />a I
<br />CONTINUOUS WELD AT
<br />ao
<br />STEEL BASE PLATE AND
<br />STEEL CHANNEL
<br />_ I
<br />3/8" STEEL GUSSETT
<br />o
<br />WELDED TO VERT. STL.
<br />CHANNEL AND STL. BASE
<br />o W j I
<br />PLATE
<br />III
<br />I III
<br />3" x 1 /4" STEEL PLATE
<br />o Q
<br />W/ 9/16" DIA. HOLES FOR
<br />0
<br />1 /2"DIA. ANCHOR BOLTS
<br />Co
<br />TO CONC. FLOOR.
<br />8•
<br />ANCHORS SHALL BE
<br />INSTALLED IN PAIRS ALONG
<br />THE LENGTH OF THE BASE
<br />PLATE. PROVIDE FLAT H.D.
<br />BOLTS FOR FLAT
<br />INSTALLATION OF METAL
<br />SILL PLATE. RUNNER TRACK
<br />IS TO BE INSTALLED
<br />BENEATH STEEL BASE
<br />LOW -WALL PARTITION
<br />PLATE.
<br />SUPPORT BRACKET DETAIL
<br />SCALE: N.T.S.
<br />LAMINATE BACK PIECE TO GWB FACE LAYER
<br />5/8" LEAD LINED GWB AT ALL SIDES
<br />(5 SIDES) OF RECESSED OPENING
<br />SHALLOW FIVE SIDED BOX 5/8" LEAD LINED GWB AT PROCEDU E
<br />ROOM SIDE OF PARTITION (TYP)
<br />JUNCTION BOX (TYP)
<br />JUNCTION BOX AT GWB LEAD LINED PARTITION
<br />SCALE: 1 1/2" = 1'-0"
<br />►' STEEL STUDS - CHANNEL
<br />f 1 5/8" 25 MSG, GALV
<br />EXISTING/NEW - 5/8" LEAD LINED
<br />GWB AT PROCEDURE ROOM SIDE OF
<br />PARTITION (TYP)
<br />5/8" LEAD LINED GWB AT ALL SIDES
<br />r (5 SIDES) OF RECESSED OPENING
<br />t II
<br />CABLE DUCT/UTILITY BOX
<br />I I -CONTRACTOR TO VERIFY DIMENSIONS
<br />I I AND MOUNTING HEIGHT W/ APPROPRIATE
<br />I I CONSTRUCTION DOCUMENTS AND/OR
<br />I I EQUIPMENT VENDOR DOCUMENTS, OR AS
<br />I I INDICATED ON THE INTERIOR ELEVATIONS
<br />c STEEL STUDS
<br />REFER TO RADIATION PHYSICIST'S
<br />REPORT, TO DETERMINE REQUIRED
<br />L,+-' L THICKNESS AND LOCATION OF LEAD
<br />LINED GWB - RADIATION SHIELDING.
<br />EQUIPMENT AT GWB LEAD LINED PARTITION
<br />SCALE: 1 1/2" = 1'-0"
<br />PLEAD -LINED PARTITION DETAILS
<br />SCALE: AS NOTED
<br />NTERIOR FINISH NOTES
<br />GENERAL FINISH NOTES:
<br />• CONTRACTOR SHALL CLEAN AND REMOVE OLD PAINT, STAIN, ETC. FROM ALL WALL MOUNTED ACCESSORIES BEING
<br />REMOVED AND REINSTALLED.
<br />• CONTRACTOR SHALL REPAIR ALL VOIDS AND PENETRATIONS AT LEAD -LINED PARTITIONS - INSTALL LEAD -LINED GWB AS
<br />REQUIRED.
<br />• CONTRACTOR SHALL REPAIR ALL VOIDS AND PENETRATIONS AT FIRE AND SMOKE RATED PARTITIONS - INSTALL FIRESAFING
<br />AS REQUIRED FOR COMPLIANCE.
<br />• FINAL INTERIOR FINISH, COLOR, PATTERN AND MANUFACTURER SELECTION BY OWNER. COLORS & PATTERNS MAY VARY.
<br />• NEW DOORS FINISH TO MATCH EXISTING.
<br />• EXISTING FURNISHINGS AND MOVABLE EQUIPMENT TO BE RELOCATED BY OWNER.
<br />• ALL FLOORING SEAMS TO BE WELDED PER MANUFACTURER'S INSTRUCTIONS.
<br />PAINT:
<br />• ALL WALL COLORS TO BE PAINTED IN EGG SHELL FINISH.
<br />• ALL MOLDING TRIM TO BE PAINTED IN SEMI -GLOSS FINISH.
<br />• ALL DOOR TRIM TO BE PAINTED TO MATCH ADJACENT WALL COLOR; SEMI -GLOSS FINISH.
<br />• ALL WALLS TO BE PAINTED 'PT1', UNLESS NOTED OTHERWISE.
<br />• ALL METAL PAINTED DOORS, DOOR FRAMES, ACCESS DOORS, ELECTRIC PANEL COVERS,
<br />RECESSED CABINET DOORS, HVAC REGISTERS, GRILLES, ETC. (EXCEPT THOSE WHICH ARE
<br />PRE -FINISHED, STAINLESS STEEL, OR ANODIZED ALUMINUM) SHALL BE PAINTED TO
<br />MATCH ADJACENT WALL COLOR.
<br />• FIRE EXTINGUISHER & FIRE HOSE CABINETS SHALL BE PAINTED TO MATCH ADJACENT
<br />WALL COLOR.
<br />• INTERIOR WINDOW AND VIEW WINDOW FRAMES TO BE PAINTED TO MATCH ADJACENT WALL
<br />COLOR.
<br />• WHERE DOOR FRAMES ARE NOTED OR SCHEDULED TO RECEIVE DIFFERENT PAINT
<br />COLORS ON EACH SIDE OF PARTITION - COLOR CHANGE SHALL OCCUR AT INSIDE
<br />CORNER OF DOOR JAMB STOP.
<br />• EXISTING WALL COVERING AND WALL COVERING BORDERS TO BE REMOVED, WITH WALL
<br />SURFACES PATCHED AND PREPARED TO RECEIVE NEW PAINT FINISH.
<br />• ADDITIONAL WALL PREP MAY BE REQUIRED WHERE NEW WALL BASE IS ONLY 4" HIGH IN
<br />LIEU OF EXISTING 6" HIGH WALL BASE.
<br />• PROVIDE BENJAMIN MOORE PAINT (IF REQUIRED BY COLOR SCHEDULE BELOW - MIX
<br />BENJAMIN MOORE TO MATCH OTHER MANUFACTURER'S COLORS LISTED)
<br />PLASTIC LAMINATE:
<br />• IN VERTICAL APPLICATIONS, ALL GRAIN TO RUN VERTICALLY, TYPICAL.
<br />SCOPE OF WORK APPLICATION NOTES
<br />A. CONTRACTOR SHALL REMOVE ALL WALLPAPER IN PREPARATION TO RECEIVE NEW FINISH. CONTRACTOR SHALL
<br />MAKE ALL NECESSARY REPAIRS TO WALLS.
<br />B. CONTRACTOR SHALL REMOVE ALL FLOORING AND WALL BASE IN ALL ROOMS IN PREPARATION TO RECEIVE NEW
<br />FINISH. CONTRACTOR SHALL MAKE ALL NECESSARY REPAIRS TO FLOORS.
<br />C. CONTRACTOR SHALL PROTECT ALL EXISTING CEILING ASSEMBLY IN ROOMS, UNLESS NOTED OTHERWISE.
<br />PATCH/REPAIR/PAINT ANY CEILING GRID THAT IS SCRATCHED OR CHIPPED WITH PAINT 'PT3'. CONTRACTOR
<br />SHALL REPLACE ANY DEFECTIVE CEILING TILE WITH 'LIKE' TILE TO EXISTING - CONSULT WITH OWNER.
<br />INTERIOR FINISH MATERIAL SPECIFICATIONS
<br />PLASTIC LAMINATE [CASEWORK]
<br />PLM-1 /ALL CASEWORK U.N.O - MATCH BLDG. CASEWORK STANDARD (TO BE SELECTED BY OWNER)
<br />PLM-2 /ALL COUNTERTOPS U.N.O - MATCH BLDG. CASEWORK STANDARD (TO BE SELECTED BY OWNER)
<br />(NOTE: All adjacent backsplash and sidesplash to match countertop laminate, unless noted otherwise)
<br />SHEET FLOOR
<br />FL1 = WOOD GRAIN SHEET VINYL FLOORING TO MATCH BLDG. STANDARD (TO BE SELECTED BY OWNER),
<br />• WITH MATCHING WELD ROD
<br />WALL BASE
<br />BSE-1 INTEGRAL - SEE 'FL1' ABOVE
<br />PAINT
<br />CEILING / SOFFIT PAINT
<br />PT-3 /ALL - UNDERSIDE OF SOFFITS AND CLG. GRID - "Super White" (in semi -gloss finish)
<br />(MFR. TO BE SELECTED BY OWNER)
<br />WALL PAINT
<br />PT-1 / GENERAL WALLS - TO BE SELECTED BY OWNER
<br />PT-2 / ACCENT WALLS - TO BE SELECTED BY OWNER
<br />ACOUSTICAL CEILING
<br />ACT1 / MATCH EXISTING BLDG. TILE AND GRID STANDARD
<br />r\i\L-r1 U1 vvvi\r\
<br />WORK LOCATION PLAN
<br />SCALE: 3/32" = 1'-0"
<br />NORTH
<br />C)
<br />SaltCo, LLC
<br />AA 26001479
<br />General Notes:
<br />A. DO NOT SCALE DRAWINGS.
<br />B. VENDOR PROVIDED EQUIPMENT SHOWN FOR REFERENCE ONLY -
<br />REFER TO OWNER PROVIDED VENDOR DOCUMENTS FOR
<br />ADDITIONAL INFORMATION. CONTACT EQUIPMENT MANUFACTURER
<br />FOR EQUIPMENT RELATED QUESTIONS OR CONCERNS.
<br />C. CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE
<br />DRAWINGS AND SPECIFICATIONS AND NOTIFY THE ARCHITECT OF ANY
<br />ERRORS OR INCONSISTENCIES PRIOR TO BEGINNING WORK.
<br />D. CONTRACTOR SHALL VERIFY AND COORDINATE CLEAR DIMENSIONS
<br />REQUIRED FOR OWNER/VENDOR FURNISHED EQUIPMENT AND
<br />NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS AND
<br />PROCEED ONLY UPON RESOLUTION.
<br />E. COLOR, STYLE, PATTERN AND MANUFACTURER OF INTERIOR
<br />FINISHES MAY VARY. SELECTIONS BY OWNER. VERIFY PRIOR TO
<br />INSTALLATION.
<br />F. MAINTAIN COMPLIANCE WITH OWNER -FURNISHED RADIATION SHIELDING
<br />REQUIREMENTS - IN ANY RENOVATED, AND NEW CONSTRUCTION.
<br />G. EXISTING EQUIPMENT REFERENCED AND/OR NOT SHOWN, IS REMOVED
<br />BY OTHERS - UNDER SEPARATE AGREEMENT WITH OWNER.
<br />H. REPAIR ANY PENETRATIONS/HOLES ON EXISTING FIRE OR SMOKE RATED,
<br />AND LEAD -LINED WALLS WITHIN THE SCOPE OF THE WORK, IN ORDER
<br />TO MAINTAIN THE INTEGRITY OF ALL REQUIRED FIRE / SMOKE RATINGS
<br />- INSTALL FIRESAFING AS REQUIRED FOR COMPLIANCE (SEE SHEET
<br />A600 FOR FURTHER CLARIFICATION), AND LEAD LINING
<br />REQUIREMENTS.
<br />I. MAKE NECESSARY ADJUSTMENTS TO GWB PARTITIONS, IN ORDER TO
<br />ACCOMMODATE NEW RECESSED CABLE DUCTS/CONDUITS. PATCH AND
<br />MATCH REMAINING ADJACENT SURFACES - RADIATION SHIELDING SHALL
<br />COMPLY WITH SHIELDING PLAN. SEE DETAIL C2/A201 E FOR FURTHER
<br />INFORMATION.
<br />J. WALLS SHOWN IN ALIGNMENT ARE TO ALIGN WITH FINISHED SURFACE.
<br />K. PROVIDE AND INSTALL FLORIDA BUILDING CODE APPROVED
<br />SUBTERRAINIAN TERMITICIDE AT ALL COMPACTED SOIL TO BE COVERED
<br />WITH CONCRETE FLOOR SLAB. RETREAT ALL AREAS DISTURBED BY PIPE
<br />AND CONDUIT INSTALLATION, OR OTHER CONSTRUCTION WORK, PRIOR TO
<br />NEW SLAB INSTALLATION. CONTRACTOR TO VERIFY TERMITICIDE
<br />INSTALLATION IS IN COMPLIANCE WITH FLORIDA BUILDING CODE SECTION
<br />1816, AND THAT WORK IS PERFORMED BY CERTIFIED PERSONNEL ONLY.
<br />?0
<br />)(FIA0.) A IN (C"'ER
<br />SPEC 1 A L I T.
<br />Research InsUtute
<br />Key Plan
<br />MARK ISSUE DATE DESCRIPTION
<br />Issue Log
<br />JOHN P. SAL`f - AR 92309
<br />FLORIDA CANCER SPECIALISTS
<br />EQUIPMENT REPLACEMENT
<br />38010 MEDICAL CENTER AVE.
<br />ZEPHYRHILLS, FL 33540
<br />Drawing Title
<br />GENERAL DEMOLITION NOTES,
<br />PARTITION TYPES, DETAILS,
<br />AND FINISH SCHEDULE
<br />Commission No.
<br />71604
<br />Date Issued 07/01/16
<br />Scale
<br />AS NOTED
<br />Sheet Number
<br />A001
<br />Drawn By C2
<br />Approved By J�
<br />Filename 71604 - A001
<br />SolWo, LLC 2007
<br />
|