I IF!lll' !'i
<br />- '19FI
<br />SPLIT
<br />SYSTEM
<br />A/C UNIT SCHEDULE
<br />OCOOLING CAPACITY BASED ON 95° O.A.T. & 80°/67° INDOOR O
<br />TEMP.
<br />HEAT PUMP CAPACITY @ 47° O.A.T.
<br />AO WALL MOUNTED T'STAT W/SUBBASE O SINGLE POINT POWER
<br />O CONNECTION
<br />g OPERATION TO 0° F
<br />(DENT.
<br />MANUFACTURER
<br />MODEL NO.
<br />INDOOR UNIT
<br />INDOOR UNIT ELECT
<br />COND. UNIT ELECT
<br />ACCESSORIES
<br />REMARKS
<br />AHU
<br />COND. UNIT
<br />CFM
<br />MIN.
<br />O.A.
<br />COOLING
<br />O CAPACITY
<br />HEATING
<br />CAPACITY CAPACITY
<br />ELEC COIL
<br />CAPACITY
<br />VOLTAGE
<br />MCA/MOP
<br />VOLT
<br />MCA/MOP
<br />AHU-1, CU-1
<br />TRANE
<br />TWE090
<br />TWA073
<br />2400
<br />75
<br />78,000
<br />66,000
<br />7.5KW
<br />208/60/3
<br />32.5/40
<br />208/60/3
<br />31/40
<br />OA OB CO
<br />AIR MOVING EQUIPMENT OPERATION
<br />DURING CONSTRUCTION
<br />THE USE OF NEW OR EXISTING AIR HANDLING UNITS, FANS, OR OTHER PERMANENT AIR MOVING EQUIPMENT DURING
<br />CONSTRUCTION IS PROHIBITED UNLESS APPROVED BY THE OWNER. IF APPROVED FOR USE DURING CONSTRUCTION,
<br />THE FOLLOWING PROCEDURES SHALL BE FOLLOWED:
<br />1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK, AIR HANDLING UNITS, AND OTHER EQUIPMENT
<br />FROM THE ACCUMULATION OF DIRT AND DUST AND OTHER CONTAMINANTS. IF THE PERMANENT EQUIPMENT CANNOT
<br />BE ADEQUATELY PROTECTED, TEMPORARY AIR MOVING/ CONDITIONING EQUIPMENT AND DISTRIBUTION SYSTEMS
<br />SHALL BE UTILIZED AS REQUIRED FOR FINISHING TRADES.
<br />2. PROVIDE TEMPORARY FILTERS ON ALL RETURN AND EXHAUST AIR GRILLES, OPEN DUCTWORK, AND TRANSFER
<br />OPENINGS IN THE WORK AREA.
<br />3. THE CONTRACTOR SHALL REMOVE ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW
<br />FILTERS PRIOR TO TEST AND BALANCE WORK AND PRIOR TO SUBSTANTIAL COMPLETION.
<br />4. IF THE DUCTWORK AND/OR EQUIPMENT IS FOUND TO BE CONTAMINATED AT ANY POINT DURING CONSTRUCTION, AN
<br />INDEPENDENT NADCA CERTIFIED CONTRACTOR SHALL BE RETAINED TO CLEAN THE DUCTWORK AND/OR
<br />EQUIPMENT AT THE CONTRACTORS EXPENSE.
<br />5. SYSTEM OPERATING TEMPERATURES SHALL BE MAINTAINED TO AVOID CONDENSATION ON DUCTWORK AND
<br />EQUIPMENT SURFACES. NEW OR EXISTING INSULATION FOUND DAMAGED SHALL BE REPLACED.
<br />6. COORDINATE USE OF AIR HANDLING EQUIPMENT TO MAINTAIN THE REQUIRED PRESSURE RELATIONSHIPS IN
<br />CONSTRUCTION AREAS ADJACENT TO OCCUPIED AREAS.
<br />APPLICABLE CODES
<br />2014 FLORIDA BUILDING CODE
<br />2014 FLORIDA EXISTING BUILDING CODE
<br />2014 FLORIDA PLUMBING CODE
<br />2014 FLORIDA FUEL GAS CODE
<br />2014 FLORIDA MECHANICAL CODE
<br />FLORIDA FIRE PREVENTION CODE, 5TH EDITION (2014)
<br />NFPA 10-2010, STANDARD FOR PORTABLE FIRE EXTINGUISHERS
<br />NFPA 13-2010, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
<br />NFPA 70-2011, NATIONAL ELECTRICAL CODE
<br />NFPA 72-2010, NATIONAL FIRE ALARM CODE
<br />NFPA 75-2009, STANDARD FOR THE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT
<br />NFPA 99-2012, STANDARD FOR HEALTH CARE FACILITIES
<br />NFPA 101-2012, LIFE SAFETY CODE, EXCEPT AS MODIFIED BY FLORIDA STATE STATUTE
<br />NFPA 110-2010 EDITION, STANDARD FOR EMERGENCY & STANDBY POWER SYSTEMS
<br />NFPA 241-2009, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION & DEMOLITION OPERATIONS
<br />LOCAL CODES AND ORDINANCES WHERE APPLICABLE AND FLOOD DAMAGE PREVENTION ORDINANCES
<br />GUIDELINES FOR DESIGN & CONSTRUCTION OF HOSPITAL AND HEALTHCARE FACILITIES, 2010 EDITION
<br />MECHANICAL DEMOLITION NOTES
<br />1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF ALL EXISTING EQUIPMENT, EXACT
<br />SIZES OF EXISTING DUCT AND PIPING, ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES
<br />BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO ARCHITECT AND ENGINEER PRIOR TO THE COMMENCEMENT OF
<br />DEMOLITION WORK.
<br />2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS. THIS INCLUDES ALL HANGERS, STRAPS AND
<br />RELATED MATERIAL. IF THE OWNER WISHES TO UTILIZE THE EXISTING EQUIPMENT, CONTRACTOR SHALL MOVE
<br />THE EQUIPMENT TO AN ON -SITE LOCATION DESIGNATED BY THE OWNER. ALL EQUIPMENT REFUSED BY OWNER
<br />SHALL BE DISPOSED OF IN A MANNER ACCEPTABLE BY LOCAL JURISDICTION. ITEMS SHOWN TO BE REMOVED
<br />SHALL NOT BE ABANDONED IN PLACE.
<br />3. PATCH OPENINGS IN WALLS WITH LIKE MATERIALS TO MAINTAIN THE INTEGRITY OF THE WALL WHERE AIR DEVICES,
<br />DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
<br />4. GENERAL CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL AND ELECTRICAL CONTRACTOR ALL CEILING
<br />REMOVAL WHICH IS REQUIRED TO ACCESS THEIR WORK AND IS NOT DESIGNATED FOR REMOVAL. NOTIFY ARCHITECT
<br />AND OWNER PRIOR TO COMMENCING REMOVAL. IF EXISTING CEILING IS DETERMINED TO REQUIRE REMOVAL,
<br />REMOVE ONLY THAT PORTION NECESSARY TO ACCESS AND COMPLETE DEMOLITION AND NEW WORK. UPON
<br />COMPLETION OF THE ABOVE CEILING WORK, CEILING IS TO BE REPLACED TO MATCH EXISTING CEILING.
<br />MECHANICAL GENERAL NOTES
<br />1. CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE PROJECT SCOPE, UTILITY CONNECTIONS,
<br />AND ALL BUILDING SERVICES.
<br />2• MAINTAIN ACCESSIBILITY OF ALL EQUIPMENT, DAMPERS, CONTROL PANELS, VALVES, AND OTHER DEVICES. PROVIDE
<br />ACCESS PANELS AS REQUIRED. COORDINATE PLACEMENT WITH THE ARCHITECT PRIOR TO INSTALLATION.
<br />3. STANDARD DETAILS ILLUSTRATED ON THE DRAWINGS SHALL BE APPLIED IN ALL CASES WHERE THE FEATURE
<br />OCCURS IN THE SYSTEM DESIGN.
<br />4• DRAWINGS ARE SCHEMATIC IN NATURE AND SHALL NOT BE SCALED. THE CONTRACTOR IS RESPONSIBLE FOR
<br />COORDINATING EXACT ROUTING OF ALL SERVICES WITH EXISTING CONDITIONS AND WITH ALL OTHER TRADES.
<br />5. MAJOR EQUIPMENT SHOWN ON THE PLANS AND ELEVATIONS ILLUSTRATE THE GENERAL ARRANGEMENT AND SPACE
<br />ALLOCATIONS. THE CONTRACTOR SHALL VERIFY THE SPACE REQUIREMENTS FOR EACH SYSTEM COMPONENT USING
<br />MANUFACTURER CERTIFIED SHOP DRAWINGS AND MAKE THE NECESSARY ADJUSTMENTS IN EQUIPMENT PLACEMENT
<br />AND CONNECTION IN ORDER TO ACCOMMODATE THE EXACT EQUIPMENT TO BE INSTALLED.
<br />6• PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SLEEVED, SEALED AND FIRESAFED TO MAINTAIN
<br />THE INTEGRITY OF THE WALL AND FLOOR UL FIRE RESISTANCE RATING.
<br />7. CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT PRIOR TO CUTTING ANY OPENING IN THE STRUCTURE.
<br />8. PROVIDE EXPANSION JOINT AT EACH PIPE AND DUCT CROSSING AN INTERIOR BUILDING EXPANSION JOINT.
<br />9. WHERE WORK IN RENOVATED AREAS AFFECTS SYSTEMS IN OTHER AREAS OF THE BUILDING, THE CONTRACTOR
<br />SHALL COORDINATE THIS WORK WITH THE OWNER. THIS WORK SHALL BE DONE TO FIT THE BUILDING OPERATIONAL
<br />SCHEDULE AND MINIMIZE DISRUPTION/ DISCOMFORT TO OCCUPIED AREAS. PROVIDE MINIMUM 48 HOURS WRITTEN
<br />NOTICE WITH ANTICIPATED DURATION OF OUTAGE.
<br />10. COORDINATE WITH ALL TRADES FOR REQUIRED CEILING REMOVAL IN EXISTING BUILDING. NOTIFY THE ARCHITECT
<br />AND OWNER PRIOR TO COMMENCING REMOVAL. REMOVE ONLY THAT PORTION OF CEILING NECESSARY TO ACCESS
<br />AND COMPLETE THE NEW WORK. UPON COMPLETION OF THE ABOVE CEILING WORK, CEILING IS TO BE REINSTALLED.
<br />REPLACE ANY DAMAGED CEILING TILES WITH NEW TILES TO MATCH EXISTING.
<br />11. FABRICATE DUCTWORK FROM GALVANIZED SHEET METAL MEETING SMACNA STANDARDS. SEAL DUCT ACCORDING
<br />TO SMACNA SEAL CLASS A FOR ALL SUPPLY, RETURN AND EXHAUST DUCTS.
<br />MECHANICAL SHEET INDEX
<br />SHEET
<br />NUMBER
<br />DESCRIPTION
<br />M001
<br />MECHANICAL NOTES, SCHEDULES AND SHEET INDEX
<br />M002
<br />MECHANICAL SPECIFICATIONS
<br />M003
<br />MECHANICAL SPECIFICATIONS
<br />M300
<br />MECHANICAL PARTIAL FLOOR PLAN - DEMOLITION & NEW CONSTRUCTION
<br />M501
<br />MECHANICAL DETAILS
<br />AA 26001479
<br />Sheet Notes:
<br />Smith
<br />Seckman
<br />SRReid, Inc.
<br />301 North Cattlemen Road, Suite 300
<br />Sarasota, FL 34232
<br />(941) 907-7750
<br />FAX: (941) 907-7751
<br />www.ssr-inc.com
<br />Firm Certification - CA-0000857
<br />SSR# 1636044.0
<br />Erick Phelps - PE #64598
<br />Christopher E. Durham - PE 976655
<br />qyGK PH, <z
<br />i
<br />No. 64598
<br />FF
<br />STATE OF •• �(/�`
<br />�T�•• :cLORIOP.•••G���
<br />,Il�NA �0\\�
<br />ERICK PHELPS
<br />PE - 64598
<br />FI f -A [7)
<br />Lk_j ixi DA CA N C' E R
<br />& Research Institute
<br />Key Plan
<br />MARK ISSUE DATE DESCRIPTION
<br />Issue Log
<br />CONSTRUCTION
<br />DOCUMENTS
<br />FLORIDA CANCER SPECIALISTS
<br />EQUIPMENT REPLACEMENT
<br />38010 MEDICAL CENTER AVE.
<br />ZEPHYRHILLS, FL 33540
<br />Drawing Title
<br />MECHANICAL NOTES,
<br />SCHEDULES, AND SHEET
<br />INDEX
<br />71604
<br />07/15/2016
<br />Scale NTS
<br />Sheet Number
<br />M001
<br />Drawn By DAO
<br />Approved By EAP
<br />Filename
<br />SaLtCo, LLC 2007