Laserfiche WebLink
N <br />U <br />'t- <br />N <br />Ir <br />N <br />m M <br />-zjIt:l <br />V) 1 V> <br />:�j , w <br />Z Z <br />J I � <br />HVAC PLAN - NEW CONSTRUCTION <br />SCALE: 1/41s=11-0" <br />MECHANICAL NOTES <br />O PROVIDE OUTSIDE AIR INTAKE WITH VOLUME DAMPER FROM ERV UP TO PITCHED ROOF <br />CAP INTAKE. <br />PROVIDE ENERGY RECOVERY VENTILATOR (ERV) AS SCHEDULED. SET VOLUME DAMPERS TO <br />POSITIONS TO BALANCE AIR FLOW PER SCHEDULE. SEE CONTROL DIAGRAMS FOR ERV <br />OPERATION. <br />O3 PROVIDE EXHAUST AIR DISCHARGE DUCTING WITH VOLUME DAMPER FROM ERV TO PITCHED <br />ROOF CAP. ROUTE DUCTING SO THAT EXHAUST IS AT LEAST 10 FEET AWAY FROM ANY <br />OUTDOOR AIR INTAKE VENTS. <br />® PROVIDE AIR HANDLER AS PER MECHANICAL SCHEDULE. PROVIDE SUPPLY DUCT FROM <br />ENERGY RECOVERY VENTILATOR (ERV) TO AIR HANDLER RETURN DUCT AND RETURN <br />DUCTING FROM GRILLE TO ERV. <br />O PROVIDE NEW CONDENSER UNIT AS PER MECHANICAL SCHEDULE. SECURE TO EXISTING <br />CONCRETE APRON. EXTEND APRON AS NECESSARY TO ENSURE 24" OF CLEARANCE <br />BETWEEN CONDENSER AND BUILDING. <br />Project No. 151010 <br />NOT FOR CONSTRUCTION <br />M3,1 <br />02015 BH/PK Architects, Inc. I <br />Z:\BH-PK Architects\151010 - FH (Zephyrhills) - Wellness Center\Design\151010_M3.0-M3.2.dwg Monday, February 14, 2011 3:34:45 PM Shawn Jeffrey <br />