PLUMBING SPECIFICATIONS
<br />PLUMBING DEMOLITION NOTES
<br />PLUMBING NEW CONSTRUCTION NOTES
<br />C
<br />0
<br />a-
<br />E
<br />D
<br />a
<br />0
<br />0
<br />0
<br />r`
<br />M
<br />i
<br />0
<br />N
<br />r`
<br />rn
<br />E
<br />0
<br />a)
<br />Li
<br />J
<br />LL
<br />z
<br />L
<br />U
<br />LI
<br />C
<br />Q
<br />v
<br />Ln
<br />0
<br />;J
<br />REGULATORY REQUIREMENTS
<br />A. NFPA 101: Life Safety Code (2006).
<br />B. ANSI Handicapped Code-A117.1.
<br />C. Florida Fire Marshall's Rules 69A-3.012 F.A.C. - (2007).
<br />D. Florida Building Code - 2007 with 2009 ammendments.
<br />PLUMBING MATERIALS
<br />PLUMBING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH FLORIDA
<br />BUILDING CODE - PLUMBING 2007 AND ADA REQUIREMENTS.
<br />WASTE AND VENT: NO HUB SERVICE WEIGHT CAST IRON, BY CHARLOTTE, AB&I OR TYLER,
<br />CISPI STANDARD 301, ASTM A888. NSF ABOVE FLOOR WITH 'HUSKY' HEAVY DUTY *SD4000
<br />COUPLINGS ASTM C1540 AND BELL AND SPIGOT WITH NEOPRENE GASKETS ASTM STANDARD
<br />C564 BELOW SLAB FOR PIPING 2' AND LARGER AND COPPER TYPE 'M' HARD DRAWN COPPER
<br />WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDER FOR PIPING UP TO 1-1/2'.
<br />CONDENSATE PIPING: COPPER TYPE 'M' WITH FOUGHT COPPER FITTINGS LEAD FREE
<br />SOLDERED JOINTS. CONDENSATE INSULATION:ARMAFLEX OR THERMACE�LL, 25/50 FIRE/
<br />SMOKE RATING SEAL JOINTS WITH INSULATIOMFGR. ADHESIVE. LABEL PIPING AS INDICATED
<br />ABOVE.
<br />WATER: DOMESTIC COLD & HOT WATER PIPING SHALL BE TYPE 'L' HARD
<br />DRAWN COPPER WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDERED
<br />JOINTS PER FBC 2007. NSF-61. INSULATE HOT WATER PIPING USING 1' THICK FIBERGLASS
<br />INSULATION HAVING A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE
<br />DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E-84,NPFA 225 AND UL 723.
<br />ACCEPTABLE INSULATION MFGR'S: KNAUF, JOHNS-MANVILLE AND CERTAINTEED.
<br />FOAMGLASS INSULATION SHALL BE USED WHERE PIPING
<br />PENETRATES RATED WALLS. LABEL PIPING BY ADHESIVE LABELS (TO DENOTE
<br />CONTENTS AND DIRECTION OF FLOW) ON PIPING AT NO MORE THAN 25 FOOT INTERVALS,
<br />AT EACH VALVE, AND AT EACH CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH
<br />LOCATION WHERE LABELED INDICATING DIRECTION OF FLOW. LABELING TO BE MINIMUM OF
<br />2' HIGH LETTERS.
<br />LABEL PIPING BY ADHESIVE LABELS (TO DENOTE CONTENTS AND DIRECTION OF FLOW)
<br />ON PIPING AT NO MORE THAN 25 FOOT INTERVALS, AT EACH VALVE, AND AT EACH
<br />CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH LOCATION WHERE LABELED INDICATING
<br />DIRECTION OF FLOW. LABELING TO BE MINIMUM OF 2' HIGH LETTERS.
<br />TEST WATER AND WASTE PIPING AS PER LOCAL CODES.
<br />WATER HEATER: LOCHINVAR, A.O.SMITH
<br />PLUMBING FIXTURES: KOHLER, AMERICAN STANDARD. ZURN.
<br />PLUMBING TRIM: CHICAGO FAUCET, ZURN
<br />STAINLESS STEEL SINK: ELKAY OR JUST
<br />SHOCK ARRESTORS: SIOUX CHIEF OR PRECISION PLUMBING PRODUCTS.
<br />FIXTURE CARRIER: ZURN, WADE, J.R. SMITH
<br />THERMOSTATIC MIXING VALVES: SYMMONS, POWERS.
<br />SUPPLY STOPS: McGUIRE OR ZURN HEAVY DUTY
<br />CONTRACTOR SHALL PROVIDE PLUMBING FIXTURE AND MATERIAL
<br />SUBMITTALS TO THE ENGINEER FOR APPROVAL PRIOR
<br />TO INSTALLATION AND PURCHASING.
<br />PLUMBING FIXTURES
<br />PROVIDE PLUMBING FIXTURES, TRIM AND RELATED ITEMS SUCH AS
<br />HEAVY DUTY SUPPLIES, TRAPS, DRAINS, CLEANOUTS AND
<br />FIXTURE SUPPORTS AND OTHER ACCESSORY ITEMS. COORDINATE
<br />FIXTURE REQUIREMENTS BY REVIEWING ARCHITECTURAL AND EQUIPMENT
<br />DRAWINGS. INSTALL FIXTURES IN ACCORDANCE WITH CONTRACT DRAWINGS
<br />AND MANUFACTURER'S ROUGH -IN DRAWINGS. WALL HUNG LAVATORIES SHALL
<br />BE PROVIDED WITH FLOOR MOUNTED CARRIERS.
<br />MATERIALS
<br />HANGERS - GRINNELL BY ANVIL, B-LINE, FEE AND MASON, PHD, VIKING AND RELIABLE.
<br />1. GRINNELL FIGURE *CT-69, MSS TYPE 10 WITH ADJUSTABLE WROUGHT TUBING RING
<br />HANGER, COPPER PLATED FOR: NON -INSULATED COPPER TUBING WITH NO LONGITUDINAL
<br />MOVEMENT; NON -INSULATED CAST IRON PIPING 2' AND LESS.
<br />EXPANSION ANCHORS: HILTI KWIK-BOLT, ZINC PLATED, METAL EXPANSION ANCHOR TO BE
<br />USED ON EXISTING CONSTRUCTION. ANCHOR TO MEET U.L.. ICBO-4627 AND FM LISTINGS.
<br />VALVES - NIBCO, WATTS, KITZ OR MILWAUKEE
<br />1. BALL VALVES (DOMESTIC WATER):
<br />A. 2' AND LESS: NIBCO FIGURE T-685-80-LF OR S-685-80-LF, 2-PIECE, FULL PORT,
<br />600 PSI, WOG, TFE SEATS. NSF 61, LEAD FREE.
<br />B. PROVIDE EXTENDED LEVER FOR INSULATED SERVICE.
<br />2. CHECK VALVES (DOMESTIC WATER):
<br />A. 2' AND LESS: NIBCO FIGURE T-433 OR S-433, THREADED OR SOLDERED,
<br />CLASS 150, NSF-61, LEAD FREE.
<br />3. LOCATE VALVES SO AS TO BE ACCESSIBLE BY MAINTENANCE PERSONNEL.
<br />ALL MATERIAL SHALL BE DOMESTIC AND SHALL BE MANUFACTURED WITHIN THE UNITED
<br />STATES OF AMERICA.
<br />CLOSEOUT
<br />CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS IN AUTOCAD FORMAT AT COMPLETION
<br />OF PROJECT.
<br />1. EXISTING SERVICES INDICATED ON THESE DRAWINGS
<br />WERE DERIVED FROM EXISTING DRAWINGS AND
<br />LIMITED FIELD OBSERVATIONS. THESE DRAWINGS
<br />MAY NOT BE ALL INCLUSIVE OF SERVICES THAT
<br />EXIST IN THE PROJECT AREA. CONTRACTOR SHALL
<br />VERIFY SERVICES, LOCATION, TYPE, AND SIZE
<br />PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS
<br />IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL
<br />BE REPORTED TO THE ARCHITECT FOR COORDINATION
<br />PRIOR TO CONSTRUCTION.
<br />2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO
<br />REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED
<br />TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY
<br />BE DAMAGED DURING CONSTRUCTION.
<br />3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS
<br />(UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS.
<br />4. ALL PENETRATIONS OR OPENINGS FROM REMOVED
<br />PIPES THROUGH EXISTING BUILDING
<br />WALLS AND FLOORS SHALL BE SLEEVED AND/OR
<br />PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL
<br />DRAWINGS FOR FINAL FINISHES.
<br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
<br />TO EXISTING PIPING , FIXTURES OR EQUIPMENT
<br />DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
<br />WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE
<br />OWNER.
<br />6• CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN
<br />USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION
<br />OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL
<br />COORDINATE WITH AUTHORIZED MAINTENANCE PERSONNEL BEFORE
<br />MAKING THE NECESSARY INTERRUPTION.
<br />7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN
<br />EXISTING WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT
<br />CEILING ABOVE AND CEILING BELOW TO NEW STACK OR RISER LOCATION
<br />COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS.
<br />8. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING TO BE
<br />REMOVED DOES NOT AFFECT OTHER AREA'S OF THE BUILDING THAT
<br />ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF
<br />DISCREPANCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE
<br />ENGINEER.
<br />9' CONTRACTOR SHALL REMOVE EXISTING PLUMBING FIXTURES AND EQUIPMENT
<br />TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED.
<br />CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS,
<br />WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AL ACTIVE PLUMBING
<br />SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW CHASE AREAS OR
<br />NEW WALLS AS REQUIRED.
<br />10. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING
<br />FIXTURES AND/OR EQUIPMENT THAT ARE TO BE REMOVED
<br />TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE
<br />LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE
<br />TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED
<br />FROM THE SITE AND LEGALLY DISPOSED.
<br />PLUMBING ABBREVIATIONS
<br />C.W
<br />COLD WATER
<br />PRY.
<br />PRESSURE REDUCING VALVE
<br />H.W.
<br />HOT WATER
<br />R.P.U.
<br />REDUCED PRESSURE BACKFLOW PREVENTER
<br />H.WR
<br />HOT WATER RECRC
<br />A.F.F.
<br />ABOVE FNSHED FLOOR
<br />V.TR
<br />VENT THRU ROOF
<br />AF.G.
<br />ABOVE FNIM GRADE
<br />W.
<br />WASTE (INTERIOR)
<br />A.P.
<br />ACCESS PANEL
<br />R.WL
<br />RAN WATER LEADER
<br />W.C.O.
<br />WALL CLEANOUT
<br />S.N.
<br />STORM WATER
<br />S.S.
<br />SANITARY SEWER
<br />LE.
<br />INVERT ELEVATION
<br />V.LV.
<br />VALVE N VERTICAL
<br />CA.
<br />CLEANOUT
<br />CA.
<br />COiOESATE
<br />OFCI
<br />OWNER R RIEM CONTRACTOR INSTALLED
<br />LE
<br />INVERT ELEVATION
<br />U.
<br />ROOF DRAM
<br />F.C.II.
<br />FAN COIL UNIT
<br />F.D.
<br />FLOOR DRAIN
<br />Nix.
<br />NOT N CONTRACT
<br />RREL
<br />FINISHED FLOOR ELEVATION
<br />E.W.C.
<br />ELECTRIC WATER COOLER
<br />PLUMBING LEGEND
<br />SnM OES"To
<br />SwIl 10"To
<br />---
<br />COLD WATER
<br />BALL VALVE
<br />--
<br />HOT WATER GIO'F)
<br />1.
<br />CHECK VALVE
<br />-----
<br />HOT WATER RECIRCL LATKIN
<br />P-1,ETC
<br />FO(TLRE NOENTIFICATKM
<br />_SSA
<br />SANITARY SEWER UWMM)
<br />CONNECTION TO COSTING
<br />-W-
<br />WASTE LINE
<br />-a
<br />CAP ON LINE
<br />--V--
<br />VENT PIPE (ABOVE OR BELOW RKM)
<br />PPE TURNED UP
<br />--RWLP--
<br />RAN WATER LEADER
<br />PPE TLFM DOWN
<br />STORM WATER OROERGROIIIO)
<br />SGPM
<br />.5GPM
<br />BALANCING VALCRCUIT SETTER W/OECK
<br />VALVE SET AT
<br />--SW-
<br />CLEANOUT (ABOVE CEI NW
<br />-D-
<br />DRIP TRMN ORAN LIE
<br />BCD--
<br />CONDENSATE DRAW LINE
<br />PRESS IRE REDUCING VALVE
<br />LIOERGROW COLD WATER
<br />-PCD-
<br />PUMPED CONDENSATE
<br />1. PLUMBING INSTALLATION OF ALL FIXTURES. EQUIPMENT, AND PIPING
<br />SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE
<br />WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES
<br />REQUIREMENTS.
<br />2. CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATIONS, SIZES AND
<br />LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE
<br />FOUND, THEY ARE TO NOTIFY ENGINEER.
<br />3. ALL PLUMBING
<br />MB NG FIX20UORE S TO COMPLY WITH TABLE 604.3 OF THE FLORIDA
<br />BUIL4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING
<br />HEIGHTS WITH KITCHEN EQUIPMENT EQUIPMENT AND ARCHITECTURAL DRAWING
<br />AND SUPPLIER. INSTALL EOUIPMEW AND MAKE FINAL
<br />A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER
<br />TO DETERMINE ALL REQUIRED CONNECTIONS.
<br />5. PROVIDE 121XI2' ACCESS PANELS FOR ALL VALVES LOCATED
<br />ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN
<br />REACH OF ACCESS DOOR.
<br />6. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS
<br />FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION.
<br />INCLUDING TAILPIECES, TRAPS, LINE STRAINERS. STOP VALVES, GAUGES.
<br />VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS,
<br />GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES
<br />FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED
<br />PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS.
<br />7. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED
<br />ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE
<br />IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES.
<br />IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR
<br />ANY OTHER REASON. HE SHALL COMPENSATE THE ENGINEER AT A RATE OF
<br />DPE x 2.T5 TO REVISE THE PLUMBING DRAWINGS. RISER DIAGRAMS AND FOR
<br />THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING
<br />JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME
<br />REQUIRED AND SCHEDULE FOR PERFORMING WORK.
<br />8, EXISTING UTILITIES, WHICH ARE NOT SHOWN. THAT ARE DISCOVERED
<br />DURING DEMOLITION SHALL BE BROUGHT TO THE ATTENTION OF THE
<br />OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO-
<br />ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND/OR REROUTE
<br />THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
<br />9. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT
<br />CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS.
<br />10. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE
<br />WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP
<br />SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND
<br />SPECIFICATIONS.
<br />11. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON FLUSH
<br />VALVE FIXTURES AND ALL LINES SERVING QUICK CLOSING VALVES AND AS
<br />INDICATED ON PLUMBING PLANS AND RECOMMENDED BY THE MANUFACTURER.
<br />12. ANY WALL COVERS
<br />RV N ANYH CORRIDORBFLOORS IFEDISCREPANCIES RARE FOUND ON
<br />PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION.
<br />13• PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT. PANELS AND PHONE
<br />PANELS.
<br />14. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS
<br />AND MOUNTING HEIGHTS.
<br />15. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE
<br />CHROME PLATED.
<br />16. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS
<br />AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING
<br />DESIGN EENNGIN ERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED
<br />FOR APPROVAO.
<br />17. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING
<br />AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING
<br />WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER.
<br />18. CONTRACTOR SHALL COORDINATE WITH ALL
<br />DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE
<br />ROUTING PROBLEMS.
<br />19. PROVIDE OFFSETS AND FITTINGS AS REQUIRED.
<br />20. ALL
<br />INTAKES, SHALL BE
<br />WIINDOWS5'-0' AWAY FROM
<br />21. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, NOTIFY AND COORDINATE
<br />PENETRATIONS WITH ALL TRADES. THE ARCHITECT AND STRUCTURAL ENGINEER
<br />PRIOR TO PENETRATING ANY BEAMS.
<br />22. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK.
<br />CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW
<br />PRIOR TO INSTALLATION.
<br />23. FITTINGS WHICH WILLDIRECTION
<br />CAUSE EXCESSIVE REDUCTIONHN THE VELOCITYD OF WITH
<br />OR CREATE ANY OTHER ADVERSE EFFECT UNLESS PHYSICALLY IMPOSSIBLE
<br />GEs USE OF SANITARY TEE IN A HORIZONTAL CONNECTION. USE OF A DOUBLE
<br />PLUMBING FIXTURE SCHEDULE
<br />FIXTURE
<br />FITTING
<br />____7MANUFACTURER
<br />FLOOR MOUNTED
<br />C.W
<br />H.W.
<br />WASTE
<br />REMARKS
<br />MODEL
<br />TYPE
<br />SIZE
<br />MANUFACTURER
<br />TYPE
<br />SUPPLY
<br />TRAP
<br />FAUCET
<br />SYMBOL
<br />CARRIER
<br />P-5A
<br />KOHLER (HC)
<br />HIGHLINE
<br />K-3544
<br />FLUSH TANK
<br />FLOOR MOUNTED
<br />ELONGATED
<br />McGUIRE
<br />NA
<br />H-2165
<br />INTEGRAL
<br />NA
<br />NA
<br />I
<br />/�
<br />--
<br />4
<br />K-4670C WHITE.
<br />SEAT
<br />WATER CLOSET
<br />1.5 GALLON
<br />VITREOUS CHINA
<br />BOWL
<br />KOHLER (HC)
<br />KINGSTON
<br />WALL HUNG
<br />CONCEALED ARM
<br />5' BACKSPLASH
<br />21 X18
<br />McGUIRE
<br />155WC OFFSET
<br />H-2165
<br />*8872 11/4 P-TRAP
<br />OFFSET FOR WHEEL
<br />CHICAGO FAUCET
<br />•895-317FC
<br />ZURN
<br />I/�
<br />I/�
<br />lI/�
<br />MOUNT 34' A.F.F. TO RIM.
<br />PROVIDE TRUEBRO LAV
<br />P-13
<br />LAVATORY
<br />K-2005
<br />VITREOUS CHINA
<br />4' FAUCET CTR
<br />STRAINER
<br />CHAIR USE
<br />WRISTBLADE HANDLE
<br />Z-1231
<br />SHIELD *2018.
<br />JUST -(STAFF)
<br />*SL-ADA-
<br />SINGLE COMP.
<br />(S.S.) 18 GAUGE
<br />14' X 16' X 61/1
<br />McGUIRE
<br />#
<br />PROWRAP PW1152 WC
<br />H-2165
<br />PROWRAP #PW2150
<br />11/ P-TRAP OFFSET
<br />CHICAGO FAUCET
<br />NA
<br />1/�
<br />1/�
<br />11/1
<br />NA
<br />P-20A
<br />S.S. SINK
<br />2019-A-GR
<br />SELF -RIMMING
<br />OFFSET STRAINER
<br />FOR WHEEL CHAIR USE
<br />*786-GN2FCCP
<br />NOTE:
<br />1. INSTALLATION OF FIXTURES SHALL BE FULLY COORDINATED WITH GRAB BARS.
<br />2. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL FOR A COMPLETE INSTALLATION OF THE PLUMBING FIXTURES INCLUDING ANY
<br />GROUT AS REQUIRED AT WALL HUNG FIXTURES. COORDINATE WITH ARCHITECT FOR SPECIFIC GROUT REQUIREMENTS.
<br />3. PROVIDE SYMMONS THERMOSTATIC MIXING VALVE *5-210-CK 1/2 GPM MIN, 2 GPM MAX ON FAUCETS. SET AT 110' F. SEE DETAILS. INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS.
<br />24. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON T
<br />SCHEDULED OR SPECIFIEDr USING THE MANUFACTURERS
<br />AS CALLED FOR IN THE JPECIFICATIONS AND SCHEDULE
<br />THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS
<br />SPECIFIED ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN
<br />THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR
<br />WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST AT THE TIME OF BIDDING,
<br />SUBMIT SEPARATELY ON LETTERHEAD STATIONARY dF THE BIDDER THE
<br />EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED bR TO BE
<br />DEDUCTED FROM HIS PROPOSAL.
<br />25. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME
<br />TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES
<br />WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF
<br />SUBSTITUTE MATERIALS.
<br />26. WARRANTY/GUARANTEE
<br />A.THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY
<br />OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION
<br />FOR THE PERIOD OF ONE YEAR.
<br />B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS. APPEARING
<br />DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY
<br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE
<br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE
<br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
<br />ORIGINAL DEFECT OR REPAIR THERETO.
<br />2T.
<br />2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME
<br />CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND
<br />WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE
<br />OF THE CONTRACT.
<br />28. ALL CONDENSATE PIPING SHALL BE INSULATED
<br />THROUGHOUT ENTIRE SYSTEM.
<br />29. PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE
<br />TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES
<br />SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO
<br />OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />30. THE MAXIMUM VERTICAL DISTANCE FROM THE FIXTURE OUTLET TO THE TRAP
<br />WEIR SHALL NOT EXCEED 24-INCHES AND THE HORIZONTAL DISTANCE SHALL
<br />NOT EXCEED 30-INCHES MEASURED FROM THE CENTER LINE OF FIXTURE OUTLET
<br />TO THE CENTERLINE OF THE INLET OF THE TRAP AS PER SECTION 1002 OF THE
<br />FLORIDA PLUMBING CODE 2007.
<br />31. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES.
<br />PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF
<br />CONSTRUCTION.
<br />32. ALL FLUSH VALVES, FIXTURE STOPS, VALVES, ETC., ALL PIPING SHALL BE RIGIDLY
<br />SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS
<br />VALVE TAG ON EACH VALVE. COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM.
<br />33. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A
<br />MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING
<br />OF 50.
<br />34. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO
<br />ACTUAL CONDITION AND SPACE REQUIREMENTS.
<br />35. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS
<br />WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY
<br />OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING
<br />AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER/ENGINEER.
<br />36. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS
<br />AND TESTS.
<br />37. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE
<br />CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY
<br />DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF
<br />THE WORK.
<br />38. GENERAL NOTEi TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT
<br />EXCEED I10' F. PER FLORIDA ENERGY CODE 412.1.ABCD.2.3.2. CONTRACTOR
<br />SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL
<br />TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF 110' F
<br />SUBJECT TO REVIEW BY ENGINEER.
<br />39. CONTRACTOR SHALL PROVIDE POTABLE WATER TEST FOR DOMESTIC COLD AND
<br />HOT WATER SYSTEMS BEFORE AND AFTER MODIFICATIONS ARE COMPLETE FOR
<br />CONTAMINANTS.
<br />40. ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF-61
<br />CERTIFIED.
<br />41. CONTRACTOR SHALL SAW CUT CONCRETE FLOOR SLAB TO INSTALL NEW
<br />BELOW SLAB PIPING AND SHALL PATCH THE SLAB TO MATCH THE EXISTING
<br />CONCRETE SLAB.
<br />WATER HEATER SCHEDULE
<br />SYSTEM
<br />TYPE
<br />MANUFACTURER
<br />MODEL No.
<br />KW
<br />TOT.
<br />STORAGE
<br />FLOW
<br />ELECKW
<br />REMARKS
<br />CAPACITY
<br />RECOVERY
<br />WATER
<br />ELECTRIC
<br />LOCHINVAR
<br />LSK030KK
<br />4.5
<br />4.5
<br />30
<br />31 GPH
<br />2O8V
<br />ENERGY SAVER, GLASS LINED
<br />HEATER
<br />WHI
<br />ENERGY
<br />SHORT MODEL
<br />GALLON
<br />600 F RISE
<br />3 PH.
<br />MAGNESIUM TANK SAVER,
<br />SAVER
<br />INSTALL EQUIPMENT
<br />IN ACCORDANCE WITH
<br />MANUFACTURER'S WRITTEN
<br />INSTRUCTIONS. U.L. LISTED.
<br />PROVIDE HEATER WITH THE FOLLOWING OPTIONS:
<br />1. 3 YEAR WARRANTY
<br />2. TEMPERATURE AND PRESSURE GAUGE
<br />3. NSF CONSTRUCTION
<br />DRAWING INDEX
<br />SHEET
<br />NUMBER
<br />SHEET TITLE
<br />PO.1
<br />PLUMBING SPECS, LEGENDS, SCHEDULES, AND DRAWING INDEX
<br />P1.0
<br />UNDERGROUND PLAN - DEMOLITION - PLUMBING
<br />P1.1
<br />FIRST FLOOR PLAN - DEMOLITION - PLUMBING
<br />P2.0
<br />UNDERGROUND PLAN - NEW CONSTRUCTION - PLUMBING
<br />P2.1
<br />FIRST FLOOR PLAN - NEW CONSTRUCTION - PLUMBING
<br />P4.1
<br />PLUMBING RISER DIAGRAMS
<br />P5.1
<br />PLUMBING TYPICAL DETAILS
<br />E:1Mo
<br />6
<br />E.
<br />ftb
<br />dw
<br />TE OF : U
<br />4.
<br />�A►A1.tE����
<br />SRSmith
<br />Seckman
<br />Reid, Inc.
<br />600 West Hillsboro, Suite 300
<br />Deerfield Beach, FL 33441
<br />(954)421-1260
<br />FAX: (954) 421-1466
<br />www.ssr-inc.com
<br />Firm Certification - EB-0000867
<br />Dennis Davie PE - 58588
<br />John E. Moulder PE - 88200
<br />SSR JOB # 1137001.0
<br />-v;
<br />N
<br />k2
<br />o�
<br />�s
<br />. a A
<br />Al.
<br />2
<br />.s
<br />x
<br />a
<br />v ..
<br />y �
<br />o
<br />a
<br />U)
<br />0 N
<br />Cz
<br />0
<br />I _
<br />_0
<br />C� _O
<br />CD
<br />( --
<br />U
<br />m
<br />U
<br />a� O
<br />cl w
<br />U U
<br />Q �
<br />U) C
<br />0 G
<br />Cn
<br />EO
<br />^:3 CV
<br />Project No. 11006.00
<br />PO . 1
<br />02011 BRIPE Architects, Inc.
<br />1 ? :,• � � :: • � ifs T � . - � � t .:. ! ..'i ,'�,�$Q ��++ � �1i � t a ,. ry/ « ! 4
<br />Ell
<br />.
<br />
|