Laserfiche WebLink
PLUMBING SPECIFICATIONS <br />PLUMBING DEMOLITION NOTES <br />PLUMBING NEW CONSTRUCTION NOTES <br />C <br />0 <br />a- <br />E <br />D <br />a <br />0 <br />0 <br />0 <br />r` <br />M <br />i <br />0 <br />N <br />r` <br />rn <br />E <br />0 <br />a) <br />Li <br />J <br />LL <br />z <br />L <br />U <br />LI <br />C <br />Q <br />v <br />Ln <br />0 <br />;J <br />REGULATORY REQUIREMENTS <br />A. NFPA 101: Life Safety Code (2006). <br />B. ANSI Handicapped Code-A117.1. <br />C. Florida Fire Marshall's Rules 69A-3.012 F.A.C. - (2007). <br />D. Florida Building Code - 2007 with 2009 ammendments. <br />PLUMBING MATERIALS <br />PLUMBING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH FLORIDA <br />BUILDING CODE - PLUMBING 2007 AND ADA REQUIREMENTS. <br />WASTE AND VENT: NO HUB SERVICE WEIGHT CAST IRON, BY CHARLOTTE, AB&I OR TYLER, <br />CISPI STANDARD 301, ASTM A888. NSF ABOVE FLOOR WITH 'HUSKY' HEAVY DUTY *SD4000 <br />COUPLINGS ASTM C1540 AND BELL AND SPIGOT WITH NEOPRENE GASKETS ASTM STANDARD <br />C564 BELOW SLAB FOR PIPING 2' AND LARGER AND COPPER TYPE 'M' HARD DRAWN COPPER <br />WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDER FOR PIPING UP TO 1-1/2'. <br />CONDENSATE PIPING: COPPER TYPE 'M' WITH FOUGHT COPPER FITTINGS LEAD FREE <br />SOLDERED JOINTS. CONDENSATE INSULATION:ARMAFLEX OR THERMACE�LL, 25/50 FIRE/ <br />SMOKE RATING SEAL JOINTS WITH INSULATIOMFGR. ADHESIVE. LABEL PIPING AS INDICATED <br />ABOVE. <br />WATER: DOMESTIC COLD & HOT WATER PIPING SHALL BE TYPE 'L' HARD <br />DRAWN COPPER WITH WROUGHT FITTINGS, WITH 95/5 LEAD FREE SOLDERED <br />JOINTS PER FBC 2007. NSF-61. INSULATE HOT WATER PIPING USING 1' THICK FIBERGLASS <br />INSULATION HAVING A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE <br />DEVELOPMENT OF 50 OR LESS IN ACCORDANCE WITH ASTM E-84,NPFA 225 AND UL 723. <br />ACCEPTABLE INSULATION MFGR'S: KNAUF, JOHNS-MANVILLE AND CERTAINTEED. <br />FOAMGLASS INSULATION SHALL BE USED WHERE PIPING <br />PENETRATES RATED WALLS. LABEL PIPING BY ADHESIVE LABELS (TO DENOTE <br />CONTENTS AND DIRECTION OF FLOW) ON PIPING AT NO MORE THAN 25 FOOT INTERVALS, <br />AT EACH VALVE, AND AT EACH CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH <br />LOCATION WHERE LABELED INDICATING DIRECTION OF FLOW. LABELING TO BE MINIMUM OF <br />2' HIGH LETTERS. <br />LABEL PIPING BY ADHESIVE LABELS (TO DENOTE CONTENTS AND DIRECTION OF FLOW) <br />ON PIPING AT NO MORE THAN 25 FOOT INTERVALS, AT EACH VALVE, AND AT EACH <br />CHANGE IN DIRECTION. PROVIDE ARROWS AT EACH LOCATION WHERE LABELED INDICATING <br />DIRECTION OF FLOW. LABELING TO BE MINIMUM OF 2' HIGH LETTERS. <br />TEST WATER AND WASTE PIPING AS PER LOCAL CODES. <br />WATER HEATER: LOCHINVAR, A.O.SMITH <br />PLUMBING FIXTURES: KOHLER, AMERICAN STANDARD. ZURN. <br />PLUMBING TRIM: CHICAGO FAUCET, ZURN <br />STAINLESS STEEL SINK: ELKAY OR JUST <br />SHOCK ARRESTORS: SIOUX CHIEF OR PRECISION PLUMBING PRODUCTS. <br />FIXTURE CARRIER: ZURN, WADE, J.R. SMITH <br />THERMOSTATIC MIXING VALVES: SYMMONS, POWERS. <br />SUPPLY STOPS: McGUIRE OR ZURN HEAVY DUTY <br />CONTRACTOR SHALL PROVIDE PLUMBING FIXTURE AND MATERIAL <br />SUBMITTALS TO THE ENGINEER FOR APPROVAL PRIOR <br />TO INSTALLATION AND PURCHASING. <br />PLUMBING FIXTURES <br />PROVIDE PLUMBING FIXTURES, TRIM AND RELATED ITEMS SUCH AS <br />HEAVY DUTY SUPPLIES, TRAPS, DRAINS, CLEANOUTS AND <br />FIXTURE SUPPORTS AND OTHER ACCESSORY ITEMS. COORDINATE <br />FIXTURE REQUIREMENTS BY REVIEWING ARCHITECTURAL AND EQUIPMENT <br />DRAWINGS. INSTALL FIXTURES IN ACCORDANCE WITH CONTRACT DRAWINGS <br />AND MANUFACTURER'S ROUGH -IN DRAWINGS. WALL HUNG LAVATORIES SHALL <br />BE PROVIDED WITH FLOOR MOUNTED CARRIERS. <br />MATERIALS <br />HANGERS - GRINNELL BY ANVIL, B-LINE, FEE AND MASON, PHD, VIKING AND RELIABLE. <br />1. GRINNELL FIGURE *CT-69, MSS TYPE 10 WITH ADJUSTABLE WROUGHT TUBING RING <br />HANGER, COPPER PLATED FOR: NON -INSULATED COPPER TUBING WITH NO LONGITUDINAL <br />MOVEMENT; NON -INSULATED CAST IRON PIPING 2' AND LESS. <br />EXPANSION ANCHORS: HILTI KWIK-BOLT, ZINC PLATED, METAL EXPANSION ANCHOR TO BE <br />USED ON EXISTING CONSTRUCTION. ANCHOR TO MEET U.L.. ICBO-4627 AND FM LISTINGS. <br />VALVES - NIBCO, WATTS, KITZ OR MILWAUKEE <br />1. BALL VALVES (DOMESTIC WATER): <br />A. 2' AND LESS: NIBCO FIGURE T-685-80-LF OR S-685-80-LF, 2-PIECE, FULL PORT, <br />600 PSI, WOG, TFE SEATS. NSF 61, LEAD FREE. <br />B. PROVIDE EXTENDED LEVER FOR INSULATED SERVICE. <br />2. CHECK VALVES (DOMESTIC WATER): <br />A. 2' AND LESS: NIBCO FIGURE T-433 OR S-433, THREADED OR SOLDERED, <br />CLASS 150, NSF-61, LEAD FREE. <br />3. LOCATE VALVES SO AS TO BE ACCESSIBLE BY MAINTENANCE PERSONNEL. <br />ALL MATERIAL SHALL BE DOMESTIC AND SHALL BE MANUFACTURED WITHIN THE UNITED <br />STATES OF AMERICA. <br />CLOSEOUT <br />CONTRACTOR SHALL PROVIDE AS BUILT DRAWINGS IN AUTOCAD FORMAT AT COMPLETION <br />OF PROJECT. <br />1. EXISTING SERVICES INDICATED ON THESE DRAWINGS <br />WERE DERIVED FROM EXISTING DRAWINGS AND <br />LIMITED FIELD OBSERVATIONS. THESE DRAWINGS <br />MAY NOT BE ALL INCLUSIVE OF SERVICES THAT <br />EXIST IN THE PROJECT AREA. CONTRACTOR SHALL <br />VERIFY SERVICES, LOCATION, TYPE, AND SIZE <br />PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS <br />IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL <br />BE REPORTED TO THE ARCHITECT FOR COORDINATION <br />PRIOR TO CONSTRUCTION. <br />2. EXISTING SERVICES, EQUIPMENT, AND FIXTURES, TO <br />REMAIN OR TO BE RELOCATED, SHALL BE REPAIRED <br />TO ORIGINAL OPERATION OR REPLACED, SHOULD THEY <br />BE DAMAGED DURING CONSTRUCTION. <br />3. ALL EXISTING WORK NOT SHOWN ON THESE DRAWINGS <br />(UNLESS NOTED OTHERWISE) SHALL REMAIN AS IS. <br />4. ALL PENETRATIONS OR OPENINGS FROM REMOVED <br />PIPES THROUGH EXISTING BUILDING <br />WALLS AND FLOORS SHALL BE SLEEVED AND/OR <br />PATCHED TO MATCH ORIGINAL. SEE ARCHITECTURAL <br />DRAWINGS FOR FINAL FINISHES. <br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE <br />TO EXISTING PIPING , FIXTURES OR EQUIPMENT <br />DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING <br />WORK TO ITS ORIGINAL CONDITION AT NO COST TO THE <br />OWNER. <br />6• CONTINUITY OF SERVICES: EXISTING BUILDING WILL REMAIN IN <br />USE DURING CONSTRUCTION OPERATIONS. WHEN AN INTERRUPTION <br />OF AN EXISTING SERVICE IS NECESSARY, CONTRACTOR SHALL <br />COORDINATE WITH AUTHORIZED MAINTENANCE PERSONNEL BEFORE <br />MAKING THE NECESSARY INTERRUPTION. <br />7. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN <br />EXISTING WALLS TO BE DEMOLISHED AND PROVIDE NEW OFFSETS AT <br />CEILING ABOVE AND CEILING BELOW TO NEW STACK OR RISER LOCATION <br />COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS. <br />8. CONTRACTOR TO FIELD VERIFY THAT ALL EXISTING PLUMBING TO BE <br />REMOVED DOES NOT AFFECT OTHER AREA'S OF THE BUILDING THAT <br />ARE NOT IN CONSTRUCTION AND MUST STAY OPERATIONAL. IF <br />DISCREPANCIES ARE FOUND THE CONTRACTOR IS TO NOTIFY THE <br />ENGINEER. <br />9' CONTRACTOR SHALL REMOVE EXISTING PLUMBING FIXTURES AND EQUIPMENT <br />TO BE REMOVED AS SHOWN ON DRAWINGS OR AS REQUIRED. <br />CONTRACTOR SHALL CAP SERVICES NEXT TO SERVICE MAINS IN CEILINGS, <br />WALLS OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AL ACTIVE PLUMBING <br />SERVICES IN CHASES OR WALLS TO BE REMOVED, TO NEW CHASE AREAS OR <br />NEW WALLS AS REQUIRED. <br />10. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF PLUMBING <br />FIXTURES AND/OR EQUIPMENT THAT ARE TO BE REMOVED <br />TO THE LOCAL OWNER'S REPRESENTATIVE. ALL ITEMS THAT THE <br />LOCAL OWNER'S REPRESENTATIVE WISHES TO RETAIN SHALL BE <br />TURNED OVER TO THE OWNER AND THE REMAINDER SHALL BE REMOVED <br />FROM THE SITE AND LEGALLY DISPOSED. <br />PLUMBING ABBREVIATIONS <br />C.W <br />COLD WATER <br />PRY. <br />PRESSURE REDUCING VALVE <br />H.W. <br />HOT WATER <br />R.P.U. <br />REDUCED PRESSURE BACKFLOW PREVENTER <br />H.WR <br />HOT WATER RECRC <br />A.F.F. <br />ABOVE FNSHED FLOOR <br />V.TR <br />VENT THRU ROOF <br />AF.G. <br />ABOVE FNIM GRADE <br />W. <br />WASTE (INTERIOR) <br />A.P. <br />ACCESS PANEL <br />R.WL <br />RAN WATER LEADER <br />W.C.O. <br />WALL CLEANOUT <br />S.N. <br />STORM WATER <br />S.S. <br />SANITARY SEWER <br />LE. <br />INVERT ELEVATION <br />V.LV. <br />VALVE N VERTICAL <br />CA. <br />CLEANOUT <br />CA. <br />COiOESATE <br />OFCI <br />OWNER R RIEM CONTRACTOR INSTALLED <br />LE <br />INVERT ELEVATION <br />U. <br />ROOF DRAM <br />F.C.II. <br />FAN COIL UNIT <br />F.D. <br />FLOOR DRAIN <br />Nix. <br />NOT N CONTRACT <br />RREL <br />FINISHED FLOOR ELEVATION <br />E.W.C. <br />ELECTRIC WATER COOLER <br />PLUMBING LEGEND <br />SnM OES"To <br />SwIl 10"To <br />--- <br />COLD WATER <br />BALL VALVE <br />-- <br />HOT WATER GIO'F) <br />1. <br />CHECK VALVE <br />----- <br />HOT WATER RECIRCL LATKIN <br />P-1,ETC <br />FO(TLRE NOENTIFICATKM <br />_SSA <br />SANITARY SEWER UWMM) <br />CONNECTION TO COSTING <br />-W- <br />WASTE LINE <br />-a <br />CAP ON LINE <br />--V-- <br />VENT PIPE (ABOVE OR BELOW RKM) <br />PPE TURNED UP <br />--RWLP-- <br />RAN WATER LEADER <br />PPE TLFM DOWN <br />STORM WATER OROERGROIIIO) <br />SGPM <br />.5GPM <br />BALANCING VALCRCUIT SETTER W/OECK <br />VALVE SET AT <br />--SW- <br />CLEANOUT (ABOVE CEI NW <br />-D- <br />DRIP TRMN ORAN LIE <br />BCD-- <br />CONDENSATE DRAW LINE <br />PRESS IRE REDUCING VALVE <br />LIOERGROW COLD WATER <br />-PCD- <br />PUMPED CONDENSATE <br />1. PLUMBING INSTALLATION OF ALL FIXTURES. EQUIPMENT, AND PIPING <br />SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE <br />WITH ALL APPLICABLE STATE, LOCAL AND HEALTH CODES <br />REQUIREMENTS. <br />2. CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATIONS, SIZES AND <br />LOCATIONS OF EXISTING PLUMBING PRIOR TO BIDDING. IF DISCREPANCIES ARE <br />FOUND, THEY ARE TO NOTIFY ENGINEER. <br />3. ALL PLUMBING <br />MB NG FIX20UORE S TO COMPLY WITH TABLE 604.3 OF THE FLORIDA <br />BUIL4. CONTRACTOR SHALL COORDINATE EQUIPMENT CONNECTIONS & MOUNTING <br />HEIGHTS WITH KITCHEN EQUIPMENT EQUIPMENT AND ARCHITECTURAL DRAWING <br />AND SUPPLIER. INSTALL EOUIPMEW AND MAKE FINAL <br />A SET OF THE EQUIPMENT DRAWINGS PRIOR TO BIDDING IN ORDER <br />TO DETERMINE ALL REQUIRED CONNECTIONS. <br />5. PROVIDE 121XI2' ACCESS PANELS FOR ALL VALVES LOCATED <br />ABOVE HARD CEILINGS. INSTALL VALVES SO AS TO BE WITHIN <br />REACH OF ACCESS DOOR. <br />6. CONTRACTOR SHALL PROVIDE ROUGH -INS AND MAKE FINAL CONNECTIONS <br />FOR EACH PIECE OF EQUIPMENT REQUIRING PLUMBING CONNECTION. <br />INCLUDING TAILPIECES, TRAPS, LINE STRAINERS. STOP VALVES, GAUGES. <br />VACUUM BREAKERS, REDUCING VALVES, SPECIAL FITTINGS, THERMOMETERS, <br />GLOBE SOLENOID VALVES, INSULATION, AND ALL NECESSARY DEVICES <br />FOR A COMPLETE AND OPERATIVE SYSTEM. COORDINATE EXACT REQUIRED <br />PLUMBING ROUGH -INS WITH VENDOR SUPPLIER DRAWINGS. <br />7. THE CONTRACTOR SHALL INSTALL PLUMBING PIPING IN LOCATIONS INDICATED <br />ON THE CONTRACT DOCUMENTS. THE ONLY DEVIATION FROM THIS WOULD BE <br />IF ADDITIONAL OFFSETS ARE REQUIRED TO COORDINATE WITH OTHER TRADES. <br />IF THE THE CONTRACTOR DESIRES TO CHANGE THE PLUMBING ROUTING FOR <br />ANY OTHER REASON. HE SHALL COMPENSATE THE ENGINEER AT A RATE OF <br />DPE x 2.T5 TO REVISE THE PLUMBING DRAWINGS. RISER DIAGRAMS AND FOR <br />THE TIME INVOLVED IN REISSUING DRAWINGS TO THE AUTHORITY HAVING <br />JURISDICTION. CONTRACTOR SHALL CONTACT ENGINEER FOR ESTIMATED TIME <br />REQUIRED AND SCHEDULE FOR PERFORMING WORK. <br />8, EXISTING UTILITIES, WHICH ARE NOT SHOWN. THAT ARE DISCOVERED <br />DURING DEMOLITION SHALL BE BROUGHT TO THE ATTENTION OF THE <br />OWNER'S REPRESENTATIVE BY THE CONTRACTOR FOR PROPER CO- <br />ORDINATION. CONTRACTOR SHALL REMOVE, REWORK AND/OR REROUTE <br />THE EXISTING UTILITIES AS DIRECTED BY THE OWNER'S REPRESENTATIVE. <br />9. ALL MATERIALS, EQUIPMENT, AND APPARATUS SHALL BE NEW, EXCEPT THAT <br />CALLED FOR AS BEING RE -USED OR FURNISHED BY OTHERS. <br />10. SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS IN ACCORDANCE <br />WITH U.L. FIRE RESISTANCE INDEX FOR THROUGH PENETRATION FIRE STOP <br />SYSTEMS. COORDINATE REQUIREMENTS WITH ARCHITECTURAL PLANS AND <br />SPECIFICATIONS. <br />11. CONTRACTOR SHALL FURNISH AND INSTALL SHOCK ABSORBERS ON FLUSH <br />VALVE FIXTURES AND ALL LINES SERVING QUICK CLOSING VALVES AND AS <br />INDICATED ON PLUMBING PLANS AND RECOMMENDED BY THE MANUFACTURER. <br />12. ANY WALL COVERS <br />RV N ANYH CORRIDORBFLOORS IFEDISCREPANCIES RARE FOUND ON <br />PLANS CONTRACTOR SHALL NOTIFY PLUMBING ENGINEER PRIOR TO INSTALLATION. <br />13• PIPING SHALL NOT BE RUN OVER ANY ELECTRICAL EQUIPMENT. PANELS AND PHONE <br />PANELS. <br />14. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS <br />AND MOUNTING HEIGHTS. <br />15. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE <br />CHROME PLATED. <br />16. THE PLUMBING CONTRACTOR SHALL KEEP A SET OF MARKED UP DRAWINGS <br />AS THE JOB PROGRESSES. NO MAJOR CHANGE SHALL BE MADE TO PLUMBING <br />DESIGN EENNGIN ERING UNLESS IT HAS BEEN COORDINATED, DRAWN AND SUBMITTED <br />FOR APPROVAO. <br />17. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING PIPING <br />AND FIXTURES DUE TO NEW CONSTRUCTION AND SHALL RESTORE EXISTING <br />WORK DISTURBED TO IT'S ORIGINAL CONDITION AT NO COST TO THE OWNER. <br />18. CONTRACTOR SHALL COORDINATE WITH ALL <br />DISCIPLINES INVOLVED SO AS TO AVOID ANY PIPE <br />ROUTING PROBLEMS. <br />19. PROVIDE OFFSETS AND FITTINGS AS REQUIRED. <br />20. ALL <br />INTAKES, SHALL BE <br />WIINDOWS5'-0' AWAY FROM <br />21. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, NOTIFY AND COORDINATE <br />PENETRATIONS WITH ALL TRADES. THE ARCHITECT AND STRUCTURAL ENGINEER <br />PRIOR TO PENETRATING ANY BEAMS. <br />22. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL CASEWORK. <br />CONTRACTOR SHALL OBTAIN ARCHITECTURAL DRAWINGS AND REVIEW <br />PRIOR TO INSTALLATION. <br />23. FITTINGS WHICH WILLDIRECTION <br />CAUSE EXCESSIVE REDUCTIONHN THE VELOCITYD OF WITH <br />OR CREATE ANY OTHER ADVERSE EFFECT UNLESS PHYSICALLY IMPOSSIBLE <br />GEs USE OF SANITARY TEE IN A HORIZONTAL CONNECTION. USE OF A DOUBLE <br />PLUMBING FIXTURE SCHEDULE <br />FIXTURE <br />FITTING <br />____7MANUFACTURER <br />FLOOR MOUNTED <br />C.W <br />H.W. <br />WASTE <br />REMARKS <br />MODEL <br />TYPE <br />SIZE <br />MANUFACTURER <br />TYPE <br />SUPPLY <br />TRAP <br />FAUCET <br />SYMBOL <br />CARRIER <br />P-5A <br />KOHLER (HC) <br />HIGHLINE <br />K-3544 <br />FLUSH TANK <br />FLOOR MOUNTED <br />ELONGATED <br />McGUIRE <br />NA <br />H-2165 <br />INTEGRAL <br />NA <br />NA <br />I <br />/� <br />-- <br />4 <br />K-4670C WHITE. <br />SEAT <br />WATER CLOSET <br />1.5 GALLON <br />VITREOUS CHINA <br />BOWL <br />KOHLER (HC) <br />KINGSTON <br />WALL HUNG <br />CONCEALED ARM <br />5' BACKSPLASH <br />21 X18 <br />McGUIRE <br />155WC OFFSET <br />H-2165 <br />*8872 11/4 P-TRAP <br />OFFSET FOR WHEEL <br />CHICAGO FAUCET <br />•895-317FC <br />ZURN <br />I/� <br />I/� <br />lI/� <br />MOUNT 34' A.F.F. TO RIM. <br />PROVIDE TRUEBRO LAV <br />P-13 <br />LAVATORY <br />K-2005 <br />VITREOUS CHINA <br />4' FAUCET CTR <br />STRAINER <br />CHAIR USE <br />WRISTBLADE HANDLE <br />Z-1231 <br />SHIELD *2018. <br />JUST -(STAFF) <br />*SL-ADA- <br />SINGLE COMP. <br />(S.S.) 18 GAUGE <br />14' X 16' X 61/1 <br />McGUIRE <br /># <br />PROWRAP PW1152 WC <br />H-2165 <br />PROWRAP #PW2150 <br />11/ P-TRAP OFFSET <br />CHICAGO FAUCET <br />NA <br />1/� <br />1/� <br />11/1 <br />NA <br />P-20A <br />S.S. SINK <br />2019-A-GR <br />SELF -RIMMING <br />OFFSET STRAINER <br />FOR WHEEL CHAIR USE <br />*786-GN2FCCP <br />NOTE: <br />1. INSTALLATION OF FIXTURES SHALL BE FULLY COORDINATED WITH GRAB BARS. <br />2. CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL FOR A COMPLETE INSTALLATION OF THE PLUMBING FIXTURES INCLUDING ANY <br />GROUT AS REQUIRED AT WALL HUNG FIXTURES. COORDINATE WITH ARCHITECT FOR SPECIFIC GROUT REQUIREMENTS. <br />3. PROVIDE SYMMONS THERMOSTATIC MIXING VALVE *5-210-CK 1/2 GPM MIN, 2 GPM MAX ON FAUCETS. SET AT 110' F. SEE DETAILS. INSTALL PER MANUFACTURERS WRITTEN INSTRUCTIONS. <br />24. THIS CONTRACTOR SHALL BASE HIS PROPOSAL UPON T <br />SCHEDULED OR SPECIFIEDr USING THE MANUFACTURERS <br />AS CALLED FOR IN THE JPECIFICATIONS AND SCHEDULE <br />THE DRAWINGS. IF MORE THAN ONE MANUFACTURER OF EQUIPMENT IS <br />SPECIFIED ANY ONE OF THE MANUFACTURERS OF EQUIPMENT MAY BE USED IN <br />THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR <br />WISHES TO USE EQUIPMENT NOT SPECIFIED HE MUST AT THE TIME OF BIDDING, <br />SUBMIT SEPARATELY ON LETTERHEAD STATIONARY dF THE BIDDER THE <br />EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED bR TO BE <br />DEDUCTED FROM HIS PROPOSAL. <br />25. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT TIME <br />TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES <br />WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF <br />SUBSTITUTE MATERIALS. <br />26. WARRANTY/GUARANTEE <br />A.THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY <br />OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION <br />FOR THE PERIOD OF ONE YEAR. <br />B. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS. APPEARING <br />DURING THE ABOVE MENTIONED PERIOD, MUST BE IMMEDIATELY REPAIRED BY <br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE <br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE <br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIR THERETO. <br />2T. <br />2. THE CONTRACTOR SHALL INCLUDE IN BID PRICE ALL PREMIUM TIME <br />CHARGES FOR LABOR AND EQUIPMENT REQUIRED FOR ALL NIGHT AND <br />WEEKEND OVERTIME WORK, AS NECESSARY, TO COMPLETE THE SCOPE <br />OF THE CONTRACT. <br />28. ALL CONDENSATE PIPING SHALL BE INSULATED <br />THROUGHOUT ENTIRE SYSTEM. <br />29. PROVIDE A MINIMUM OF 6 INCHES BETWEEN ALL PIPING AND FIRE RATED AND SMOKE <br />TIGHT PARTITIONS FOR REQUIRED INSPECTIONS. ANY PIPING WITHIN THIS 6 INCHES <br />SPACE SHALL BE REQUIRED TO BE MOVED AND REROUTED. ANY COST IMPACT TO <br />OTHER TRADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />30. THE MAXIMUM VERTICAL DISTANCE FROM THE FIXTURE OUTLET TO THE TRAP <br />WEIR SHALL NOT EXCEED 24-INCHES AND THE HORIZONTAL DISTANCE SHALL <br />NOT EXCEED 30-INCHES MEASURED FROM THE CENTER LINE OF FIXTURE OUTLET <br />TO THE CENTERLINE OF THE INLET OF THE TRAP AS PER SECTION 1002 OF THE <br />FLORIDA PLUMBING CODE 2007. <br />31. PROVIDE THE REQUIRED CLEARANCES AND SPACE FOR ALL PLUMBING FIXTURES. <br />PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE PRIOR TO THE START OF <br />CONSTRUCTION. <br />32. ALL FLUSH VALVES, FIXTURE STOPS, VALVES, ETC., ALL PIPING SHALL BE RIGIDLY <br />SECURED (NO MOVEMENT WHEN OPERATED). INSTALL PERMANENT STAMPED BRASS <br />VALVE TAG ON EACH VALVE. COORDINATE WITH OWNER'S IDENTIFICATION SYSTEM. <br />33. INSULATION, FITTINGS COVERS AND ALL FINISHES AND MATERIALS SHALL HAVE A <br />MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING <br />OF 50. <br />34. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FROM DRAWINGS. BUT FIT WORK TO <br />ACTUAL CONDITION AND SPACE REQUIREMENTS. <br />35. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS <br />WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY AND PROPERLY <br />OPERATIVE, AND IN COMPLIANCE WITH APPLICABLE CODES AND GOVERNING <br />AUTHORITIES AND SUBJECT TO ACCEPTANCE BY OWNER/ENGINEER. <br />36. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, INSPECTIONS <br />AND TESTS. <br />37. ALL REQUIRED INSURANCES SHALL BE PROVIDED AND MAINTAINED BY THE <br />CONTRACTOR FOR THE PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY <br />DAMAGE, AND OTHER INSURANCES REQUIRED BY THE OWNER, FOR THE DURATION OF <br />THE WORK. <br />38. GENERAL NOTEi TEMPERATURE OF HOT WATER TO PUBLIC REST ROOMS SHALL NOT <br />EXCEED I10' F. PER FLORIDA ENERGY CODE 412.1.ABCD.2.3.2. CONTRACTOR <br />SHALL VERIFY TEMPERATURE OF HOT WATER SYSTEM WITH OWNER. INSTALL <br />TEMPERING VALVES AS REQUIRED, FOR A MAXIMUM TEMPERATURE OF 110' F <br />SUBJECT TO REVIEW BY ENGINEER. <br />39. CONTRACTOR SHALL PROVIDE POTABLE WATER TEST FOR DOMESTIC COLD AND <br />HOT WATER SYSTEMS BEFORE AND AFTER MODIFICATIONS ARE COMPLETE FOR <br />CONTAMINANTS. <br />40. ALL NEW VALVES INSTALLED IN DOMESTIC WATER SYSTEMS SHALL BE NSF-61 <br />CERTIFIED. <br />41. CONTRACTOR SHALL SAW CUT CONCRETE FLOOR SLAB TO INSTALL NEW <br />BELOW SLAB PIPING AND SHALL PATCH THE SLAB TO MATCH THE EXISTING <br />CONCRETE SLAB. <br />WATER HEATER SCHEDULE <br />SYSTEM <br />TYPE <br />MANUFACTURER <br />MODEL No. <br />KW <br />TOT. <br />STORAGE <br />FLOW <br />ELECKW <br />REMARKS <br />CAPACITY <br />RECOVERY <br />WATER <br />ELECTRIC <br />LOCHINVAR <br />LSK030KK <br />4.5 <br />4.5 <br />30 <br />31 GPH <br />2O8V <br />ENERGY SAVER, GLASS LINED <br />HEATER <br />WHI <br />ENERGY <br />SHORT MODEL <br />GALLON <br />600 F RISE <br />3 PH. <br />MAGNESIUM TANK SAVER, <br />SAVER <br />INSTALL EQUIPMENT <br />IN ACCORDANCE WITH <br />MANUFACTURER'S WRITTEN <br />INSTRUCTIONS. U.L. LISTED. <br />PROVIDE HEATER WITH THE FOLLOWING OPTIONS: <br />1. 3 YEAR WARRANTY <br />2. TEMPERATURE AND PRESSURE GAUGE <br />3. NSF CONSTRUCTION <br />DRAWING INDEX <br />SHEET <br />NUMBER <br />SHEET TITLE <br />PO.1 <br />PLUMBING SPECS, LEGENDS, SCHEDULES, AND DRAWING INDEX <br />P1.0 <br />UNDERGROUND PLAN - DEMOLITION - PLUMBING <br />P1.1 <br />FIRST FLOOR PLAN - DEMOLITION - PLUMBING <br />P2.0 <br />UNDERGROUND PLAN - NEW CONSTRUCTION - PLUMBING <br />P2.1 <br />FIRST FLOOR PLAN - NEW CONSTRUCTION - PLUMBING <br />P4.1 <br />PLUMBING RISER DIAGRAMS <br />P5.1 <br />PLUMBING TYPICAL DETAILS <br />E:1Mo <br />6 <br />E. <br />ftb <br />dw <br />TE OF : U <br />4. <br />�A►A1.tE���� <br />SRSmith <br />Seckman <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954)421-1260 <br />FAX: (954) 421-1466 <br />www.ssr-inc.com <br />Firm Certification - EB-0000867 <br />Dennis Davie PE - 58588 <br />John E. Moulder PE - 88200 <br />SSR JOB # 1137001.0 <br />-v; <br />N <br />k2 <br />o� <br />�s <br />. a A <br />Al. <br />2 <br />.s <br />x <br />a <br />v .. <br />y � <br />o <br />a <br />U) <br />0 N <br />Cz <br />0 <br />I _ <br />_0 <br />C� _O <br />CD <br />( -- <br />U <br />m <br />U <br />a� O <br />cl w <br />U U <br />Q � <br />U) C <br />0 G <br />Cn <br />EO <br />^:3 CV <br />Project No. 11006.00 <br />PO . 1 <br />02011 BRIPE Architects, Inc. <br />1 ? :,• � � :: • � ifs T � . - � � t .:. ! ..'i ,'�,�$Q ��++ � �1i � t a ,. ry/ « ! 4 <br />Ell <br />. <br />