Laserfiche WebLink
w <br />J_ <br />Z <br />M <br />W <br />a <br />L2 <br />I- <br />Ln <br />0 <br />J <br />0 <br />N <br />0 <br />h <br />O <br />1 1/4 " <br />2" <br />drl <br />W.H.0 <br />GENERAL NOTES: <br />1/2 <br />FIRST FLOOR PLAN - DEMOLITION - PLUMBING /N <br />1. CONTRACTOR SHALL PATCH WALLS AND CEILINGS TO MATCH EXISTING FINISHES FOR KEYED NOTES: <br />DEMOLITION AND INSTALLATION OF PIPING, ETC. UNLESS NOTED OTHERWISE ON ARCH. <br />DRAWINGS. <br />2. THE CONTRACTOR SHALL HAVE TO PERFORM WORK WITHIN ACTIVE PATIENT CARE AREAS. <br />CONTRACTOR SHALL: <br />A. COORDINATE SHUTDOWN OF EXISTING SYSTEMS WELL IN ADVANCE WITH OWNER. <br />B. PERFORM WORK AT SUCH TIMES AND UNDER SUCH CONDITIONS AS PRESCRIBED BY OWNER. <br />C. SEQUENCE DEMOLITION AND NEW CONSTRUCTION TO MINIMIZE NUMBER & DURATION OF <br />SHUTDOWNS REQUIRED. <br />3. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING CONDITIONS (STRUCTURE, DUCTWORK, <br />PIPING, CONDUIT, ETC.). PROVIDE OFFSETS AS REQUIRED TO INSTALL NEW WORK. <br />4. WORK MAY NOT BE LIMITED TO SCOPE OF WORK OR PHASING AREAS INDICATED, BUT ALSO MAY <br />INCLUDE WORK OUTSIDE OF THE SCOPE OF WORK OR PHASING AREAS AS INDICATED BY <br />CONTRACT DOCUMENTS. <br />5. CONTRACTOR SHALL LABEL EXISTING PIPING SHOWN TO REMAIN ON DRAWING, MADE ACCESSIBLE <br />BY CONSTRUCTION WORK, PER SPECIFICATIONS. <br />6. ALL WASTE, AND AND CONDENSATTEP PIING CONDENSATE2 /1 & PIPING LARGER 8TO LESS <br />BE SLOPED SLOPED I/j/FT 1/4/FT. ALL WASTE, <br />7. CONTRACTOR SHALL FIELD VERIFY WITH HOSPITAL LOCATION OF EXISTING SERVICE VALVES FOR <br />SHUTDOWN OF CW AND HW. COORDINATE TIMING, DURATION AND AREA AFFECTED BY SHUTDOWN WITH <br />HOSPITAL. <br />S. CONTRACTOR TO REMOVE EXISTING STACKS AND RISERS LOCATED IN EXISTING WALLS TO BE <br />DEMOLISHED AND PROVIDE NEW OFFSETS AT CEILING ABOVE AND BELOW SLAB TO NEW STACK <br />OR RISER LOCATION COORDINATED WITH FLOOR PLAN LAYOUT AND EXISTING CONDITIONS. <br />9. CONTRACTOR SHALL VERIFY WITH BUILDING MAINTENANCE AREAS AFFECTED BY SHUTDOWNS FOR CW, <br />HW AND SANITARY REQUIRED TO PERFORM DEMOLITION AND NEW CONSTRUCTION. <br />OREMOVE EXISING PLUMING FIXTURE AND INSTALL NW FIXTURE. CNNECT NEW F <br />WASTE, VENT,AND NEW BCW AND HW PIPING LOCATEDE IN WALLS OR OBELOW FLOOR.IXTURE TO EXISTING <br />EXTEND/ADJUST EXISTING WASTE, VENT, CW & HW PIPING WITHIN WALL AS REQUIRED. COORDINATE TIMING <br />OF WORK WITH NEW FINISH INSTALLATION. PROVIDE ADD ALTERNATE TO REPLACE EXISTING SHUTOFF VALVES <br />ON BRANCH PIPING SERVING AREA. VERIFY PROPER VALVE OPERATION AND REPLACE AS REQUIRED. <br />O2 REMOVE EXISTING FIXTURE AND BRANCH CW, HW, WASTE AND VENT PIPING BACK TO MAINS OR <br />TO LIMITS SHOWN. CAP AS REQUIRED. <br />OREMOVE EXISTING FLOOR DRAIN AND TRAP PRIMER, ALONG WITH ALL ASSOCIATED WASTE, VENT, <br />AND CW LINE BACK TO MAINS AND CAP AS REQUIRED. <br />O REMOVE EXISTING CW, HW, WASTE AND VENT PIPING WITHIN WALL. <br />DEMOLITION LEGEND <br />L <br />DESCRIPTION <br />EXISTING TO REMAIN <br />r <br />EXISTING TO BE REMOVED <br />REMOVE EXISTING TO THIS POINT <br />Tfi E OF 0: <br />;oNL. A0E;,�`• <br />Smith <br />Seckman <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954) 421-1260 <br />FAX: (954) 421-1466 <br />www.ssr-inc.com <br />Firm Certification - EB-0000867 <br />Dennis Davie PE - U588 <br />John E. Moulder PE - 33200 <br />SSR JOB # 1137001.0 <br />w <br />z az it� <br />o <br />�g <br />LO <br />-s <br />x <br />�Qj u <br />.3 u <br />ti <br />y O <br />O � <br />e <br />A <br />V! <br />I- <br />N <br />co <br />4-j <br />Cn <br />O <br />CKI <br />_-0 <br />CY) <br />_O <br />EI <br />CD <br />1 <br />O m <br />O U <br />E <br />CV `F- <br />0 0 <br />1 (� <br />U_ <br />_(Z <br />a- C <br />i G <br />O W <br />O -�e <br />LL (CS <br />a-, 0 <br />U) <br />�= CV <br />LL r <br />Project No. 11006.00 <br />p 1 1 <br />02011 B K Architects, Inc. <br />F <br />