15010 - BASIC MECHANICAL REQUIREMENTS <br />A. CODES & REFERENCES <br />1. FLORIDA STATE BUILDING CODE 2007 (WITH 2O09 AMENDMENTS). <br />2. SMACNA <br />3. NFPA 101 (2006) <br />4. NFPA 90A (2002) <br />B. SCOPE OF WORK <br />1. PROVIDE ALL REQUIRED PERMITS. LABOR, MATERIAL AND EQUIPMENT REQUIRED TO <br />COMPLETE THE SCOPE OF THE PROJECT SHOWN ON THE DRAWINGS COMPLETE AND <br />READY FOR OCCUPANCY AND USE BY OWNER. THE WORK SHALL INCLUDE BUT IS NOT <br />LIMITED TO: <br />a. REMOVAL. RELOCATION AND RE -INSTALLATION OF EXISTING EQUIPMENT AND <br />SYSTEM. <br />b. CONNECTIONS TO EXISTING OR NEW EQUIPMENT AND SYSTEMS. <br />c. MODIFICATION OF EXISTING DUCTWORK, TEMPERATURE CONTROLS, AND LIFE -SAFETY <br />SYSTEMS. <br />d. CUTTING AND PATCHING TO REMOVE EXISTING OR INSTALL NEW WORK. <br />e• CLEANING AND TESTING. <br />f. INSTRUCTION TO OWNER'S PERSONNEL. <br />2, PROVIDE ALL BUILDING PENETRATIONS REQUIRED TO COMPLETE PROJECT. ALL <br />PENETRATIONS SHALL BE PATCHED AND SEALED WATERTIGHT. MAINTAIN FIRE <br />RATINGS OF EXISTING STRUCTURE. <br />3. PROVIDE ALL NECESSARY DUCT, EQUIPMENT, PIPE SUPPORTS AND MATERIALS <br />REQUIRED FOR INSTALLATION PER THE REQUIREMENTS OF LOCAL, STATE OR FEDERAL <br />CODES. <br />C. REQUIRED SHOP DRAWINGS <br />1. INSULATION. <br />2. AIR DEVICES. <br />3. VALVES. <br />4. DUCTWORK COORDINATION DRAWINGS. <br />5. CONTROLS. <br />D. RECORD DRAWINGS <br />1. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE <br />TO THE CONTRACT DOCUMENTS. <br />2.THE CONTRACTOR SHALL PROVIDE THE ENGINEER 2 SETS OF COMPLETED RECORD <br />DRAWINGS. <br />3.THE PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCURATE RECORD <br />DRAWINGS ARE DELIVERED. <br />E. SUBSTITUTIONS <br />1. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN DRAWINGS AND <br />WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS 'SPECIFIED STANDARD' <br />OF QUALITY. NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL <br />OF THE ENGINEER 10 DAYS PRIOR TO BID DATE. <br />2.ANY DEVIATION FROM SPECIFIED EQUIPMENT THAT AFFECTS THE ELECTRICAL <br />REQUIREMENTS SHALL BE COORDINATED BY THE MECHANICAL CONTRACTOR AND <br />EQUIPMENT VENDOR WITH THE ELECTRICAL CONTRACTOR PRIOR TO SUBMITTING <br />BIDS. <br />F. ACCESS PANELS - FURNISHED BY MECHANICAL CONTRACTOR. INSTALLED BY GENERAL <br />CONTRACTOR. <br />1. PROVIDE ACCESS TO ALL SERVICEABLE EQUIPMENT IN WALLS AND CEILINGS. <br />2. MICOR STYLE M FOR DRYWALL. <br />3. MICOR STYLE K FOR PLASTER. <br />4. MINIMUM SIZE 16'x16' . <br />5. NYSTROM. KARP, J.L. INDUSTRIES OR WILLIAMS PAINT. <br />G. FLASHINGS AND COUNTER FLASHINGS <br />1. FURNISH MATERIALS AND COORDINATE INSTALLATION FOR ALL PENETRATIONS OF ROOF <br />BY ALL DUCT AND PIPE. <br />2. SHEET METAL - 24ga. ASTM A525 . <br />3. SHEET LEAD 6 Ibs PER SO. FT. (WHERE ALLOWED) <br />4. STAINLESS STEEL 20 ga. <br />5. SHEET COPPER 24 oz PER SQ. FT. <br />H. MECHANICAL SYSTEMS CLEANING <br />1. CLEAN AND TOUCH UP ALL FACTORY FINISHES. <br />2. FLUSH ALL HVAC SYSTEMS BEFORE CONNECTION TO EQUIPMENT. <br />3. CLEAN ALL CLOSED HVAC SYSTEMS WITH ALKALINE CLEANER CIRCULATED FOR 72 <br />HOURS. <br />I. CLEANING TESTING AND ADJUSTING <br />1. THE MECHANICAL CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR, ADJUST. <br />CHECK, BALANCE AND PLACE IN SERVICE THE VARIOUS SYSTEMS HEREIN SPECIFIED <br />WITH THEIR RESPECTIVE EQUIPMENT, ACCESSORIES AND PIPING. HE/SHE SHALL <br />FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND TOOLS REQUIRED TO PERFORM <br />TESTS REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING AUTHORITIES. <br />2. NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY INSPECTED AND <br />TESTED. <br />F. HANGERS AND SUPPORTS <br />1. PROVIDE ALL NECESSARY DUCTWORK, HANGERS, RODS, CLAMPS <br />AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT DUCTWORK, PIPING AND <br />EQUIPMENT FROM THE BUILDING STRUCTURE. <br />2. PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS REQUIRED TO INSTALL <br />DUCTWORK. <br />3. ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED AND PAINTED TO <br />PREVENT RUSTING. FINISH COLOR AS SELECTED BY OWNER. <br />4. THE USE OF BAILING WIRE OR PERFORATED METAL STRAPPING IS NOT PERMITTED FOR <br />SUPPORTS. <br />G. WARRANTY/GUARANTEE <br />1. THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE STABILITY OF <br />WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION OF THE <br />PERIOD OF ONE YEAR. <br />2. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING <br />DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY <br />THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE <br />OWNER AND ENGINEER. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE <br />DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIR THERETO. <br />15250 - INSULATION <br />A. INSULATION, ADHESIVES, COATINGS, SEALERS. TAPES, ETC. SHALL HAVE A FLAME <br />SPREAD OF 25 OR LESS AND SMOKE DEVELOPMENT OF 50 OR LESS IN ACCORDANCE <br />WITH ASTM E-84, NFPA 225, UL 723 AND MEET THE REQUIREMENTS OF NFPA 90A. <br />ALL INSULATING R-VALUES TO MEET THE REQUIREMENTS OF THE FLORIDA ENERGY <br />CODE. <br />B. SEMIRIGID BOARD TYPE DUCT INSULATION 1.51b DENSITY, CERTAINTEED 1 B-300. <br />JOHNS MANVILLE, KNAUF, OWENS CORNING: GLASS FAB & MASTIC ALL JOINTS, R-6. <br />I. ALL SUPPLY, RETURN AND OUTSIDE AIR WHERE EXPOSED AND IN MECHANICAL ROOMS. <br />2.MINIMUM DUCT INSULATION THICKNESS AND R VALUES ARE AS FOLLOWS: <br />a. SUPPLY AND RETURN AIR IN UNCONDITIONED SPACE: 2' (R-6 MINA.) <br />c. OUTSIDE AIR: 2' (R-6 MINA.) <br />d. SUPPLY AIR IN CEILING RETURN DUCTWORK: 1.5' (R-6 MINA.) <br />15910 - SHEET METAL ACCESSORIES <br />A. AIR INLETS AND OUTLET. <br />1. REFER TO SCHEDULE. <br />2. ALL ALUMINUM CONSTRUCTION. <br />3. ACCEPTABLE MANUFACTURERS: TITUS, PRICE, METAL-AIRE. CARNES, ANEMOSTAT, <br />NAILOR, POTTORFF. <br />15990 - TEST AND BALANCE <br />A. PROVIDE COMPLETE TEST AND BALANCE OF ALL AIR SYSTEMS IN <br />ACCORDANCE WITH NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) OR AABC <br />(ASSOCIATED AIR BALANCE COUNCIL) STANDARDS. <br />B. TEST AND BALANCE FIRM SHALL BE: <br />1. A LOCAL FIRM WITH A MINIMUM OF 10 YRS HOSPITAL EXPERIENCE <br />C. CONTRACTOR SHALL: <br />1. VISIT SITE AT START OF PROJECT AND COORDINATE REQUIRED BALANCING EQUIPMENT <br />AND DAMPERS WITH MECHANICAL CONTRACTOR. <br />2. AIR SYSTEMS: <br />a. MAKE CHANGES TO BELTS, PULLEYS, DAMPERS, VOLUME BOXES, ETC. TO OBTAIN <br />DESIGN CONDITIONS AS REQUIRED BY TAB PROCEDURES. <br />b. BALANCE SUPPLY, RETURN AND EXHAUST AIR OUTLETS WITHIN 10% OF DESIGN <br />WHILE MAINTAINING REQUIRED PRESSURE RELATIONSHIPS. RECORD DESIGN AND <br />ACTUAL TOTALS. <br />c. MEASURE AND REPORT FAN RPM, FAN SUCTION PRESSURE, FAN DISCHARGE <br />PRESSURE, FAN TOTAL PRESSURE AND PRESSURE DROP ACROSS COMPONENTS. <br />DESIGN AND ACTUAL SUPPLY, RETURN, OUTSIDE AND EXHAUST AIR. <br />d. ACTUAL AND DESIGN NAMEPLATE AMPERAGE ON FAN MOTORS. <br />e. PRESSURE DIFFERENTIAL ACROSS DUCT SMOKE DETECTORS. <br />f. ADJUST FANS FOR LOWEST STATIC PRESSURE REQUIRED TO DELIVER TO OUTLETS <br />AS NOTED IN NEBB OR AABC PROCEDURES. <br />4. CONFIRM OPERATION OF ALL CONTROLS, MANOMETERS AND SENSING DEVICES. <br />5.ON AHCA REVIEWABLE PROJECTS PROVIDE WRITTEN REPORT AT LEAST ONE WEEK <br />BEFORE FINAL INSPECTION AND PROVIDE A TECHNICIAN DURING FINAL INSPECTION <br />OF PROJECT. <br />6. CONTRACTOR SHALL PROVIDE FINAL SHEAVE CHANGE OUT AND ADJUSTMENT FOR <br />MAXIMUM AMPRAGE TO INCLUDE DIRTY FILTER ALLOWANCE LOADING ALLOWING THE <br />VFD TO RAMP UP IN RESPONSE TO FILTER LOADING. <br />F. BALANCING DAMPERS (RUSKIN MD-35 SERIES) <br />1. GENERAL -IN ALL DUCTWORK SYSTEMS. PROVIDE DAMPERS FOR PROPER CONTROL <br />AND BALANCING OF AIR QUANTITIES. CONCEALED DAMPERS SHALL HAVE CONCEALED <br />DAMPER REGULATOR. ALL COMPONENTS FOR PROPER OPERATION; (i.e. GEARS. <br />LINKAGES, CABLE, ETC.) SHALL BE INCLUDED. <br />2. TYPE: FACTORY MANUFACTURED ONLY, OPPOSED BLADE FOR 12' AND LARGER AND <br />SINGLE BLADE UP TO 11' IN HEIGHT. <br />3. MATERIAL: STEEL, 3V TYPE BLADES MOUNTED IN STEEL CHANNEL FRAME. <br />4. SHAFT: 3/1 SQUARE ROD OPERATOR WITH END BEARINGS AND GASKET SEAL AT DUCT <br />PENETRATIONS. TERMINATE SHAFT IN DAMPER FRAME WITH BUSHINGS. <br />5.OPERATOR: LOCKING QUADRANT HANDLE WITH DAMPER POSITION INDICATOR AND <br />INSULATION STAND OFF MOUNTING BRACKET FOR EXTERNALLY INSULATED DUCTWORK. <br />6. MANUFACTURER: RUSKIN MODEL MD-35 SERIES OR EQUAL BY AIR BALANCE, INC. OR <br />GREENHECK. <br />G. ACCESS DOORS <br />1. ACCEPTABLE MANUFACTURERS: <br />a. RUSKIN MODEL ADH22. <br />b. VENCO CAD-10. <br />c. GREENHECK HAD-10. <br />2. SIZE ACCESS DOOR AS FOLLOWS: <br />a. DUCT SIZES UNDER 12% DOOR SIZED SUFFICIENT TO EQUIPMENT OR REPLACE <br />FUSIBLE LINK. <br />b. DUCT SIZES 12' TO 20% 12'xl2' DOOR. <br />c. DUCT SIZES 20' TO 36% 18'xl8' DOOR. <br />d. DUCT SIZES 36' AND ABOVE: 24'x24' DOOR. <br />3. USE DOUBLE PANEL CONSTRUCTION, TWO SHEETS OF AT LEAST 24 GAUGE <br />GALVANIZED STEEL WITH 1' THICK INSULATION BETWEEN PANELS. <br />4. MOUNT DOORS IN A RIGID FRAME OF AT LEAST 22 GAUGE FORMED GALVANIZED <br />STEEL OR ALUMINUM. <br />5. PROVIDE LATCHES THAT PERMIT EASY REMOVAL OF ACCESS DOOR WHILE MAINTAINING <br />POSITIVE CLOSING AND MINIMUM LEAKAGE. <br />6. PROVIDE SPONGE RUBBER GASKETS FOR ALL DOORS. <br />7. IN ACCORDANCE WITH NFPA 90A. IDENTIFY EACH ACCESS DOOR WITH 1/1 HIGH <br />STENCILED LETTERS AS 'FIRE DAMPER', 'SMOKE DAMPER'. OR 'COMBINATION <br />FIRE/SMOKE DAMPER'. <br />H. BRANCH CONNECTIONS -CLINCH LOCK TYPE NOT PERMITTED. <br />15970 - TEMPERATURE CONTROLS <br />A. NEW CONTROL SYSTEM TO EXISTING EQUIPMENT AND PROVIDE ALL <br />MODIFICATIONS NECESSARY FOR A FULLY FUNCTIONING SYSTEM. <br />B. AIR HANDLING UNIT AND CONDENSING COILS. <br />1. THE EXISTING CONTROL SYSTEM IS TO BE MODIFIED BY THE OWNERS EXISTING <br />CONTROL VENDOR. <br />2.CONTROL CONTRACTOR SHALL PROVIDE ALL WIRING REQUIRED FOR THE CONTROL <br />SYSTEM TO OPERATE. IF THE JOB CONTAINS SMOKE DAMPERS THEY SHALL ALSO <br />BE WIRED BY T.C.C. <br />3. MOUNT THERMOSTATS 48' A.F.F. ALIGN WITH LIGHT SWITCHES, DOOR SWINGS AND <br />OTHER WALL MOUNTED DEVICES. <br />4. COORDINATE FINAL LOCATION OF THERMOSTATS WITH THE OWNER PRIOR TO <br />INSTALLATION. <br />3 I(: <br />V: OF <br />NAL <br />Smith <br />IN516k Seckman <br />Reid, Inc. <br />600 West Hillsboro, Suite 300 <br />Deerfield Beach, FL 33441 <br />(954)421-1260 <br />FAX: (954) 421-1466 <br />www.ssr-inc.com <br />Firm Certification - EB-0000857 <br />Dennis Davie PE - 58888 <br />John E. Moulder PE - 33200 <br />SSR JOB # 1137001.0 <br />�. I�' i. ...�V„ � LJ. ..1. .� i '.i i .. �i' .. .. -'..�1 ._ Jl���:ii .1�.. n r _�. . 'I. II - rl. .�i•I.J rV.lt ..i ��:l: l �I_-'1NLV.J 11 i q'+ � 1. -l• a «�n� � .. .,. s'.. <br />c3 <br />ti <br />o . R <br />N ci� _R � <br />I-C> a a <br />0 <br />zt <br />b <br />a <br />A 9 <br />e <br />0 <br />C!) <br />Q <br />Qa <br />N <br />CIS <br />-IF-+ <br />Cn <br />0 <br />Cz <br />0 <br />_L_ <br />_0 <br />U_ <br />I <br />0) <br />.D <br />CD 0 <br />U_ <br />C <br />Cz <br />CZ _ U <br />a) <br />U <br />rQ � <br />v <br />U <br />Cz <br />Co 0 <br />=N <br />T <br />Project No. 11006.00 <br />M0.3 <br />®2011 BNIPSArchitects, Inc. <br />