Laserfiche WebLink
a <br />7 <br />O N <br />b- <br />rn o <br />L <br />►2 <br />00 <br />a <br />N <br />er- <br />N, <br />�a <br />r----------- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Demolltlon Notes <br />1. Remove existing walls and doors shown dashed. <br />2. Remove all plumbing fixtures shown dashed cap plumbing at floor line. <br />3. Remove all flooring and base. <br />4. Remove all ceiling grid and tile. <br />5. Remove all A/C diffusers and light fixtures. Contractor to store for reinstallation. <br />6. Remove all counter tops. <br />7. Remove all abandoned wiring and duct work. <br />8. Contractor to protect all existing walls to remain. <br />9. Existing offices to remain in operation during construction. Contractor shall not block access to <br />the building or the parking lot. <br />10. The shaded areas indicate floor cuts for plumbing <br />ll. Remove all wall covering and wall paper borders <br />�--------------------------------------------------' EXISTING VARIES EXISTING <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />IE l I E 1=1 I EIII <br />LL L=11 XIS <br />I <br />12' long 05 dia at <br />I 3,000 psi concrete 24' o.c. alternating sides <br />I I on vapor barrier, compacted fill, with epoxy Into existing slab <br />Align \ / <br />I <br />I <br />I <br />II I <br />II I <br />II I <br />�I <br />Remove existing doors, trim, etc. <br />EXISTING i RENOVATION shown dashed <br />Remove existing partitions, flooring, the door, trim, <br />plumbing fixtures shown dashed, <br />cap plumbing <br />1 DEMOLITION PLAN <br />Al.l v8 • • P-0• <br />Note: Retain all door being removed <br />for reinstallation. ref inish as required <br />J <br />Project No. 11006.00 <br />A to I <br />© 2011 BH/PK Architects, Inc. <br />--- <br />r /ll /nnrl rI rn In 1II <br />