My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6803 Branham Mill Ct (2)
Zephyrhills
>
Building Department
>
Building Plans
>
6803 Branham Mill Ct (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 5:07:19 AM
Creation date
2/28/2025 8:15:57 AM
Metadata
Fields
Template:
Building Plans
Street #
6803
Location
Branham Mill Ct
Contractor
KHFO LLC
Building Plans - Permit #
3406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B'q'QR/CADErM � 1M <br />DE <br />BARR/CADErM 13ARR�GA <br />iStart 2-3 feet from a corner. Wrap around <br />corner and continue nailing or stapling as you <br />move around the house. Use fasteners that <br />are long enough to penetrate into the stud or <br />nail base material. <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />Fold the three flaps in through the opening, <br />fastening them inside with staples set about <br />every 6". Fold top flap up and tape temporarily <br />as shown. <br />Other Important Details: <br />• Install building wrap "shingle -lap'" fashion <br />(with the higher piece lapped over the <br />outside of the piece below). <br />• All horizontal overlaps of building wrap <br />should be at least 4" and vertical overlaps <br />should at least be 6". <br />WRB INSTALLATION <br />BARRICADETM BARRICADETM <br />BARRICADETM <br />? 2- ) Secure BarricadeTM Plus firmly in place by <br />fastening it every 12"-18" along the vertical <br />studs using large -headed or plastic cap nails or <br />minimum 1 " crown staples. You may install it <br />over wood based, foam insulative, or fiberboard <br />sheathing or exterior gypsum board. <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM BARRICADETM BARRICADETM <br />5) Install the bottom flashing over the wrap. <br />Note: Barricade Building Products recommends <br />the use of flashing material, such as OptiFlash® <br />or Contour® premium butyl rubber flashing, that <br />meets or exceeds Federal Specification <br />UU-B-790a, Grade A and is minimum 6" in <br />width. <br />• At roof sections, be careful to lap the <br />building wrap over the entire top of any step <br />flashed areas against the wall. <br />• Around exterior doors, follow the same <br />flashing procedures as indicated in steps 5 <br />and 6 for windows. <br />BARRICADETM BARRICADETM <br />3- <br />Make an inverted "Y" cut in the <br />wrap at window rough opening. <br />Make diagonal cuts at the top of <br />the rough opening corners. <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />t <br />BARRICADETM <br />�t <br />Example <br />NOTE: FLASHING AT EXTERIOR WINDOW AND <br />DOOR OPENINGS SHALL BE INSTALLED IN <br />ACCORDANCE WITH FMA/AAMA 100, FMA/AAMA <br />200, FMA/WDMA 250, FMA/AAMA/WDMA 300 OR <br />FMA/AAMA/WDMA 400 AS PER R703.4.1.4 <br />(2020 FBC-RESIDENTIAL, 7TH EDITION) <br />D) I SEAL EDGE OF P.T. WOOD <br />BUCK TO MASONRY <br />n <br />n <br />BARRICADETM TM C <br />BARRICADE V <br />6: <br />Install window. <br />Flashing details around window: <br />,q Install side flashing over side window flanges. <br />g Install head flashing over the top window <br />flange and extend it out 3%4" over the side <br />flashings. <br />C Bottom window flange should be over <br />flashing, installed in Step 5. <br />D Remove temporary tape from top building <br />wrap flap and apply over installed head <br />flashing. <br />Note: Windows must be installed in <br />accordance with manufacturer's <br />recommended installation procedures. <br />VA 9:4 Rol [01i181�l11;1I! <br />1) PROTECTO WRAP LWM200 OR <br />SIMILAR ON WINDOW SILL, JAMBS <br />AND HEAD. APPLY AROUND <br />CORNER AND EXTEND 6" ALL <br />AROUND THE EDGES OF THE WALL <br />PRECAST SILL <br />2) SET P.T. WOOD BUCK <br />OVER CMU <br />WATERPROOFING IN <br />URETHANE SEALANT. <br />FASTEN PER PRODUCT <br />APPROVALS. <br />3) APPLY LIQUID <br />WATERPROOFING <br />MEMBRANE OVER THE TOP <br />AND EXTERIOR FACE OF <br />BUCK AND SILL <br />4) INSTALL WINDOW <br />OR DOOR. FASTEN PER <br />PRODUCT APPROVALS <br />AND SEAL WINDOW OR <br />DOOR FRAME TO P.T. <br />WOOD BUCK AND <br />MASONRY <br />CMU OPENING WATERPROOFING <br />SCALE: N.T.S. <br />• Barricade Flash Right <br />SBS Window & Door <br />Flashing Tape <br />• Barricade Sill Corners <br />• Barricade Conform <br />Stretchable Flashing <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />BARRICADETM <br />WOOD OPENING WATERPROOFING <br />SCALE: N.T.S. <br />Ft <br />N <br />.e T <br />r <br />cr <br />W <br />�20C <br />3: 0 >- <br />> M < 0 <br />W=o� <br />c�UWW <br />¢ :D W <br />_ I- > J <br />cc Cr <br />Y O F— Z <br />�WOOC/) <br />zzz�"z <br />�gQ�J <br />wa=oca <br />=z°U) <br />P Q <br />�a O^ <br />O �¢ <br />cn <br />Wj <br />0 <br />O <br />w <br />V <br />Q <br />0 <br />U <br />Z <br />0 <br />p <br />10 <br />0 <br />0 <br />Cn <br />a <br />W <br />I <br />w <br />A <br />� <br />w <br />W <br />0 <br />R <br />a <br />U) <br />W <br />0 <br />ZW <br />0� <br />(� <br />Q <br />Q <br />Q <br />Q <br />Q <br />4 •� <br />F <br />go <br />c ui . <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6102 <br />RELEASED:12/23/21 <br />SHEET <br />WP2 <br />SCALE: N.T.S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.