My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6959 Shelby Lynn Way
Zephyrhills
>
Building Department
>
Building Plans
>
6959 Shelby Lynn Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:07:27 AM
Creation date
2/28/2025 8:16:20 AM
Metadata
Fields
Template:
Building Plans
Street #
6959
Location
Shelby Lynn Way
Contractor
KHFO LLC
Building Plans - Permit #
3405
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16"x8" THIGKENI <br />EDGE W/ (2) #5 <br />GONT. <br />THICKENED EDGE @ GARAGE DOOR DETAIL. <br />SCALE: WS <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6.- <br />TO BOND BEAM. LAP w/ <br />FOUNDATION DOWEL <br />MIN. 30" GROUT CELL <br />SOLID <br />• X <br />z <br />c0 O _ GRADE <br />—I 1=111- tY <br />I I —I <br />— 1-1 m <br />8" WIDE GONT. <br />GONG. GURB <br />6ARA6E SLAB <br />F(5EE PLAN) <br />III —III III <br />111EIII—I I M <br />III—IIMIII-1 11- <br />1=1I11=1IM 1I- <br />III-1I1-1II- <br />I #5 DOWEL W/ 6" HOOK AT <br />_ II MITI-1' ALL VERT. WALL REINF. <br />III=1 III=III= III I I (SEE PLANS FOR LOCATION) <br />1 �—III—III-111=I - <br />GLEAN COMPACTED' <br />FILL ® 95% WI TH MONOLITHIC FOUNDATION <br />STANDARD DENSITY W/ (2) #5 GONT. ON CHAIRS <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BARS <br />(D�Lft&E011;111 DETAIL <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO — <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" GROUT CELL 50LID <br />a :111=1 <br />(z 0_3 6RADE I I—I11= <br />a°11=_I <br />III —III < I —I I I —III <br />—III— `' I I I `. 11 MI I M'=11I m—III_ <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(SEE PLAN) <br />' =III— a 11I — 1) #5 DOWEL W/ 6" HOOK AT <br />ALL VERT. WALL REINF. <br />' I l I 1 I I—III=III _� 11 (SEE PLANS FOR LOCATION) <br />; I I I <br />GLEAN COMPACTED I II i i <br />—III..-1i <br />FILL ® G5% WI TH MONOLITHIC FOUNDATION <br />STANDARD DENSITY W/ (2) #5 GONT. ON CHAIRS <br />2-5TORY: 1'-4" WIDE <br />W (2) #5 BAR5 <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />FOOTING SECTION W/ BLOCK DETAIL <br />SCALE: NM <br />8" GMU BLOCK R4.1 FI-FOIL OR EQUAL <br />BEYOND OVER 3/4" FURR STRIPS <br />EXTERIOR DOOR -PER BUILDER <br />MTL. THRE5HOLD HOUSE SLAB <br />SET IN SEALANT (SEE PLAN) <br />PAVERS <br />(5EE PLANS) <br />a a < <br />° IIIA10II—I <br />I—_ — - III—IIMIII—III Ti <br />—III—III- � I —III P III—III=1 I I —I � 1— <br />'—III ,1 III —I I I —III —III —I I- <br />-I 11= 4�11111 <br />171 <br />° a 111EIII—I I I- <br />' 1=1 m III, -III- <br />' <br />GLEAN COMPACTED " III —I I=Ili FOUNDATION W/ (2) #5 <br />FILL ® q5% STANDARD WI TH GONT. ON CHAIRS <br />DENSITY AND TERMITE <br />TREATED 2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />ENTRY DOOR DETAIL <br />6 SCALE: NT5 <br />8" GMU BLOCK <br />BEYOND <br />R4.1 FI-FOIL OR EQUAL <br />EXTERIOR DOOR <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />MTL. THRESHOLD <br />SET IN SEALANT <br />HOUSE SLAB <br />3Y2" GONG. SLAB <br />(SEE PLAN) <br />w/ WWF OR <br />PORGH/PATIO/LANAI <br />T <br />FIBERME511 REINF. <br />LU <br />SLAB OR PAVERS <br />OVER 6 MIL. <br />(SEE PLANS) <br />VAPOR BARRIER <br />> <br />PER MANUF. —I I I=1 <br />I I M 11= <br />I I <br />a <br />_ <br />III —III- tY I —III <br />a IIMIII—III— <br />P —I <br />11EIIII—III—I <br />I I_ 1 <br />11-1 <br />' . 111-1 III —I I <br />'—I I I_ I I <br />I1=1I <br />e ° a ° 11 MI I MI <br />I- <br />I I <br />� ° a� ea d° <br />—I <br />I I m III I I <br />. <br />`.° 1 1=1I11=1 <br />III —I 11= <br />_ �, <br />I , v <br />m <br />III <br />—III <br />z <br />I I <br />1 I—III—III=1I(—III-1 <br />—III —III III— <br />i - <br />MONOLITHIC <br />cn <br />GLEAN COMPACTED <br />III —1 I �= I �' <br />FOUNDATION W/ (2) #5 <br />8" S" <br />(2) #5'5 <br />GONT. <br />FILL ® G5% STANDARD <br />WI TH <br />GONT. ON CHAIRS <br />DENSITY AND TERMITE <br />TREATED <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />I -STORY: 1'-0" WIDE <br />W/ (2) #5 BARS <br />EXTERIOR <br />OUT5WI NG 4 <br />5GD POURED SILLS DETAIL <br />TH I GKENED 5LAB <br />@ RE0E55 <br />DETAIL <br />I I <br />SCALE: WS <br />SCALE: NT5 <br />r(SATIO1PORGH/LANAI <br />SLAB <br />EE PLAN) <br />8"x8" THIGKENED — <br />SLAB W/ (1) #5 GONT. <br />&:Hl��ENEII EDGE DETAIL <br />8" GMU BLOGK <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP W <br />FOUNDATION DOWEL MIN. <br />30" 6ROUT GELL SOLID <br />PORGH/PATIO/LANAI <br />SLAB OR PAVERS <br />(SEE PLAN) <br />� � I <br />`r I EXP JOINT — v <br />m <br />d 4" <br />rill <br />ll <br />R4.1 FI-FOIL OR EQUAL <br />OVER 3/4" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(SEE PLAN) <br />` 11=1 I15-9H ` (I) #5 DOWEL W/ 6" HOOK AT <br />III=III= ALL VERT. WALL REINF. <br />' I III-1 1=III—I I III= (SEE PLAN5 FOR LOCATION) <br />GLEAN COMPACTED 1 11 11111111 111 <br />FILL ® c15% MONOLITHIC FOUNDATION <br />STANDARD DENSITY WI TH W/ (2) #5 GONT. ON <br />GHAI R5 <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />I -STORY: 1'-0" WIDE <br />W/ (2) #5 BARS <br />EXTERIOR WALL ® PORCH/PATIO/LANAI DETAIL <br />SCALE: WS <br />Y2" 6YP. BO. EA. SIDE <br />OF 2x45 ® 16" O.G. <br />Y2" J-BOLTS 6" FROM EA. <br />END OF WALL AND <br />SPACE ® 32" O.G. <br />2" L (6" MIN. EMBED) <br />LU—�, STUD PLATE TIES PER <br />} PT BOT. PLAN ® STUD TOP 4 <br />PLT. BOT. <br />a.. ° e a <br />4 e <br />� e <br />d 4 A I <br />0 <br />e as d <br />(2) #5'5 GONT. W/ --� „ <br />11 <br />3" MIN. CLEAR 8 8 <br />UPLIFT CONNECTORS SUCH AS STUD PLATE TIES, HURRIGANE CLIPS, AND <br />ANGHOR BOLTS ARE NOT REQUIRED ON WALL5 NOT 505JEGT TO A <br />CALCULATED NET UPLIFT FORGE. WALL WHIGH REQUIRE SUCH HARDWARE <br />WILL BE 5PEGIFIGALLY NOTED ON PLAN. <br />GARAGE STEP DOWN DETAIL <br />SCALE: NM <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO <br />— <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" GROUT CELL 50LID <br />z•X <br />Y� <br />co m RADE <br />' III=III=III=III- <br />z PVC CHASE SLEEVE TO BE <br />� ' �=III=1 I I III=111=I <br />TWIGE THE DIAMETER OF <br />' ' I I III I I —III —III I —III �oTEGTED PIPE <br />GLEAN COMPACTED <br />FILL ® 95% III. MONOLITHIC FOUNDATION <br />STANDARD DENSITY WI TH W/ (2) #5 GONT. ON GHAIR5 <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BAR5 <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />DETA I L <br />8 SCALE: NT5 <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(SEE PLAN) <br />," II IIE�' I E61 III-III- <br />set'®�'' _ N�; <br />>�• N° <br />o <br />© capmght`MULAW®` 16 2021 <br />Structural E1V11eLMtng, Inc. <br />Z <br />JLU <br />w <br />w <br />09 <br />c� <br />Z <br />w L <br />J <br />oac .a <br />Z= A <br />C <br />= et <br />J� Qo <br />Z 2 o <br />�W CP <br />p <br />y m0 ccQ� <br />�h <br />Y.1 G N OC ch o. <br />IV <br />M&K project number: <br />068-2001 1 <br />project mgr: J S B <br />drawn by: DJ R <br />issue date: 1 2-1 5-21 <br />REVISIONS: <br />date: initial: <br />sheet: <br />d <br />O <br />a <br />0 <br />LL <br />JLd <br />� <br />C] <br />z <br />0 <br />x <br />d <br />a <br />Q <br />W <br />U <br />J <br />.1 u) <br />O.. <br />z <br />J J <br />Dm 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.