Laserfiche WebLink
An <br />RIGHT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />In <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />TEXTURE <br />say, .,:��•':'rvr <br />BODY COLOR <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />G. <br />J <br />W <br />ui <br />�O>-F- <br />>�ao <br />WC)I— <br />cnUWw <br />¢�WI- <br />_ <br />J <br />> <br />cr tY <br />Y O H Z <br />C,dtLOOc/) <br />Lu <br />Z Z Z F— Z <br />oc J a J <br />W0—=Ir9 <br />�cn0OU <br />=zLLw <br />�I—QZ� <br />cz <br />n <br />Z <br />Q <br />0 <br />O <br />O <br />r� <br />V <br />U) <br />Z <br />O <br />00 <br />Lal <br />o <br />� <br />� <br />w <br />o <br />� <br />w <br />w <br />w <br />w <br />`~ <br />A <br />w <br />0 <br />x <br />z <br />Z <br />0 <br />IL <br />r <br />m <br />w <br />0 <br />t <br />Od <br />w <br />� <br />o <br />MAt 0 2 2022 <br />. G <br />r awa <br />COMMUNITY: <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6103 <br />RELEASED: 9/22/21 <br />SHEET <br />A2.2 <br />