Laserfiche WebLink
MASONRY LINTEL A55EM5L I E5 <br />5EE 5GHEDULE AND 5PECIFIGATION5 FOR ADI?t INFO <br />rr <br />MIN. (1) GOUR5EAM Q +�-MIN (1) GOURSE/BOND <br />I I BEAM ABOVE LINTEL I I BEAM ABOVE LINTEL <br />6Rour dour <br />BOTTOM REW <br />�., x.. <br />PRECAST LINTEL I PRECAST LINTEL W <br />MB EMBEDDED FEW MB EMBEDDED RE1w. <br />I <br />I 1 <br />TOP RSE, IF <br />I�- <br />J I L4J <br />i +OURSE, <br />= <br />TOP CI IF <br />I L4J <br />P <br />I REQb PER ARCH. <br />WGID PER ARCH. <br />TOP REINF. OR CONT. <br />CONT. BOND BEAM <br />BOND BEAM REINF. <br />It <br />" <br />REINF. AS REAb <br />6Rour <br />' <br />6RouT <br />_ <br />BOTTOM REW <br />BOTTOM REW <br />I a• I PRECAST LINTEL W <br />�M EMBEDDED REW <br />_ra <br />MB-4 <br />PRECAST LINTEL W <br />REW <br />MASONRY LINTEL DETAILS <br />REINFORCEMENT <br />MARK <br />DE516NATION <br />TOP <br />BOTTOM <br />SHEAR REINFORCEMENT <br />MB-1 <br />8F8-OB/OT <br />----- <br />----- <br />43-2 <br />SFS-15/oT <br />----- <br />(1) #5 <br />MB-3 <br />8F16-I5/IT <br />(1) #5 <br />1 (1) #5 <br />M13-4 <br />8RFI4-I13 <br />----- <br />----- <br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PREGA5T GO., <br />AND LOTT'S CONCRETE. <br />NOTES: <br />I. ALL LINTELS w/ 5PAN5 GREATER THAN 14'-0" 5HALL BE PRE5TRE55ED. <br />2. 5HORE FILLED LINTELS A5 REQURIED. <br />3. ALL LINTEL5 5HALL HAVE 4" MINIMUM BEARING U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55E1? LINTELS. <br />5. ALL REINFORCEMENT 5HALL BE 6RADE 60, fy=60 k51 <br />6. ALL LINTELS 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE516N. <br />1. ALL LINTEL5 ARE TO BE LOCATED DIRECTLY ABOVE THE OPENING BELOW <br />SHEET LIST INDEX <br />SHEET DESCRIPTION <br />SHEET TITLE <br />5-0.0 <br />5TRUGTURAL NOTES <br />F-1.0 <br />SLAB PLAN <br />F-2.0 <br />BLOCK PLAN <br />5-1.3 <br />ROOF FRAMING PLAN <br />50-1 <br />FOUNDATION DETAILS <br />50-2 <br />STRUCTURAL DETAILS <br />P655-1 <br />STRUCTURAL DETAILS <br />GENERAL STRUCTURAL NOTES <br />FOUNDATION <br />• DESIGN 15 BASED ON 1th EDITION (2020) FLORIDA BUILDING CODE. <br />• FOOTING DE516N - THE5E FOOTINC75 HAVE BEEN ENGINEERED FOR A <br />MINIMUM ALLOWABLE 501L BEARING CAPACITY OF 1,500 P5F. <br />• ALL LUMBER EXPOSED TO WEATHER OR IN CONTACT W/ CONCRETE <br />OR MA50NRY FOUNDATION SHALL BE PRESERVATIVE TREATED <br />SOUTHERN PINE #2. <br />• FASTEN PARTITION WALLS To SLAB WITH Y4" DIA. x 23/4" LON6 <br />TAPGON5 a 52" o.c. MAX. WITH A MINIMUM OF 2 TAPGON5 PER <br />PLATE, 12" MAX. FROM PLATE ENDS. <br />• BUILDER TO VERIFY GORRO51ON-RE515TANGE COMPATIBILITY OF <br />HARDWARE $ FA5TENER5 IN CONTACT w/ PRESERVATIVE -TREATED <br />WOOD. CONTACT LUMBER 4 HARDWARE SUPPLIERS TO GOORD. <br />• CONCRETE DE516N BASED ON AGI 318, GONGRETE 5HALL ATTAIN <br />THE FOLLOWING MINIMUM GOMPRE551VE 5TREN6TH5 IN 28 DAYS, <br />U.N.O.: <br />f'c = 2,500 p51:....... FOOTIN65 <br />2,500 psi:....... 5LA55 ON GRADE (INTERIOR 4 EXTERIOR) <br />fy = 60,000 psi ...... REBAR <br />• ALL CONCRETE EXP05ED TO THE WEATHER SHALL NOT HAVE LE55 <br />THAN 5% OR MORE THAN 1% AIR ENTRAINMENT. <br />• ALL FOOTIN65 SHALL BEAR AT LEAST 12" BELOW FIN15H GRADE. <br />• FOOTINGS AND 5LAB5 ON GRADE SHALL BEAR ON GLEAN, FIRM <br />VIRGIN 501L OR GLEAN FILL COMPACTED TO A 015% PROCTOR VALUE <br />• MINIMUM LAP 5PLIGE5 ON ALL REINFORCEMENT SHALL BE 48 BAR <br />DIA. <br />• HOOKS SHALL BE PROVIDED AT 0I5GONTIN0005 END OF REINF. <br />• GROUT SHALL BE A5TM G416 F'c=3000 P51 w/ MAX 3/e" AGGREGATE <br />• CONCRETE MA50NRY UNITS SHALL BE A5TM GqO WITH A MINIMUM <br />GOMPRE551VE 5TREN6TH OF Ig00 P51 (F'M = 1500 PSI). ALL <br />MORTAR SHALL BE A5TM C210, TYPE 5. GMU DE516N BASED ON <br />AGI 530/530.1 <br />• REINFORCED GMU GORES (A5 INDICATED ON PLAN) SHALL <br />BE REINFORCED w/ (1) #5 BAR VERTICAL. BAR SHALL <br />EXTEND INTO BOND BEAM AT TOP WALL AND SHALL <br />ALI6N WITH FOOTING DOWEL BELOW. PROVIDE MIN 30" <br />LAP 5PLI6E WITH FOOTING DOWEL. <br />• GROUT 50LID ALL REINFORCED GMU CELLS AND BOND BEAMS <br />• ALL BOND BEAMS ARE TO BE 8" GONT. FULL LENGTH OF WALL w/ <br />(1) #5 BAR GONT. (TYP. ® EXT. PERIMETER) <br />• PROVIDE (1) #5 BAR GROUTED SOLID ON EACH 51DE OF ALL <br />MASONRY OPENIN65 AND AT ALL WALL CORNERS. <br />• VERTICAL REINFORCEMENT 5HALL BE HELD IN PLACE AT THE TOP <br />AND BOTTOM, SHALL BE LOCATED IN THE CENTER OF THE MASONRY <br />CELL, AND SHALL BE LOCATED AT A MAXIMUM OF 8'-O" O.G. IN <br />EXTERIOR WALL5. (A5 SHOWN ON PLANS) <br />• ROU6H OPENING5 ARE GALLED OUT ON PLAN - <br />BUILDER TO VERIFY. <br />• PROVIDE CONTROL JOINTS AT ALL INSIDE CORNERS OF 5LA13 <br />E06E5, AND OTHER LOCATIONS WHERE SLAB CRACKS ARE LIKELY <br />TO DEVELOP. EXACT LOCATIONS PER BUILDER. <br />• SAW GUT OR TOOLED JOINT DEPTH SHALL BE Y4 OF THE DEPTH <br />OF THE SLAB (I" FOR A 4" SLAB) <br />• JOINTS SHALL BE LOCATED o 12-0" O.G. (RECOMMENDED) OR <br />15-0" O.G. (MAXIMUM) <br />• JOINT GRID PATTERN SHALL BE A5 CL05E TO 5QUARE5 AS <br />P0551BLE (I:I RATIO), WITH A MAXIMUM OF 1:1.5 RATIO <br />CONNECTION SPECIFICATIONS (TYP. U.N.O.) <br />DESCRIPTION OF BLD6. ELEMENT <br />3"4.131" NAILS <br />3"0.120" NAILS <br />JOIST TO 50LE PLATE <br />(3) TOENAILS <br />(3) TOENAILS* <br />50LE PLATE TO JOI5T/BLK'6. <br />(3) NAILS o 4" O.C. <br />(3) NAILS o 4" o.c. <br />STUD TO 50LE PLATE <br />2 TOENAILS <br />(3) TOENAILS" <br />TOP OR 50LE PLATE TO STUD <br />2 `NA IL5 <br />3 NAILS <br />RIM TO TOP PLATE <br />TOENAILS ® 8" o.c. <br />TOENAILS 0 6" o.c.* <br />BLK'6. BTWN. J015T5 TO TOP PL. <br />(3) TOENAILS <br />(3) TOENAIL5* <br />DOUBLE STUD <br />NAILS o 24" o.c. <br />NAILS a I6" o.c. <br />DOUBLE TOP PLATE <br />NAILS 0 24" o.c. <br />NAILS o 16' o.c. <br />DOUBLE TOP PLATE LAP 5PLIGE <br />q NAIL5 IN LAPPED AREA <br />II NAILS IN LAPPED AREA <br />TOP PLATE LAP o CORNERS 8 <br />INTER5EGTIN6 WALLS <br />(2) NAILS <br />(2) NAILS <br />* 2Y2"x0.113 15 AN ACCEPTABLE ALTERNATIVE TO A 3'W.120", SAME 5PA61% OR NUMBER OF <br />NAILS. (ONLY ACCEPTABLE WHERE * ARE 5HOWN) <br />TH15 MODEL HAS BEEN DE516NED IN <br />AGGORDANGE WITH THE Ith EDITION (2020) <br />FLORIDA BUILDING CODE (SECTION 160q) <br />LATERAL DE516N REQUIREMENTS FOR THE <br />FOLLOWING WIND SPEED 4 EXPOSURE ONLY: <br />140 MPH - EXP. B <br />WIND I MPORTANGE FACTOR = 1.0 <br />INTERNAL PRE55URE GOEFF I G I ENT = <br />ENGL05ED, +/- 0.18 <br />ANY WIND 5PEED/EXPO5URE NOT LISTED HERE <br />REQUIRES FORMAL EVALUATION I APPROVAL <br />FROM M+K STRUGTURAL EN6INEERIN6. <br />EXTERIOR 4 SHEAR HALL <br />SHEATHING SPECIFICATIONS <br />INDICATES LOCATION AND EXTENT OF <br />5HEARWALL WHIGH REQUIRES 5HEATHIN6 AND/ OR <br />FASTENING 5PEGIFIGATION5 BEYOND THAT OF <br />5TNDRD CONSTRUCTION <br />5YMB0L SHEAR PANEL 5PEG. <br />15/32" PLYWOOD OR 05B FASTENED W <br />PI 2V211x0.131" NAILS ® 6" o.G. ALONG PANEL <br />E06E5 AND 12" o.G. IN THE PANEL FIELD. <br />15/52" PLYWOOD OR 05B FASTENED W <br />P3 2V2"x0.131" NAILS @ 3" o.(,. ALONG PANEL <br />E06E5 AND 12" o.c.. IN THE PANEL FIELD. <br />STANDARD EXTERIOR WALL 5HEATHIN6 REQUIREMENTS: <br />SHEATHE ALL EXTERIOR WOOD FRAMED WALLS w/ 15/32" <br />PLYWOOD OR 056 FASTENED w/ 2 "xO.131" NAILS ® 6" O.G. AT <br />ALL PANEL E1?GE5 AND @ 12" O.G. AT CENTER. (U.N.O. ON PLANS) <br />I. ALL PANEL E06E5 SHALL OCCUR OVER FRAMING OR 2X <br />BLOGKINC7 5HALL BE PROVIDED TO SUPPORT PANEL E06E <br />AND FASTENING <br />2. ALL STRUGTURAL PANELS ARE TO BE DIRECTLY APPLIED TO <br />STUD FRAMING ® 16"o.c. MAX. U.N.O. ON PLAN. <br />3. ALL 5HEARWALL5 SHALL HAVE DOUBLE TOP PLATES <br />FASTENED TOGETHER w/ 5142"xO.131" NAILS ® I6"o.c. USE (8) <br />3142"xO.131" NAILS ® EA. LAP SPLICE. (TYP. U.N.0) <br />4. LATERAL ANALY515 A55UME5 ALL INTERIOR 5HEARWALL5 <br />AND EXTERIOR WALLS ARE CONTINUOUS SHEATHED ABOVE <br />AND BELOW OPENIN65. <br />5. SEE ARCHITECTURAL DRAWIN65 FOR ADD'L WALL <br />CON5TRUCTION REQUIREMENTS. <br />6. ALL EXTERIOR WALLS ARE 0ON5IDERED 5HEARWALL5, <br />1. WHERE PANELS ARE APPLIED TO BOTH FACES OF WALL, <br />PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT <br />FRAMING MEMBERS. <br />8. A MAXIMUM OF TWO 1'4' WIDE X 2'-0" TALL OPENIN65 ARE <br />PERMITTED TO BE GUT INTO INTERIOR 5HEARWALL5 50 <br />LONG A5 THEY ARE FRAMED OUT TO PROVIDE THE <br />5HEATHIN6 EDGE NAILING REQUIRED AND OCCUR 16" MINIMUM <br />FROM THE EN05 OF THE 5HEARWALL. <br />q. ALL 5HEATHIN6 PANELS TO MEET U.5. PRODUCT STANDARD <br />P51 OR P52, OR APA PRP-108 WITH 33(6 SPAN RATING (MAX.) <br />10. NOTE: IF FIRE -RATED DETAILS ARE REQUIRED BY THE <br />ARCHITECTURAL PLANS, THE 5HEATHIN6 USED IN THE -FIRE <br />RATED A55EMBLIE5 SHALL BE NOMINAL 4jag," THICK, APA <br />RATED 5HEATHIN6 . 6 EXPOSURE 1 055 OR PLYWOOD PEI <br />ACCORDANCE WITH THE UL DE516N5 SPECIFIED. <br />Window � Door Allowable Wind Pre55ure5 <br />140 MPH Wind Zone Ex oSUre Bm® <br />OPENING 51ZE <br />INTERIOR ZONES <br />END ZONE5(D <br />8' Garage Door <br />+18.5 P5F/-20.q P5F <br />+18.5 P5F/-20.q P5F <br />16' Garage Door <br />+11.1 P5F/-Iq.1 P5F <br />+11.1 P5F/-Iq.1 P5F <br />10 SOFT. <br />+21.2 P5F/-22.q P5F <br />+21.4 P5F/-28.3 P5F <br />20 5QFT. <br />+20.2 P5F/-22.0 P5F <br />+20.2 P5F/-26.4 P5F <br />50 SOFT. <br />+Iq.O P5F/-20.8 P5F <br />+Iq.O P5F/-23.9 P5F <br />100 5QFT. <br />+18.0 P5F/-Iq.B P5F <br />+18.0 P5F/-22.0 P5F <br />500 SOFT. <br />+15.8 P5F/-11.6 P5F <br />+15.8 P5F/-11.6 P5F <br />(DEnd Zone is defined as the smaller of 10% of least horiz. dim. or 40% <br />of mean roof height. <br />®Pressures have been derived from 2020 FBG Table R301.2(2). <br />®Pre55ure5 charted here are allowable pressures and have been <br />reduced per A5GE 1-I6 section 2.4.1 from ultimate pre55ure5. Divide <br />allowable pre5sure5 above by a factor of 0.6 for ult. pre55ures. <br />ROOF FRAM I N6 <br />• 5EE ROOF TRU55 UPLIFT CONNECTOR SCHEDULE FOR ALL ROOF <br />TRUSS GONNEGTOR5. <br />• ROOF 5HEATHIN6 SHALL BE 1/I6" MIN. 0513/PLYWOOD 5HEATHIN6 24/16, <br />EXP05URE I. FASTEN 5HEATHIN6 TO ROOF MEMBERS w/ 2 3/8"x0.113" <br />RIN6 SHANK NAILS (R5R5-01 OR EQUIV) 0 6" O.G. AT PANEL E06E5 <br />0 6" O.G. IN FIELD. FASTEN 5HEATHIN6 TO GABLE END $ DRA6 <br />TRU55E5 w/ RIN6 SHANK NAILS 0 3" O.G. (U.N.O.). PROVIDE BLOGKIN6 <br />ALONG PANEL E06E5 AT FIRST 2 TRUSS BAYS FROM GABLE END. <br />PROVIDE "H" STYLE CLIPS ALONG UNSUPPORTED E06E5. <br />• ROOF 5HEATHIN6 FOR MAIN ROOF TRUSSES SHALL EXTEND <br />CONTINUOUSLY UNDER ALL OVERFRAMIN6. <br />• TRU55 ALL VALLEY SETS. FASTEN EACH TO TRU55 BELOW w/ <br />51MP50N VTGR CLIPS o 24" O.G. <br />• ALL METAL HAN6ER5 5HALL BE SPECIFIED BY THE TRU55 <br />MANUFACTURER, UNLE55 OTHERWISE NOTED. <br />• ERECT AND INSTALL ROOF TRU55E5 PER WTGA 4 TPI'S BG51 I <br />GUIDE TO GOOD PRACTICE FOR HANDLING, INSTALLING 8 BRAGIN6 <br />OF METAL PLATE CONNECTED WOOD TRU55E5." <br />• ROOF TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH 8 EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRIGATION OR DELIVERY. <br />• SUPPORT PORCH ✓t SHORT SPAN ROOF TRU55E5 w/ 2x4 LEDGER <br />FASTENED TO FRAMING w/(2) 3"x0.131" NAILS 0 16" O.G. <br />UPL I FT CONNECTORS <br />BEARING CONDITION <br />CONNECTOR <br />LENGTH <br />< 15' <br />51 MP50N H2.5T <br />51N6LE ROOF TRU55 BEARING ON <br />> 15' <br />51MP50N HIOA <br />WOOD STUD WALL/WOOD BEAM <br />ROOF 61RDER TRU55 BEARING ON <br />WOOD STUD WALL/WOOD BEAM <br />ALL <br />51MP50N HT520 <br />51N6LE ROOF TRUSS OR PORCH <br />ALL <br />51MP50N HETA16 <br />BEAM BEARING ON GMU WALL <br />ROOF 6.T., FLUSH BEAM OR <br />FLUSH G.T. BRG. ON GMU WALL <br />ALL <br />(2) 51MP50N HETAI6 <br />ALL BEARING POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED <br />WITH CONNECTOR AS L15TED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DE516N <br />THE UPLIFT CONNECTORS PER 5EGTION 2.2 OF AN51/TPI-2014 <br />"NATIONAL DESIGN STANDARDS FOR METAL PLATE CONNECTED WOOD <br />TRU55 CONSTRUCTION". M4K HAS ENGINEERED ALL ROOF TRU55 UPLIFT <br />CONNECTORS IN ACCORDANCE WITH THE REQUIREMENTS OF A5GE-1-I6. <br />ALL UPLIFT CONNECTORS AND LOADS PER TH15 DRAWING SHALL <br />SUPERSEDE THE TRU55 MANUFACTURER'S UPLIFT CONNECTOR <br />SPECIFICATIONS AND LOAD5 5HOWN ON THE SHOP CARDS. <br />LEGENn <br />• ® INTERIOR BEARING WALL <br />• _ _ _ BEARING WALL ABOVE <br />• BEAM / HEADER <br />• M LOCATION AND EXTENT OF 5HEARWALL <br />• I:.:::::::I EXTENT OF OVERFRAMIN6 <br />1L' _' <br />•- - - -INDICATES 1/8"A" SAW GUT CONTROL JOINT <br />INDICATES LOCATION OF REINFORCED GMU GORE <br />(5EE NOTES) <br />J L METAL HANGER <br />INDICATES P05T ABOVE. PROVIDE 50LID <br />BLOGKIN6 UNDER P05T OR JAMB ABOVE. <br />6ENERAL STRUCTURAL NOTES <br />• DE516N 15 BASED ON -Ith EDITION (2020) FLORIDA BUILDING GORE. <br />• WOOD FRAME ENGINEERING 15 BASED ON N05, "NATIONAL DESIGN <br />5PEGIFIGATION FOR WOOD CONSTRUCTION" - LATEST EDITION. <br />• DE516N LOA05: <br />ROOF LIVE = 20 P5F <br />DEAD = 1 P5F T.G., 10 P5F B.G. <br />LOAD DURATION FACTOR = 1.25 <br />FLOOR LIVE = 40 P5F (INGLUDIN6 STAIRS d DEGK5) <br />= 30 P5F ® SLEEPING AREAS <br />= 50 P5F ® GARAGE <br />= 200 # POINT LOAD ® GUARDS/HANDRAILS <br />= 50 P5F @ GUARD IN -FILL COMPONENTS <br />DEAD = 10 P5F (20 P5F TOTAL ® TILE) <br />WIND ULTIMATE WIND SPEED 8 EXPO50RE A5 LISTED <br />R15K GATE6ORY II <br />6ENERAL FRAMING <br />• EXTERIOR WOOD STUD BEARING WALLS SHALL BE 2x 5PF#2 OR <br />5YP#2 0 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• INTERIOR WOOD STUD BEARING WALLS SHALL BE 2x 5PF OR 5YP <br />'STUD' GRADE LUMBER o I6" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• ALL INTERIOR 5HEARWALL5 SHALL BE GON5TRUGTED WITH 2x <br />'STUD' GRADE MEMBERS 5PAGED o 16" O.G. (MAX.). <br />• ALL NON -BEARING INTERIOR STUD WALLS SHALL BE GON5TRUGTED <br />WITH 2x '5TUD' GRADE MEMBERS SPACED a 24" O.G. (MAX.). <br />• ALL HEADERS SHALL BE SUPPORTED BY (1)2x JACK STUD d (1)2x <br />KING STUD, MINIMUM. <br />- THE NUMBER OF STUDS SPECIFIED AT A SUPPORT INDICATES THE <br />NUMBER OF JACK STUDS REQUIRED, U.N.O.. <br />• ALL HEADERS, BEAMS 4 OTHER STRUCTURAL MEMBERS SHALL BE <br />5PRUGE-PINE-FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR <br />BETTER (KILN -DRIED). <br />• FACE NAIL MULTI -PLY 2x BEAMS 4 HEADERS W/ 3-ROW5 OF 3"4.131" <br />NAILS 0 12" O.G. STAGGERED. APPLY NAILING FROM BOTH FACES <br />3-PLY OR MORE CONDITIONS. UTILIZE 2 ROW5 OF NAILS FOR 2x6 ✓E <br />2x8 MEMBERS. <br />• FACE NAIL BUILT UP 2x POSTS W/ 3"0.131" NAILS o 16" O.G. <br />5TA66ERED. APPLY NAILING FROM BOTH FACES o 3-PLY OR <br />MORE CONDITIONS. <br />• REFER TO CONNECTION SPECIFICATIONS TABLE FOR ALL <br />CONNECTIONS (TYP. U.N.O. ON PLANS). <br />• SHEATH ALL WOOD FRAMED EXTERIOR WALLS w/ 1/I6" 055 <br />FASTENED w/ 2Y2"x0.131" NAILS ® 6" O.G. ® E1?6E5 s 12" O.G. <br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOGKIN6 AT ALL <br />UNSUPPORTED PANEL E06E5. TYPICAL U.N.O. ON THE PLANS. <br />• PROVIDE SOLID BLOGKIN6 IN FLOOR SYSTEM UNDER ALL P05T5 <br />CONTINUOUS TO FOUNOATION/BEARIN6. <br />• ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING: <br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55x10A6 psi <br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10"6 psi <br />• FOR 2 4 3 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES TOGETHER <br />WITH 3 ROW5 OF 3"x0.131" NAILS o 8" O/G OR 2 ROW5 Y4"x3Y2" <br />51MP50N 505 5GREW5 (OR 5Y2" TRU55LOK 5GREW5) A 16" O/G. USE <br />A MINIMUM OF 3 ROW5 FOR BEAM DEPTHS OF 14" OR GREATER. <br />APPLY FASTENING AT BOTH FACES FOR 3-PLY CONDITION. LOCATE <br />TOP 4 BOTTOM NAIL5/5GREW5 2" FROM EDGE. SOLID 3Y2" OR 5Y4" <br />BEAMS ARE ACCEPTABLE. USE 2 ROW5 OF NAILS FOR 2x6 4 2x8 <br />MEMBERS. <br />• FOR 4 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES TOGETHER <br />WITH 3 ROW5 OFY4"xb" 51MP50N 5D5 5GREW5 (OR 6 3/4" TRU55LOK <br />5GREW5) o 16" O/G. USE A MINIMUM OF 4 ROW5 FOR BEAM DEPTHS <br />OF 14" OR GREATER. APPLY FA5TENIN6 AT BOTH FACES (ONE 510E <br />ONLY FOR TRU55LOK 5GREW5). LOCATE TOP AND BOTTOM 5GREW5 <br />2" FROM EDGE. A 50LID 1" BEAM 15 ACCEPTABLE. <br />• ALL INTERIOR WALL 5TUD5 IN CONTACT w/ GMU WALLS SHALL BE <br />PRESERVATIVE TREATED AND FASTENED w/Y4" DIA. X 4" LONG <br />TAPGON5 o 24" O.G. <br />FLOOR FRAM I N6 <br />• I-JO15T5/TRU55E5 SHALL BE OE516NED BY MANUR TO MEET OR <br />EXCEED L/480 LIVE LOAD DEFLECTION CRITERIA. <br />• ALL METAL HANGERS SHALL BE SPECIFIED BY I-JO15T /TRU55 <br />MANUFACTURER, UNLE55 OTHERWISE NOTED. <br />• 1 -JO I 5T/TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH. d ENG. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRIGATION OR DELIVERY <br />• FLOOR 5HEATHIN6 SHALL BE 23/32" GONFORMIN6 TO P52-04, <br />24" O.G., EXPO50RE I, TONGUE AND GROOVE E06E5, FASTEN <br />5HEATHIN6 TO FRAMING MEMBERS W/ GLUE AND 3"xO.131" NAILS <br />6" O.G. AT PANEL E06E5 d 12" O.G. AT INTERMEDIATE SUPPORTS. <br />TYPIGAL 5TAIR GON5TRUGTION NOTE5 <br />• (3) SINGLE PLY 2x12 5TRIN6ER5 FASTENED TO HEADER AT TOP OR <br />LANDING, WHERE APPLICABLE, AND 2xb P.T. PLATE AT BOTTOM w/ <br />(1) 51MP50N A35 CLIP AT EACH 5TRIN6ER. <br />• FASTEN 2xb P.T. PLATE TO CONCRETE 5LA13 w/ (3) %" DIA. x 3 Y2" <br />LONG TAPGON5. <br />• FASTEN END 5TRIN6ER5 TO ADJACENT WALLS w/ (2) 3"4.131" NAILS <br />AT EACH STUD, WHERE APPLICABLE. <br />• PROVIDE 3/4" FLOOR DEGKIN6 ON R15ER5 AND I" FLOOR DEGKIN6 <br />ON TREADS. <br />• SEE STAIR FRAMING SECTION FOR MORE INFO. <br />N <br />a <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />drawn by: <br />issue date: <br />JSB <br />DJ R <br />01-14-22 <br />REVISIONS: <br />date: initial: <br />sheet: <br />.aim <br />SM0.0 <br />d <br />0 <br />J <br />LL <br />jly�►-i -i al f iiE:.j r� ' �C ;• <br />.-��..._ - -•- --- - - .... n. .t .fift:::w�� ;�iS:v':f.:�. a ,.._ ...a.;.. _.. ... r��ai, _ . .ii. t:S _ .'.#:� ! , J ,.c.::•,. . � �'`��r���ir� ,. i.� .... ... � <br />