My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Zephyr Plaza - Vanilla Shell Restaurant
Zephyrhills
>
Building Department
>
Building Plans
>
Zephyr Plaza - Vanilla Shell Restaurant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 5:27:16 AM
Creation date
2/28/2025 8:26:29 AM
Metadata
Fields
Template:
Building Plans
Location
Zephyr Plaza
Contractor
Venture Construction
Building Plans - Permit #
19240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i19,111 I��If ���m�' �VII�1FIRI��'I�N�IFI�N1NICI►N�I�I��IRIIn���itug9'�I�I�N�II� 1�t11111�111 <br />E_22" L.'-11/2______ <br />T.O. PARAPET <br />E_20" L. '-1 1/2_ _ _ _ _ <br />T.O. PARAPET _ <br />E_L.4'-0" <br />T.O. WAINSCOT <br />E—L. 22'-1 1 /2" _ <br />T.O. PARAPET --._._._._._._._._._._...._._._ <br />E—L. 16'-0" _ <br />T.O. PARAPET <br />EL. 4-0" <br />T.Q. WAINSCOT _ <br />22 <br />10 <br />0 <br />A5.0 / / `= <br />10 <br />MISCELLANEOUS <br />A. SEE SHT A1.1 "WINDOW TYPES" FOR WINDOW ELEVATIONS <br />1 <br />SEALERS (REFER TO SPECS): <br />A. SEALANT AT ALL WALL AND ROOF PENETRATIONS. <br />B. SEALANT AT ALL WINDOW AND DOOR FRAMES AT HEAD AND JAMB. DO NOT SEAL SILL @ <br />WINDOWS. <br />C. APPLY NEOPRENE GASKET (CONT.) BETWEEN BUILDING & CANOPY. <br />"CRITICAL" DIMENSIONS: <br />A. REQUIRED CLEAR OPENING WIDTH TO ENSURE COORDINATION WITH STANDARD <br />SIGNAGE/ BUILDING ELEMENTS DIMENSIONS. <br />NOTE: NO EXTERIOR SIGNS ARE WITHIN THE SCOPE OF WORK COVERED BY THE BUILDING <br />PERMIT APPLICATION. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />COORDINATING THE INSTALLATION OF ALL EXTERIOR SIGNS AND INSTALLATION OF <br />REQUIRED BLOCKING AND ELECTRICAL CONNECTIONS FOR FINAL APPROVED SIGNS. <br />KEY NOTES <br />22 <br />10 <br />VA <br />a <br />22 <br />LOGO <br />SIGN <br />m17::1 <br />IP <br />24 <br />1O FUTURE BUILDING SIGN, BY VENDOR.Q <br />O WALK UP WINDOW. SEE SHEET A1.0. <br />O DASHED LINE INDICATES ROOF BEYOND. Q <br />® STOREFRONT, TYPICAL. SEE SHEETS A1.0 AND Al.i. <br />Q SWITCH GEAR. PAINT TO MATCH WALL. <br />© BERRIDGE S-DECK METAL ROOFING, BLACK. 0 <br />O GOOSENECK LAMP SEE ELECTRICAL PLANS Q <br />8 LOCATION OF EXTERIOR GRADE INSTANTANEOUS WATER HEATERS TO BE <br />INSTALLED IN PHASE II. <br />Q SECURITY DOOR SEE SHEET Al. 1. <br />10 GALV. METAL PARAPET COPING. PAINT IN FIELD. <br />11 NOT USED. <br />1 <br />12 GAS SERVICE, <br />13 WALL SHALL BE FINISHED PRIOR TO INSTALLATION OF SWITCHGEAR. <br />14 MASONRY CONTROL JOINT. <br />15 WALL PACK LIGHT FIXTUR . SEE ELECTRICAL PLANS. <br />16 STOREFRONT DOOR. REFER TO DOOR SCHEDULE, SEE SHEET Al. 1. <br />FO <br />COOLER/FREEZER COMBO PROVIDED BY OWNER AND INSTALLED B <br />Al <br />K LOCATION. SEE SHEET A1.0 AND PLUMBING PLANS. <br />CED CMU. PROVIDE PRICING AND COLOR OPTIONS FOR INTEGRALBLOCK, SEALED, AND FOR TYPICAL SPLIT -FACE CMU PAINTED WITH <br />ERIC PAINT, OWNER SELECTED COLOR. PRICING FOR NATURAL COLORED CULTURED STONE OVER SMOOTH <br />MU. <br />22 <br />20 <br />...... ...... ...... _. EL. 20'-11/2" <br />T.O. PARAPET <br />_ EL. 16-0" _ <br />T.O. PARAPET <br />RIGHT SIDE ELEVATION 1/4"=1'-o" A <br />E_L.6'-0" _ <br />T.O. WAINSCOT <br />KEY NOTES <br />21 STO POWERWALL STUCCO OVER PLYWOOD OVER 2x4 STUD FURRING AT 16" <br />O.C., OVER 8" SMOOTH FACED CMU. <br />22 STUCCO OVER EIFS CORNICE. <br />23 STO POWERWALL STUCCO OVER 6" WIDE FOAM BUILDOUT. (FINISH DIMENSION). <br />24 STO POWERWALL STUCCO OVER 8" SMOOTH FACED CMU. <br />25 .BLACK FACED BERMETAL �OVER�ALUMI�NUM RIDGE ROOFINGAWNINRAME <br />SUPPLIED I G.C. <br />26 TOWER BEYOND. <br />27 PROPOSED "YOU ARE HERE" ARTWORK. DESIGN NOT YET FINALIZED. <br />IROOF DRAIN OVERFLOW. PROVIDE BRASS LAMBS TONGUE FIXTURE. INSTALLAT 13'-0". <br />ABUT STONE TO WALK-IN UNIT. <br />GUTTERS AND DOWNSPOUT. PAINT IN FIELD. <br />KEY NOTES <br />❑0 <br />(i <br />z <br />z <br />I:t <br />0) <br />c� <br />o <br />CD <br />2: <br />W <br />_�y <br />A ~ <br />DLo <br />�� <br />LLJ <br />PhiU1"c�Z <br />c/) <br />cn(joI'`w <br />co <br />VwU) <br />W�Y <br />DF- <br />F— <br />W <br />C� <br />Vzo00= <br />N'S <br />U <br />N <br />Q <br />U) <br />LU <br />U) <br />D <br />m <br />�Q <br />a <br />1Q REVISION 1 11.13.2017 <br />0 <br />A <br />A <br />CONTRACT DATE: <br />BUILDING TYPE: <br />PLAN VERSION: <br />SITE NUMBER: <br />STORE NUMBER: <br />08.13.2017 <br />ONE-OFF <br />Restaurant Shell <br />Zephyr Plaza <br />ZEPHYRHILLS, FL <br />PHASE 1 <br />EXTERIOR <br />ELEVATIONS <br />A4.0 <br />PLOT DATE: Jan 03, 2018-10:26am <br />IRI <br />
The URL can be used to link to this page
Your browser does not support the video tag.