Laserfiche WebLink
Y <br />C. <br />D. <br />E. <br />GYPSUM BOARD CEILING: <br />A. NO CEILINGS INSTALLED IN PHASE I. <br />B. <br />ELECTRICAL: <br />A. SEE ELECT. DWGS. FOR PHASE I LIGHTING. <br />1 /4" = 1'-011 <br />3E II DOOR. SEE <br />0 ROOF HATCH AND LADDER. SEE 7/A6.0. <br />CMU LINTEL AT 8'-8". SEE STRUCTURAL. <br />Q 4" ROOF DRAIN PIPING TO UNDERGROUND STORM PIPING. REFER TO CIVIL PLANS <br />WALK-IN COOLER/ FREEZER CEILING BY MANUFACTURER <br />NO CEILINGS TO BE INSTALLED IN PHASE I. <br />10 ELECTRICAL SWITCH GEAR LOCATION 0 <br />11 ELECTICAL PANEL LOCATION <br />12 SEE SHEET A1.1 FOR DOOR�WIDOW HEIGHTS. <br />EXTERIOR GOOSENECK LIGHTING—FO BE -SUPPLIED AND INSTALLED BY GENERAL <br />13 CONTRACTOR FOR PHASE 1. PROVIDE ANP LIGHTING A810-41-E6-41, OR OTHER <br />APPROVED EQUAL. <br />.t <br />U <br />� <br />n <br />TT� <br />VJ <br />O <br />V1 <br />rr <br />N <br />Lo <br />LL^^11 <br />C\J <br />i Ur,,cy) <br />C/)�Pw <br />c/) <br />z <br />U) <br />U�U"'U <br />W U <br />:D <br />t i-- <br />LLj <br />c) <br />N� <br />U <br />Q <br />'Zi- <br />N <br />cn <br />ui <br />C75 <br />D <br />m <br />•1 e <br />1� REVISION 1 11.13.2017 <br />2� REVISION 2 11.16.2017 <br />A <br />A <br />A <br />A <br />CONTRACT DATE: 08.13.2017 <br />BUILDING TYPE: ONE-OFF <br />PLAN VERSION: <br />SITE NUMBER: <br />STORE NUMBER: <br />Restaurant Shell <br />Zephyr Plaza <br />ZEPHYRHILLS, FL <br />REFLECTED <br />CEILING <br />PLAN <br />7ml <br />REFLECTED CEILING PLAN NOTES <br />D] KEY NOTES B PLOT DATE: Jan 03, 2018-10:26am <br />