ik i lil d� ,.1.,.. , _ .. .lY: .,_. . I. i_._ :. ..... _ .__ .��Jtl� .. .13�1.{� JLV.JUL ._ � .: �.. l� � - , _.�.� I�I�i� �.��
<br />��IIIIIi1��1,16Yui+�Ildl�u94�III�INVIdY11dJIlWIWdl811�9�'ILIII�IIIWV�I.dIIiIIUd�ViYuwll►tdl�Lll�_����I._ _.IY�LL�.� I ILIA YI�d�WIIJV�W d�G�NktdllYtlJ��li�„ll<,1�� _,.:..��,.V•.,�I.tLWiVuIl.rl�...��J.11 J ,Ld � � uY, 1..Ih 161J l �i .11, : ._,,I:IL .11�..1ilWllli�.�l�..�a.l. i.� 11....IL.:_ l .. LJ1 ���.1,111.t11�1� �L---lc�. _J �II:�L��a. .�. I >II flUIl11YLL !� �Y �U� I D_��11Wlll� ��W.W1h�14�u411ifIIWuIW6LilLuLWl�u1���..L _..1. _ _.; L.....W.,�IILI�.dIILI •-=--�-- WJI�ill..,L.i�,�y.�--. - S- 111W1�I�1�,laE!,J11:�
<br />MECHANICAL GENERAL NOTES:
<br />1. COORDINATE LOCATIONS WHERE NEW DUCTWORK CROSSES EXISTING CONDUITS, ETC. PROVIDE OFFSETS AS
<br />REQUIRED.
<br />2. INSTALL FIRE DAMPERS AS REQUIRED WHENEVER NEW OR EXISTING DUCTWORK PASSES THROUGH FIRE
<br />REATED WALLS OR FLOORS. RETURN AIR OPENING IN FIRE RATED WALLS SHALL BE EQUIPPED WITH FIRE
<br />DAMPERS. SEE ARCH. DRAWINGS FOR RATED WALLS.
<br />3. CONTRACTOR TO VERIFY FIELD CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY ENGINEER WITH ANY
<br />DISCREPANCIES BETWEEN DRAWINGS AND EXISTING CONDITIONS
<br />4. COORDINATE EXACT LOCATIONS OF EQUIPMENT ON ROOF. PROVIDE DUCTED OUTSIDE AIR INTAKE DUCTS TO
<br />MAINTAIN 10'-0 CLEARANCE FROM EXHAUST OR FLUE DISCHARGE OPENINGS
<br />5. NEW KITCHEN HOODS, EXHAUST FANS AND MAKE UP AIR UNIT BY KITCHEN EQUIPMENT SUPPLIER, VERIFY
<br />REQUIREMENTS AND PROVIDE GAS, ELECTRICAL CONNECTIONS AS REQUIRED. EXHAUST DUCT TO BE
<br />STAINLESS OR BLACK STEEL, ZERO CLEARANCE TO COMBUSTABLE, INSULATED WRAP. HOOD SHALL BE
<br />EQUIPPED WITH AN ANSUL FIRE SUPRESSION SYSTEM. MINIMUM AIR VELOCITY IN EXHAUST DUCTWORK SHALL
<br />BE A MINIMUM OF 1500 FPM
<br />6. COORDINATE ALL WORK WITH ALL OTHER TRADES, RESOLVE CONFLICT PRIOR TO INSTALLATION OF EQUIPMENT.
<br />COORDINATE NEW DIFFUSER LOCATIONS WITH LIGHT FIXTURES, SPRINKLER HEADS AND PIPING, CEILING GRID
<br />LOCATION PRIOR TO INSTALLATION.
<br />7. ALL NEW HVAC EQUIPMENT INCLUDING FANS, RTU AND MUA SHALL BE PROPERLY SUPPORTED FROM THE
<br />STRUCTURE. MOUNT ALL ROOFTOP UNITS ON CURBS. PROVIDE VIBRATION ISOLATORS ON ALL EQUIPMENT. ALL
<br />EQUIPMENT SHALL BE APPROVED FOR ITS SPECIFIC INTENDED INSTALLATION AND OPERATION.
<br />8. DIFFUSER PER SCHEDULE. EACH SHALL BE PROVIDED WITH BALANCING DEVICE AT DIFFUSER RUNOUT WHERE
<br />POSSIBLE AND DEVICE FACE -MOUNTED DAMPER OTHERWISE.
<br />9. THERMOSTATS FOR NEW RTU'S SHALL BE PROGRAMMABLE STYLE BY HONEYWELL. SUBMIT SHOP DRAWINGS
<br />AND VERIFY MODEL NUMBER PRIOR TO PURCHASE. THERMOSTATS MOUNTED AT 42" AFF
<br />10. PROVIDE ROOF TOP AIR HANDLING UNIT AS INDICATED ON DRAWINGS. VERIFY EXACT LOCATION WITH ROOF
<br />PLAN AND STRUCTURAL DRAWINGS. PROVIDE GAS PIPING CONNECTION AND COORDINATE ELECTRICAL
<br />CONNECTION. MOUNT ALL UNITS ON 14" ROOF CURB. ROOF CURBS ABOVE OR A SINGLE FLOOR ABOVE MUSIC
<br />INSTRUCTION OR ASSEMBLY AREAS SHALL BE PROVIDED WITH VIBRATION ISOLATION ROOF CURBS.
<br />11. PROVIDE NEW GAS SERVICE FROM NEW METER UP TO RTU'S AND EQUIPMENT GAS PIPING TO BE SCHEDULE 40
<br />BLACK STEEL. PROVIDE METER AND PIPING CONNECTION TO ALL AHU'S DUCT FURNACES, HOT WATER HEATER,
<br />MAKE UP AIR UNITS AND KITCHEN COOKING EQUIPMENT. GAS PIPING FOR KITCHEN COOKING EQUIPMENT TO BE
<br />EQUIPPED WITH A SOLENOID SHUT-OFF VALVES CONNECTED TO HOOD FIRE SUPPRESSION SYSTEM DUCTWORK
<br />FOR GRILL HOOD (TYPE 1) SHALL BE WELDED 16 GAGE BLACK IRON, OR STAINLESS STEEL.
<br />12. MAKE UP AIR UNITS AND ROOFTOP UNIT FANS AND OUTDOOR AIR DAMPERS SHALL BE INTERLOCKED WITH
<br />EXHAUST FANS.
<br />13. TYPE I EXHAUST FAN TO TERMINATE AT A MINIMUM 40 ABOVE ROOF. PROVIDE FAN WITH 24" METAL ROOF CURB
<br />OR WITH HEIGHT SUFFICIENT FOR 18" CLEARANCE FROM ROOF FLASHING TO FAN BASE.
<br />14. ALL MECHANICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCALLY ADOPTED MECHANICAL CODE
<br />WITH ALL CURRENTLY APPLICABLE ERRATA AND AMENDMENTS.
<br />15. CONTRACTOR SHALL COORDINATE MECHANICAL WORK WITH ALL OTHER TRADES PRIOR TO FABRICATION AND
<br />INSTALLATION. DO NOT SCALE FROM DRAWINGS FOR ANY EXACT DIMENSION. SEE ARCHITECTURAL DRAWINGS
<br />AND REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF DOORS, WINDOWS, AIR DISTRIBUTION DEVICES.
<br />16. COORDINATE THE SIZE OF ALL WALL OPENINGS, ROOF OPENINGS AND EQUIPMENT PADS WITH ACTUAL
<br />EQUIPMENT PURCHASED. ALL MECHANICAL ITEMS EXTENDING THRU WALL & ROOF SHALL BE FLASHED AND
<br />COUNTER FLASHED. ALL ROOF CURBS FOR MECHANICAL EQUIPMENT SHALL BE BY MECHANICAL CONTRACTOR.
<br />17. ROUTE FULL SIZE CONDENSATE DRAINS WITH P-TRAP AND VENT ON OUTLET SIDE. PIPE 12" AWAY FROM UNIT.
<br />SPILL ON CONCRETE SPLASH BLOCK WHERE ROUTED TO ROOF.
<br />18. DUCT SMOKE DETECTORS IN SUPPLIES AND RETURNS PER LOCALLY ADOPTED CODE SHALL BE FURNISHED &
<br />WIRED BY DIV 16, INSTALLED BY DIV. 15.
<br />19. ALL DUCTWORK SIZES ARE INSIDE CLEAR FREE AREA. INCREASE SIZE WHERE REQUIRED TO INCLUDE INTERNAL
<br />INSUALTION
<br />20. MOTOR STARTERS AND DISCONNECTS SHALL BE FURNISHED UNDER DIVISION 15 AND INSTALLED BY THE
<br />ELECTRICAL CONTRACTOR. COORDINATE ELECTRICAL CHARACTERISTICS OF HVAC EQUIPMENT AND CONTROL
<br />SYSTEM REQUIREMENTS (VOLTAGE/PHASE, SIGNAL TYPE, AUXILIARY CONTACTS ETCO ) PRIOR TO PURCHASING.
<br />21. CONTRACTOR SHALL NOTE THAT THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT INDICATE ALL
<br />OFFSETS, TRANSITIONS, OR OTHER APPURTENANCES REQUIRED FOR A COMPLETE HVAC SYSTEM. PROVIDE ALL
<br />EQUIPMENT NECESSARY FOR A COMPLETE SYSTEM.
<br />22. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONTROL ITEMS NECESSARY FOR THE HEATING AND COOLING
<br />FUNCTIONS OF THE AHU AND MAU. THE AHU THERMOSTAT LAYOUT IS THE HONEYWELLT6590 FAN COIL
<br />CONTROLLED. THE MAU SHALL BE PROVIDED WITH ADJUSTABLE DISCHARGE AIR CONTROL WITH DISCHARGE AIR
<br />SENSOR AND MODULATING CONTROL VALVE.
<br />23. ALL PIPING AND DUCTWORK SHALL RUN CONTINUOUSLY THROUGH FLOORS, ROOFS AND PARTITIONS. ENGINEER
<br />WILL REVIEW DUCT/PIPING SHOP DRAWINGS AT THE REQUEST OF THE CONTRACTOR. NO EXHAUST HOOD SHALL
<br />BE LEFT OPEN INTO BUILDING SPACE.
<br />24. THIS CONTRACTOR SHALL PROVIDE & INSTALL ALL MISCELLANEOUS STEEL AS REQUIRED FOR INSTALLATION OF
<br />ALL MECHANICAL ITEMS.
<br />25. ALL DIFFUSERS LOCATED IN CEILINGS WITH A NON -RETURN AIR PLENUM SHALL BE INSULATED AIR TIGHT WITH
<br />FOIL FACES 1 INCH FIBERGLASS INSULATION.
<br />26. CONTRACTOR SHALL PURCHASE AIR FILTERS FROM THE OWNER -APPROVED AIR FILTER VENDOR WHERE OWNER
<br />HAS A SUPPLIER. ALL FILTERS SHALL BE REPLACED IMMEDIATELY PRIOR TO SUBSTANTIAL COMPLETION.
<br />27. CONTRACTOR SHALL SUBMIT THE TAB AGENCY, 2 WEEKS PRIOR TO SCHEDULE TESTING AND BALANCING OF THE
<br />SYSTEM, AN UP-TO-DATE SET OF HVAC DRAWINGS, AND RELATED PRODUCT DATASUBMITTALS SUCH AS HVAC
<br />UNITS, FANS, DIFFUSERS, and CONTROL DIAGRAMS.
<br />28. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT
<br />IS INTENDED THAT A COMPLETE MECHANICAL SYSTEM IS PROVIDED WITH ALL NECESSARY EQUIPMENT AND
<br />CONTROLS.
<br />29. REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL SYSTEM REQUIREMENTS.
<br />30. TESTING AND BALANCE: CONTRACTOR SHALL CONTRACT AN INDEPENDENT TESTING AND BALANCING COMPANY
<br />TO TEST THE EQUIPMENT AND ADJUST THE HVAC SYSTEM TO OBTAIN THE DESIGN AIR FLOWS AS SHOWN ON
<br />PLANS. THE TAB AGENCY SHALL BE NEBB CERTIFIED AND SHALL SUBMIT TAB REPORT AS REQUIRED BY THE
<br />NEBB.
<br />31. ALL SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK SHALL BE INSULATED. DUCT LINER SHALL BE 1-1/2"
<br />ELASTOMERIC RUBBER (ARMAFLEX OR EQ.); EXTERNAL INSULATION SHALL BE 2" THICK, 1 LB.CU.FT. DENSITY,
<br />FIBERGLASS TYPE, FOIL -FACED DUCT WRAP, COMMERCIAL GRADE. ALL EXPOSED DUCTWORK SHALL BE LINED.
<br />R-VALUE SHALL BE ADJUSTED PER LOCAL ENERGY CODE REQUIREMENTS. EXPOSED DUCT SHALL BE PROVIDED
<br />WITH APINT GRIP FINISH.
<br />32. PROVIDE PVC WATER HEATER "CONCENTRIC TYPE THRU THE ROOF ARRANGEMENT" VENTING ASSEMBLY FOR
<br />FRESH AIR INTAKE AND EXHAUST AS RECOMMENDED BY MANUFACTURER.
<br />33. DUCTWORK SHALL BE GALVANIZED STEEL FABRICATED PER SMACNA STANDARDS. VOLUME DAMPERS SHALL BE
<br />INSTALLED AT ALL DUCT BRANCHES AND DIFFUSER TAKE OFFS TO BE ABLE TO BALANCE THE AIR SYSTEM. DUCT
<br />SHALL BE HUNG WITH 1" WIDE DUCT STRAPS.
<br />34. EACH AC UNIT SHALL BE CONTROLLED WITH A WALL MOUNTED 7-DAY PROGRAMMABLE THERMOSTAT WITH AUTO
<br />CHANGE OVER TO PROVIDE OCCUPIED/UNOCCUPIED MODES OF OPERATION. PROVIDE CLEAR PLASTIC COVER
<br />WITH LOCKING KEY ALL THERMOSTATS.
<br />35. ALL UNIT HEATER TO HAVE, INTERNAL DISCONNECT, MAGNETIC OVERLOAD PROTECTION; INTEGRAL TSTAT AND
<br />24 V CONTROL TRANSFORMER.
<br />36. ALL PIPING SHALL BE INSULATED COMPLETELY AIR TIGHT WITH NO EXPOSED INSULATION MATERIAL. PROVIDE
<br />INSULATION OUTSIDE OF PIPING HANGERS OR SUPPORTS WITH RIGID INSULATION AND PIPING SADDLES AT
<br />SUPPORTS SUFFIECIENT TO PREVENT DEFORMATION OF INSULATION.
<br />37. PROVIDE SIESMIC FITTINGS AND SUPPORTS AS REQUIRED BY THE LOCAL BUILDING CODE AND SIESMIC
<br />CHARACTERISTICS FOR THE CONSTRUCTION LOCATION.
<br />38. ALL COOLING UNITS SHALL BE PROVIDED WITH DRAIN PANS AND FLOAT SIWTCHES TO PREVENT UNIT
<br />OPERATION WHERE CONDENSATE DRAINAGE CAN BE UNEXPECTEDLY INHIBITED. NO EQUIPMENT SHALL SIT
<br />DIRECTLY IN A DRAIN PAN.
<br />SUPPLY SUPPLY
<br />RETURN/EXHAUST RETURN/EXHAUST
<br />45°
<br />VD
<br />SUPPL RETURN/EXHAUST
<br />DUCT BRANCH DETAIL
<br />STEEL WIRE TO STRUCTURE
<br />SPIN -IN FITTING WITH
<br />VOLUME DAMPER
<br />METAL DUCT
<br />FOR SIZE SEE
<br />PLAN
<br />AIR SCOOP
<br />(SUPPLY
<br />WNLY)
<br />LOCKING QUADRANT
<br />DEVICE NECK SIZE TO MATCH RUN OUT
<br />SUPPORT STRAP
<br />INSULATED
<br />FLEX DUCT
<br />HANGER (TYP.)
<br />INSULATED SUPPLY ADAPTER/PLENUM
<br />T-BAR FRAME (TYP.)- PROVIDE METAL
<br />FRAME AT GYP INS ALLTIONS
<br />CEILING
<br />AIR DEVICE SCHEDULE
<br />_
<br />DESIGN
<br />MARK
<br />LAYOUT BASIS
<br />TYPE
<br />FACE SIZE
<br />MOUNTING
<br />FINISH
<br />MATERIAL
<br />NOTES
<br />S-1
<br />TITUS TMS
<br />CEILING DIFFUSER
<br />24X24/12X12
<br />2x2 T-BAR
<br />WHITE
<br />STEEL
<br />1,4
<br />S-2
<br />TITUS PAR
<br />PATTERNLESS PERF GRILLE
<br />24X24/
<br />2x2 T-BAR
<br />WHITE
<br />STEEL
<br />1,4
<br />R-1
<br />TITUS 50 F
<br />1/2" EG GCRATE RETURN
<br />24X24
<br />2X2 T-BAR
<br />WHITE
<br />ALUMINUM
<br />2
<br />NOTES
<br />1
<br />. NECK SIZE TO MATCH DUCT RUN OUT SIZE AS SHOWN ON MECHANICAL PLANS.
<br />2
<br />.PROVIDE MANUFACTURER'S ACCESSORY INSULATED PLENUM WITH ITN OUT SIZED CONNECTION.
<br />3
<br />4
<br />.BALANCING DEVICE AT AIR DEVICE FACE
<br />.BALANCING DEVICE AT RUN OUT TAKEOFF
<br />5
<br />.DIVERT BLADES TO 45 DEGREE LATERALLY AND 35 DEGREES BELOW HORIZONTAL.
<br />6
<br />.3-WAY DIFFUSER _-�
<br />_
<br />END
<br />ABREVI A T10 S
<br />AC
<br />ABOVE CEILING
<br />HR
<br />HOUR
<br />ACC
<br />ACCESS
<br />HW
<br />HOT WATER
<br />ACU
<br />AIR CONDITIONING UNIT
<br />HZ
<br />HERTZ_
<br />AFF
<br />ABOVE FIN ISHED FLOOR
<br />IE
<br />INVERT ELEVATION
<br />AHU
<br />AIR HANDLING UNIT
<br />LAT
<br />LEAVING AIR TEMPERATURE
<br />AP
<br />ACCESS PANEL
<br />LBS
<br />POUNDS
<br />ARCH
<br />ARCHITECT
<br />LOB
<br />LEAVING DRY BULB
<br />BDD
<br />BACKDRAFT DAMPER
<br />LWB
<br />LEAVING WET BULB
<br />BTUH
<br />BTU PER HOUR
<br />LWT
<br />LEAVING WATER TEMP,
<br />GC
<br />COOLING COIL
<br />MAX
<br />MAXIMUM
<br />CCP
<br />CENTRAL CONTROL PANEL
<br />MBH
<br />THOUSAND BTU PER HOUR
<br />CD
<br />CEILIRIG DIFFUSER
<br />EVAP
<br />EVAPORATOR
<br />CFM
<br />CUBIC FEET PER MINUTE
<br />MIN
<br />MINIMUM
<br />CG
<br />CEILING GRID
<br />MOD
<br />_
<br />MOTORIZED DAMPER
<br />CONC.
<br />CONCRETE
<br />MTD
<br />MOUNTED
<br />CR
<br />CEILING REGISTER
<br />N,C.
<br />MORMALLY CLOSED
<br />CV
<br />CONTROL VALVE
<br />NIC
<br />NOT IN CONTRACT
<br />D
<br />DROP
<br />N.O,
<br />NORMALLY OPENED
<br />DB
<br />_
<br />DRY BULB
<br />NO.
<br />NUMBER
<br />DIA.
<br />DIAMETER
<br />NPSH
<br />NET POSITIVE St.JCTION HEAD
<br />DN
<br />DOWN
<br />NITS
<br />NOT TO SCALES
<br />DWG
<br />DRAWING
<br />OA
<br />OUTSIDE AIR
<br />EA
<br />EXHAUST AIR
<br />OD
<br />OUTSIDE DIAMETER
<br />EAT
<br />ENTERING AIR TEMP
<br />OS&Y
<br />OUTSIDE SCREW AND YOKE
<br />EDB
<br />ENTERING DRY BULB
<br />PD
<br />PRESSURE DROP
<br />EF
<br />EXHAUST FAN
<br />PSI
<br />POUNDS PER SQUARE INCH
<br />ELEV
<br />ELEVATION
<br />RA
<br />RETURN AIR
<br />ELEC
<br />ELECTRIC
<br />RM
<br />ROOM
<br />EWB
<br />ENTERING WET BULB
<br />RPM
<br />REVOLUTION PER MINUTE
<br />EWT
<br />ENTERING WATER TEMP
<br />SD
<br />SMOKE DAMPER
<br />ESP
<br />EXTERNAL STATIC PRESSUP
<br />SF
<br />SUPPLY FAN
<br />SP
<br />STATIC PRESSURE
<br />SF
<br />SUPPLY FAN
<br />EXH
<br />EXHAUST
<br />SP
<br />STATIC PRESSURE
<br />EXT
<br />EXTERNAL
<br />SPEC
<br />SPECIFICATIONS
<br />F
<br />DEGREES FAHRENHET
<br />SR
<br />SUPPLY REGISTER
<br />FC
<br />FLEXIBLE CONNECTION
<br />SS
<br />STAINLESS STEEL
<br />FCU
<br />FAN COIL UNIT
<br />TDH
<br />TOTAL_ DYNAMIC HEAD
<br />FD
<br />FIRE DAMPER
<br />TEMP
<br />TEMPERATURE
<br />AFG
<br />ABOVE FINISHED GRADE
<br />TG
<br />TRANSFER GRILLE
<br />FLD
<br />FLOOR DRAIN
<br />TV
<br />TURNING VANES
<br />FPI
<br />FINS PER INCH
<br />TYP.
<br />TYPICAL
<br />FPM
<br />FEET PER MINUTE
<br />UH
<br />UNIT HEATER
<br />FT
<br />FEET
<br />UC
<br />3/4" UNDERCUT
<br />GV
<br />GATE VALVE
<br />V
<br />VOLTS
<br />G
<br />GAUGE
<br />VAV
<br />VARIABLE AIR VQLUME
<br />GAL
<br />GALLON
<br />VEL
<br />VELOCITY
<br />GPH
<br />GALLONS PER HOUR
<br />VERT.
<br />VERTICAL
<br />GPM
<br />GALLONS PER MINUTE
<br />W
<br />WIDTH
<br />HP
<br />HORSE POWER
<br />W/
<br />WITHOUT
<br />HT
<br />HEIGHT
<br />W/O
<br />WITHOUT
<br />H2O
<br />WATER
<br />WB
<br />WET BULB
<br />HORIZ, HORIZONTAL'
<br />W.C.
<br />WATER COLUMN
<br />--------------
<br />rr frir>1` ij>r. f✓i�r
<br />Z
<br />El
<br />El
<br />El
<br />3
<br />LEGEND
<br />DUCT (SINGLE LINE)
<br />T
<br />THERMOSTAT
<br />EXISTING DUCT/PIPE
<br />-
<br />REMOTE SENSOR
<br />LINED DUCT (SINGLE LINE)
<br />H
<br />HUMIDISTAT
<br />m
<br />HOOD ANSUL SYSTEM PULL STATION
<br />LINED DUCT
<br />OVERFLOW NOZZLE
<br />EXPOSED SPIRAL W/ PAINT GRIP
<br />PIPE DROP
<br />Q
<br />ROOF DRAIN
<br />SUPPLY/VENTILATION DROP _
<br />_- _ -
<br />BALL VALVE
<br />RETURN DROP
<br />STRAINER
<br />EXHAUST DROP
<br />PRV
<br />SUPPLY DIFFUSER
<br />CHECK VALVE
<br />METER
<br />RETURN GRILLE
<br />NAT GAS REGULATOR
<br />EXHAUST GRILLE
<br />CAP
<br />3 WAY VALVE
<br />VOLUME DAMPER
<br />2 WAY VALVE
<br />FIRE DAMPER
<br />BUTTERFLY VALVE
<br />MOTORIZED DAMPER
<br />CIRCUIT SETTER
<br />SMOKE DETECTOR
<br />FLOW CONTROL VALVE
<br />DUCT ELBOW WITH VANES
<br />-SINGLE LINE (EXCLUDE VANES IN
<br />GAGE
<br />GREASE EXHAUST)
<br />THERMOMETER
<br />DUCT ELBOW WITH VANES
<br />PT PLUG
<br />(EXCLUDE VANES IN GREASE EXHAUST)
<br />PUMP
<br />RADIUS ELBOW
<br />DOUBLE CHECK VALVE
<br />RPZ CHECK
<br />FLEX DUCT RUN OUT
<br />FLEXIBLE CONNECTION
<br />r!�>.
<br />FLEX PIPE/CONNECTION
<br />AUTO AIR VENT
<br />INLINE CABINET FAN
<br />FROSTAT
<br />CEILING CABINET FAN
<br />-
<br />UNION
<br />HORIZ. UNIT HEATER
<br />GGAS- 0
<br />GAS PIPING
<br />CEILING UNIT HEATER
<br />_ _ 0
<br />CW PIPING
<br />-
<br />- - - -o
<br />HW PIPING
<br />INTAKE/VENT HOOD
<br />_ _
<br />_ _ _ _ -0
<br />HOT WATER RECIRCULATION PIPING
<br />- - - - - -o
<br />VENT PIPING
<br />EXHAUST/FLUE VENT HOOD
<br />-
<br />- o
<br />SANITARY PIPING (LONG DASH)
<br />ROOF FAN -----------------0
<br />GREASE WASTE (SHORT DASH)
<br />EXISTING C GAS/ELECTRIC ROOFTOP UNIT SCHEDULE
<br />MIN
<br />FAN
<br />COOLING
<br />COOLING
<br />HEATING
<br />HEATING
<br />-
<br />NOM
<br />UNIT
<br />QTY
<br />FAN
<br />OA
<br />FAN
<br />MOTOR
<br />TOTAL
<br />SENSIBLE
<br />MBH
<br />MBH
<br />HEATING
<br />VOLTS/
<br />MARK
<br />SERVES
<br />_
<br />MODEL
<br />TONS
<br />CONFIGURATION
<br />COMPR.
<br />CFM
<br />CFM
<br />ESP
<br />HP
<br />MBH
<br />MBH
<br />OUTPUT
<br />INPUT
<br />STAGES
<br />PHASE
<br />RTU-1
<br />BOH
<br />TRANS YHC120
<br />10
<br />DOWNFLOW
<br />1
<br />4000
<br />0.5
<br />113.97
<br />94.06
<br />120
<br />150
<br />1
<br />208/3
<br />RTU-2
<br />BOH
<br />TRANE YHC120
<br />10
<br />DOWNFLOW
<br />1
<br />4000
<br />0.5
<br />113.97
<br />94.06
<br />120
<br />150
<br />1
<br />208/3
<br />RTU-3
<br />DINING
<br />TRANE YHC120
<br />10
<br />DOWNFLOW
<br />1
<br />4000
<br />0.5
<br />113.97
<br />94.06
<br />120
<br />150
<br />1
<br />208/3
<br />RTU-4
<br />DINING
<br />TRANE YHCO60
<br />5
<br />DOWNFLOW
<br />1
<br />2000
<br />250
<br />0.5
<br />---
<br />63.49
<br />47.33
<br />48
<br />60
<br />1
<br />208/3
<br />NOTE 1: INDOOR COIL EAT = 80/67 FOR COOLING, 70 FOR HEATING.
<br />NOTE 2: OUTDOOR COIL EAT = 95 FOR COOLING, 17 FOR HEATING.
<br />NOTE 3: ESP DOES NOT INCLUDE FILTERS. FAN PERFORMANCE FOR DIRECT DRIVE UNITS IS AT HIGH SPEED.
<br />NOTE 4: PROVIDE HINGED ACCESS DOORS, UNIT MOUNTED DISCONNECT AND UNPOWERED RECEPTACLE, CONDENSER COIL GUARDS, STAINLESS STEEL HEAT EXCHANGER.
<br />NOTE 5: FACTORY MOUNTED SMOKE DETECTOR IN SUPPLY AND RETURN COMPARTMENTS AND INTERNAL FLOAT SWITCH WIRED FOR UNIT SHUTDOWN.
<br />NOTE 6: PROVIDE 2-POSITION MOTORIZED DAMPER AT OUTDOOR AIR HOOD.
<br />NOTE 7: ECONOMIZER WITH COMP ENTHALPY CONTROL MODULE. POWER EXHAUST FOR UNITS ABOVE 2000 CFM, BAROMETRIC RELIEF FOR 2000 CFM AND LOWER.
<br />NOTE 8: PROVIDE MANUFACTURER ACCESSORY ROOF CURB. CURB ADAPTORS SHALL REQUIRE SPECIFIC ENGINEER APPROVAL.
<br />NOTE 9: PROVIDE SPRING ISOLATION TYPE ROOF CURB.
<br />_
<br />NOTE 10: COORDINATE VOLTAGES WITH ELECTRICAL DRAWINGS PRIOR TO ORDERING. SUBMITTALS SHALL BE REQUIRED TO HAVE ELECTRICAL ENG. APPROVAL
<br />NOTE 13: PROVIDE REFRIGERANT HOT GAS REHEAT DEHUMIDIFICATION.
<br />NOTE 15: PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT WITH REMOTE SENSOR,
<br />END
<br />EXHAUST/VEINITILATION FAN SCHEDULE
<br />MOTOR
<br />VOLTS/
<br />FAN
<br />TAG
<br />MODEL
<br />TYPE
<br />SERVES
<br />CFM
<br />ESP
<br />HP�
<br />RPM
<br />SONES
<br />DRIVE
<br />PHASE
<br />INTERLOCK
<br />NOTES
<br />F-1
<br />HOOD
<br />HOOD
<br />1,350
<br />0,925
<br />0.75
<br />1,164
<br />11.8
<br />DIRECT
<br />120/1
<br />TIMECLOCK SET FOR OCCUPIED SCHEDULE
<br />F-2
<br />HOOD
<br />HOOD
<br />2000
<br />0.93
<br />0,75
<br />1377
<br />16.1
<br />DIRECT
<br />12011
<br />TIMECLOCK SET FOR OCCUPIED SCHEDULE
<br />F-3
<br />HOOD
<br />HOOD
<br />2000
<br />0.93
<br />0.75
<br />_
<br />1377
<br />16.1
<br />DIRECT
<br />120/1
<br />TIMECLOCK SET FOR OCCUPIED SCHEDULE
<br />F-4
<br />HOOD
<br />HOOD
<br />3000
<br />1.122
<br />1.5
<br />1120
<br />13.6
<br />DIRECT
<br />120/1
<br />TIMECLOCK SET FOR OCCUPIED SCHEDULE
<br />F-5
<br />ACED
<br />DOWNBLAST
<br />RESTROOMS
<br />300
<br />0.250
<br />1/3
<br />1,325
<br />8.9
<br />DIRECT
<br />12011
<br />TIMECLOCK SET FOR OCCUPIED SCHEDULE
<br />1,2,3,4
<br />1. COORDINATE VOLTAGES WITH ELECTRICAL DRAWINGS.
<br />2. PROVIDE INDOOR FANS WITH BACKDRAFT DAMPER, SPRING/NEOPRENE ISOLATION HANGERS AND ACCESSORY ROOF CAP AT SIZE INDICATED ON DRAWINGS.
<br />END
<br />U
<br />ICI
<br />O7
<br />O
<br />co
<br />Z
<br />w
<br />Q0
<br />rA
<br />CV
<br />Q
<br />vlcoz
<br />LL1
<br />C/�
<br />CIS Cfl
<br />� LL]
<br />co
<br />U Lu
<br />rJJ.
<br />��
<br />U
<br />LLJ
<br />ECV
<br />>
<br />f-r-
<br />N
<br />Q
<br />�
<br />Un
<br />z
<br />co
<br />m
<br />MM.
<br />F+y
<br />a
<br />i
<br />o o
<br />Q
<br />�'� • T w
<br />'�O ••
<br />o LU
<br />z
<br />i ...OR I D P: ��� w
<br />0 1A%
<br />CID
<br />m
<br />q
<br />v
<br />z
<br />q
<br />Q
<br />w
<br />U)
<br />z
<br />Q
<br />m
<br />w
<br />w
<br />J
<br />16018
<br />CONTRACT DATE: 08.13.2017
<br />BUILDING TYPE: ONE-OFF
<br />PLAN VERSION:
<br />SITE NUMBER:
<br />STORE NUMBER:
<br />Restaurant Shell
<br />Zephyr Plaza
<br />ZEPHYRHILLS, FL
<br />MECHANICAL
<br />SCHEDULES
<br />AND DETAILS
<br />PLOT DATE:
<br />
|