My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
3107 Kresterbrooke Ln
Zephyrhills
>
Building Department
>
Building Plans
>
3107 Kresterbrooke Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:26:40 AM
Creation date
2/27/2025 1:05:27 PM
Metadata
Fields
Template:
Building Plans
Street #
3107
Location
Kresterbrooke Ln
Contractor
Lennar Homes LLC
Building Plans - Permit #
19803
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTIC VENTILATION CALCULATIONS - B1 <br />ATTIC VENTILATION REQUIRED <br />UPPER VENTILATION PROVIDED <br />1/150 Rule <br />1/300 Rule <br />Ridge <br />Off -Ridge <br />(No Up ereq Ventilators <br />(Must Provide Upper Ventilators) <br />Vent Amt <br />Amt. <br />Total <br />Ventilation <br />ATTIC <br />Provided <br />SPACE <br />SQ. FT. <br />Total SQ. <br />SQ. FT. <br />SQ. IN. of <br />by Upper <br />IN. of <br />of vented <br />of <br />of <br />ventilation to <br />SQ.Ventilators <br />IN. of <br />IN. of <br />ventilation <br />ven <br />soffit <br />nti <br />ventilation <br />vented <br />be provided <br />Ventilation <br />en <br />Ventilation <br />en <br />See Elev <br />( ) <br />required <br />needed <br />required <br />soffit <br />by upper <br />needed <br />ventilators <br />Main <br />22.00000 <br />2.000000 <br />Floor <br />2002 <br />1922 <br />275 <br />961 <br />69 <br />480 <br />0 <br />606.0 <br />330.0 <br />276.0 <br />(Zone 1) <br />"NOTE" <br />GENERAL CONTRACTOR MUST ENSURE THAT PROPER VENTILATION IS PROVIDED AT EAVES/SOFFITS AS <br />REQUIRED BY FBC 6th ED. RESIDENTIAL. <br />General Notes <br />ROOF CRITERIA: <br />• 12" OVERHANG U.N.O. <br />• PLUMB CUT FASCIA ROOF <br />• PITCH PER ELEVATION <br />**G.C. VERIFY ROOF PITCH** <br />ROOF PITCH VARIES PER SUBDIVISIONS IT IS THE <br />CONTRACTORS RESPONSIBILITY TO VERIFY <br />ROOF SLOPE REQUIREMENTS WITH TRUSS <br />MANUFACTURER. <br />**ELECTRICAL SPECIFICATION NOTES** <br />ELECTRICAL CONTRACTOR MUST VERIFY WITH <br />THE SPECIFICATIONS FOR THE TYPE OF FIXTURE <br />TO BE USED. LIGHT FIXTURES SHOWN ARE FOR <br />LOCATION PURPOSES. <br />Exterior Covering <br />R703.7 Exterior plaster. <br />Installation of these materials shall be in compliance with ASTM C <br />926 and ASTM C 1063. <br />R703.7.1 Lath. <br />All Lath and lath attachments shall be of corrosion -resistant <br />materials. Attached per ASTM C 1063. <br />R703.7.2 Plaster. <br />Plastering w/ portiand cement plaster shall be not less than three <br />coats when applied over metal lath or wire lath and shall be not <br />less than two coats when applied over masonry, concrete. <br />c� <br />Z c <br />z�z <br />Q <br />a <br />w <br />O Lu <br />Ln <br />E <br />U <br />�M <br />w <br />C 8 2 <br />O _O N <br />ttno0 <br />C� <br />CO <br />Q rn <br />: 0 -& v <br />roi ¢ o <br />A, <br />B <br />D. <br />N^C B D•C, <br />Y� ,C M <br />m <br />\l <br />
The URL can be used to link to this page
Your browser does not support the video tag.