Laserfiche WebLink
I I _I I i - - I 1 II 1 1. 1. I. II I I" I 1 1111RII I 11 .I. , .1 y- I e I I 1 L _ °i— <br />-10 <br />is <br />Co <br />60 <br />00 <br />N <br />t` <br />T <br />F_ <br />00 <br />00 <br />T.O.P. <br />HDR HGT. <br />12 <br />5� <br />T.O.P.------- — -_�-7-- <br />HDR HGT. <br />12 <br />�5 <br />l I <br />CJ CJ CJ o Z <br />2nd FIN. N � Fn _ <br />--------------------------------------------------------------------------------- -- <br />FLR. CJ / WEEP 12 CJ / WEEP <br />T.O.M. <br />-------------------------------------- — <br />— <br />HDRHGT. <br />--------- ---------- ---------- <br />ROOF TO BE <br />CENTERED ON <br />DOOR <br />TEXTURED <br />23 H /aCEEMENTICIOUS <br />NISH ON C.M.U. <br />(TYP.) <br />F.FL. <br />2nd FIN. _ <br />"_ FLR - - <br />------ <br />T.O.M. <br />HDR HGT. <br />F.FL. <br />9' RIDGE VENT <br />12 <br />5� <br />REAR ELEVATION - 131 <br />SCALE: 1 /4"=1'-0" <br />12 <br />�5 <br />RIGHT ELEVATION - B1 <br />SCALE: 1 /4"= V-0" <br />General Notes <br />ROOF CRITERIA: <br />• 12" OVERHANG U.N.O. <br />• PLUMB CUT FASCIA ROOF <br />• PITCH PER ELEVATION <br />.G.C. VERIFY ROOF PITCH" <br />ROOF PITCH VARIES PER SUBDIVISIONS IT IS THE <br />CONTRACTORS RESPONSIBILITY TO VERIFY <br />ROOF SLOPE REQUIREMENTS WITH TRUSS <br />MANUFACTURER. <br />"ELECTRICAL SPECIFICATION NOTES" <br />ELECTRICAL CONTRACTOR MUST VERIFY WITH <br />THE SPECIFICATIONS FOR THE TYPE OF FIXTURE <br />TO BE USED. LIGHT FIXTURES SHOWN ARE FOR <br />LOCATION PURPOSES. <br />Exterior Covering <br />R703.7 Exterior plaster. <br />Installation of these materials shall be in compliance with ASTM C <br />926 and ASTM C 1063. <br />R703.7.1 Lath. <br />All Lath and lath attachments shall be of corrosion -resistant <br />materials. Attached per ASTM C 1063. <br />R703.7.2 Plaster. <br />Plastering w/ portland cement plaster shall be not less than three <br />coats when applied over metal lath or wire lath and shall be not <br />less than two coats when applied over masonry, concrete. <br />R703.7.3 Water-Resisitive Barriers. <br />Water-resisitive barriers shall be installed where cement plaster <br />(stucco) is to be applied over wood -based sheathing, shall include <br />a water -resistive vapor -permeable barrier. The individual layers <br />shall be installed independently such that each layer provides a <br />separate continuous plane and any flashing intended to drain to <br />the water -resistive barrier is directed between the layers. The <br />barriers shall consist of one of the following. <br />1. Two layers of an approved water resistant barrier material in <br />accordance with R703.2. <br />2. One layer of an approved water -resistive barrier (paperbacked <br />stucco lath) over an approved synthetic house wrap. <br />R703.4 Flashing. <br />Approved corrosion -resistant flashing shall be applied <br />shingle -fashion in a manner to prevent entry of water into the wall <br />cavity or penetration of water to the building structural framing <br />components. Flashing shall be installed at the following locations. <br />• Exterior window/door openings. <br />• Intersection of chimneys or other masonry contructions with <br />frame walls. <br />• Under and at the ends of masonry, wood or metal copings <br />and sills. <br />• Continuously above all projecting wood trim. <br />• Where exterior porches, decks or stairs attach to a wall or <br />floor assembly of wood -frame construction. <br />• At wall and roof intersections <br />• At Built-in gutters. <br />z M <br />— o <br />z�z <br />a <br />Q) c <br />�--•+ 11J <br />C.) <br />O w <br />CLI <br />T <br />E <br />o0 <br />U <br />�M Cn <br />LIJ <br />C p M <br />•1 N <br />o <br />o <br />B D. <br />L,C�B o_ c <br />'r <br />� <br />o <br />� N <br />� � <br />N <br />Im Z ZM <br />09x1151!!� <br />LU <br />wQ g �'�¢' - - <br />�Z <br />o •� <br />I® a - <br />48: <br />To the best ofWe�En er's knowlejigd, i ®rmyation, <br />belief, the structii4 plans and spggificatiortis,adntained <br />within these drawin,gg� corAplµwith tl�e2bi7 Flo�iti�i-` ,` <br />Building Code - Resid'eiatial 6th Edition.. E9yir��r�s l�,` <br />signature and seal is orilq. the structura'rengineitrF�i�g <br />portions of the drawing pa�'fbEaring Engineer',iignature <br />and seal. ' <br />0 <br />0 <br />Z f_1 <br />O � � <br />P-01�o <br />tD <br />I>•IMCO <br />M <br />a 'gyp Ln <br />a cn <br />Q LL <br />C) M <br />Q� U fu <br />aCO <br />Q CO <br />Z <br />H <br />W <br />J� <br />MJ <br />oZ <br />zg <br />6� <br />' ) <br />v <br />Z <br />f H <br />w z- d <br />O <br />0 <br />g-W0 <br />W <br />uz <br />Q <br />LyZW <br />W C L0 <br />O'2w8 <br />W <br />04 <br />"��© <br />L <br />W <br />g O <br />Q <br />' <br />z <br />gz <br />N. <br />3 <br />1 n <br />C <br />iN <br />z <br />o <br />Z <br />o <br />= <br />W <br />O� <br />OR <br />X <br />C� <br />Cr <br />cg <br />*k <br />1'V <br />0 a <br />Q <br />Z <br />8 °` <br />�2 <br />LI,! <br />z u <br />waz <br />NQ <br />Z <br />Z <br />�Z <br />m <br />4Z <br />LU <br />�Z <br />0 <br />z <br />� <br />a <br />SCALE : AS NOTED <br />DATE : 3/30/2018 <br />TECH: MJAM ES <br />VERSION N0. 5ol <br />SHEET NO. <br />3.2 <br />