Laserfiche WebLink
THIS DETAIL ONLY REFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH ATTACHMENT. <br />METAL LATH — •.. <br />16GAx1-l',2," LONG (34'4" CROWN) <br />STAPLES 4, 6" 0 C. VERT BETWEEN <br />STUDS (NOTED THUS:—) - OFFSET <br />STAPLES BETWEEN STUDS AS SHOWN <br />vV4LL SHEATHNG <br />16GAx1-1;2" LONG ,34"-1" <br />CRO*N1 STAPLES a, 6" <br />G.r_ VERT INTO STUDS <br />(NOTED THUS:--) <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 34' = T-0" <br />*DETAIL EXCEEDS THE REQUIREMENTS FOR FBCR 703.7.1 LATH* <br />'ONLY APPLIES TO LENNAR TPAIJAX"* <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4"-1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESWE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C 1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />STUB -OUT FOR ' <br />GAS METER 0 — <br />O <br />CV <br />H C G <br />000 <br />a _ <br />�o <br />1'-0" o o LO <br />U <br />J <br />x <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2)16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16-5" <br />1 SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />164" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />" TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />*' SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />15/32" CDX <br />PLYWOOD OR <br />7/16" OSB <br />RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE a <br />0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH 2-3/8 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + + <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist Backer Block <br />Thickness Filler Block Thickness <br />Series <br />3/4" or 7/8" <br />5000s 1.8/1.7 wood panels Two 3/4" wood panels or 2 x <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 wood panels 2 x _ + 5/8" or 3/4" wood panel <br />.902.0 2 x _ lumber Double 2 x _ lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ° <br />x <br />1/8" gap <br />4 <br />FILL CELL— \ r— STD. 90° HOOK r— BOND BEAM <br />(71 <br />w <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ° <br />x <br />1/8" gap <br />4 <br />FILL CELL— \ r— STD. 90° HOOK r— BOND BEAM <br />(71 <br />w <br />..........'. <br />Er <br />¢ STD. 90° <br />CONT. #5 <br />CONT. #5 HOOK <br />BAR <br />BAR <br />OOC <br />#5 CONT. <br />77 <br />.......... <br />FROM <br />NDATION <br />TOUHIGHEST <br />BOND BEAM <br />F�_�T <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. 2" min. <br />) Small gap <br />2," <br />max. � 4 max. <br />__TClinch nails <br />when <br />possible 1 <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 2" min. <br />required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Ys" GAP @TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouthcuts. N.T.S. <br />- Under 2nd floor crik imam wl inadQ <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />'Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />consideration. Check <br />wall or beam below.* <br />local building <br />�1/16" <br />code for appropriate <br />details inL,--or--21 <br />One 10d box <br />areas=20 of high <br />sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />Boise Joist Blocking <br />ltsP 3" 11ndl nails at R" nr. <br />1-, Provide adequate bearing <br />for each lapped joist. <br />Odnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />NO HOLES (EXCEPT MINIMUM SPACING = 2x GREATEST <br />KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />(see table below) <br />DO NOT cut, notch <br />or drill flanges <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel "Non -stacking walls <br />require additional consideration.— <br />6�, A 2" ROUND HOLE Y 6,� 6�� DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Y2" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1X2" <br />Round Hole Diameter (in) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />8.875 <br />10 <br />11 <br />12 <br />13 <br />Rectangular Hole Side (in) <br />— <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />Any 16"' joist <br />Span (ft) <br />8 <br />V-0" <br />V-1 " <br />1'-2'" <br />V-2"' <br />V-3" <br />1'-3" <br />V-7" <br />1 '-1 1 " <br />-"-X' <br />''-C," <br />3'-2" <br />3,-7" <br />12 <br />l'-0" <br />V-1" <br />V-2" <br />V-2" <br />1"-3" <br />l'-9" <br />2'-4- <br />2--1 . <br />,"7" <br />a'-'" <br />4'-9- <br />5'-4" <br />16 <br />V-0"' <br />V-1 "' <br />V-2," <br />V-2" <br />1' 7" <br />T-5" <br />T-2" <br />�" <br />6��^ <br />T-2" <br />20 <br />1' 0" <br />V-1 "' <br />V-2" <br />V-2" <br />2'-0" <br />3' 0" <br />4'-0" <br />4"-1,. <br />5' 11' <br />6' � 1' <br />7'-11" <br />$'-11 <br />24 <br />1'-0"" <br />1 "-1 "" <br />1'-2" <br />1'-3"' <br />2'-5" <br />_ <br />3' '7" <br />__ <br />l'-9" <br />5' -1 i ;,, <br />7, 2" <br />8,�, <br />9... <br />10'-9"' <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1Y" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Y" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />\Install tight to top flange. <br />Joist hanger <br />W \ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />V/4"-2" gap 1 <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />6 X Joist <br />depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series De th End Intermediate <br />BCI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />BCI 6000s® <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BC190se <br />-7/ " <br />3-16d <br />3-16d <br />14" <br />-1 <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />w/(22)' <br />NAILS 1 <br />5/8" 0 <br />THRU <br />BOLT <br />SIMPSC <br />w/ (22) <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />LC <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />VIIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing H ETAL20 INSTALLATION <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />i <br />SLEEVE THRU STEM <br />SEE PLAN FOR °• a . • •. <br />FOUNDATION INFO ° <br />STEM FOUNDATION <br />GRADE <br />a. <br />i—REINF. SEE PLAN <br />�A/C CHASE 4" PVC` (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />°�® <br />LOCATION OF <br />SECOND H10/ <br />SIMPSON H10A <br />° °'° <br />(WHEN <br />w/ (18) 10d x 1 1/2" <br />° <br />REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE .10 <br />PENETRATION <br />I a ' <br />1-1 � 1=111=� <br />-III; III=1 I I ' <br />II=1I1= • • i <br />12" BELOW <br />GRADE <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />4 <br />a <br />1 I <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE VERTICAL THRU FND. <br />TOP (2) #5's x 4' 0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPEAPENETRATION PLUMBING LINE i <br />io g ° <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0"— PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />Fr <br />-----4 . 4 — �.— ° . °o .G <br />II <br />14�: aI l <br />° e —P <br />I I I - <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />OCT 2 8 22 <br />\/RA <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 71h Edition <br />by Debra Anne Klahr PX2390 <br />" <br />N <br />O <br />�`'• <br />N <br />00 <br />s <br />� <br />zo <br />S, <br />00 <br />L0 <br />i.; <br />'" <br />• <br />L <br />� <br />IY <br />,T r;•� ` <br />O <br />z <br />w <br />\ <br />— � <br />0 <br />Z <br />¢ <br />0 <br />� (DLO <br />c � <br />W IV. o U <br />Cr)c <br />-I--N <br />to <br />co <br />f, O C) 01,010— u a <br />V -Q � <br />� M <br />4) E o <br />_: _0 o <br />° ""o a Q <br />.int <br />wd•: T* <br />QN C <br />^` <br />W <br />L 00 E� .2) <br />° 'a <br />- <br />LV <br />W� W J wm�O <br />W°__�0?�0 <br />IY <br />< Q <br />�L�0°Jo <br />�dO zWu_0z20,F-,_ <br />� �' <br />O <br />�- <br />Z <br />C7W�W�ZOWo�mzj U <br />0 07ww cn D ¢ Q <br />���0W�ZWZOW0oa <br />LL <br />OW �F-� �w0 <br />¢ ¢ <br />LL¢ 0 �aQ LL <br />O <br />O <br />z <br />W <br />OF_ <br />> (n o <br />�Ir—MP"_ <br />J Lo <br />U) <br />ti <br />UJ < U� <br />I— 0- co <br />z <br />�a2T- <br />Z U <br />z� <br />W <br />Wo <br />J O <br />CIO <br />I <br />I <br />I <br />C)000� <br />N <br />N <br />O <br />O <br />N <br />CD0 <br />N <br />N <br />_M <br />C)0 <br />00 <br />0 <br />Co0 <br />O <br />� <br />N <br />C,M <br />l <br />1 <br />z <br />O <br />NLO <br />U") <br />; <br />N <br />M <br />4 <br />V, <br />Z < <br />O <br />Zw <br />CD <br />4--+ <br />O <br />W <br />U_ <br />W O O <br />V� U <br />LO <br />-0 <br />H <br />0 <br />�r¢ <br />z <br />airs <br />W=Q <br />0 <br />UJ <br />�~2 <br />~O <br />N <br />ZZ P, <br />W <br />a�_� <br />■ ■ <br />0 <br />O <br />Q <br />gwlj0 <br />ir <br />ww <br />Z <br />z <br />d <br />�Z <br />U <br />J <br />O <br />� <br />co <br />W <br />zSN1Z <br />J <br />WW <br />o <br />CD <br />LAST PLOT DATE <br />40 <br />Z <br />STRUCTURAL <br />DETAILS <br />