My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6424 Silverado Ranch Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
6424 Silverado Ranch Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:11:59 PM
Creation date
2/27/2025 1:10:42 PM
Metadata
Fields
Template:
Building Plans
Street #
6424
Location
Silverado Ranch Blvd
Contractor
Lennar Homes LLC
Building Plans - Permit #
20161
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-----------------------1 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I i <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />L— — — — — — — — — — — — — — — — — — — — — — —'J <br />(1) LAYER TYPE II (#30) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />SHINGLE ROOF FOR UNDERLAYMENT REQUIREMENTS SEE R905. <br />INSULATIO <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P P0, <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS I <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4)16d TOENAILS TO TOP PLATE <br />p <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2)10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />J <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />uJ <br />�f= <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />I <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />W <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />rB-*"'Y R <br />SO. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />L <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />E PLAN 0 <br />OR FELT <br />I PAPER FOR <br />MOISTURE <br />JBARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 318" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB 8"xWX16" CONC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />A' <br />FINISH <br />a <br />FOUNDATIONE PLAN & NOTES) <br />M <br />v <br />4"x4" INSPECTION PORT AT <br />� <br />EACH FILL CELL TYPICAL <br />� <br />w <br />1x WD FURRING @ 24" O.C. <br />a <br />AT GARAGE CONTRACTOR <br />BASEBOARD <br />N <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />NOTE: EXTEND DECO FINISH <br />.� <br />MUNICIPALITY <br />410 6" BELOW GRADE <br />N <br />• .. Q <br />FINISH <br />GRADE o0 <br />� <br />�• \ <br />mac! <br />Cn <br />• <br />.• <br />6x6 W1.4xW1.4 <br />— — _ : • <br />a' <br />_ <br />q z <br />WWF OR FIBERMESH <br />* HOOK <br />(3) # 5 REBAR ON 3" CHAIR 4e�Pl� <br />"--STD. 90DETAIL) <br />W/3" MIN. CLEARANCE (SEE DETAIL) <br />TYP 2-STORY WALL SECTION <br />SCALE:3/4"=V-0" S6 <br />ri <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 112" NAILS TO <br />2nd FLO <br />BEAM/GI <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8)1 Od x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1 /2" TO BAND <br />JOIST AT EA. STUD e <br />/2nd FLOOR WALL_ <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8)1 Od x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />TE W/ <br />O.C. <br />OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2)10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rW� <br />SCALE: N.T.S. S6 <br />2"x4" PANEL BLOCKING @ 48" O/C <br />FOR THE FIRST V-0" OF END <br />WALL FROM EA. END. (TYP.) TOP & <br />BOTTOM CHORD ATTACHED W/ (2) <br />16d TOE NAILS <br />DECKING - <br />FLOOR TRUSS <br />SEE FRAMING <br />PLAN <br />2"x4" CROSS BRACE @ 48" <br />O/C FOR THE 1 ST 2'-0" OF <br />END WALL W/ (2)1 Odx3" @ EA. <br />END INTO 2"x4" BLOCKING <br />E <br />S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />WEEP SCREED <br />INSTALLED PER MANUF. <br />SIMPSON HETA20 w/ (8)1Odx1 1/2" <br />I I NAILS @ 24" O.C. INTO TRUSS <br />I II. BLOCKING & MIN. 4" EMBEDMENT <br />IN KO BLOCK <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" QS 6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1 <br />2"x BOT. PLATE <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSS <br />FLOOR CONNECTION <br />@ MASONRY 1ST FLR. SEE J/S6 <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6)1/4" x 21/4" TITEN <br />SCREWS TO MANSONRY <br />WALL PER STRAP <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8)1 Odxl 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />SCALE: 3/4"=V-0" <br />.— B.U.C. <br />(8)10d NAILS TO <br />STUD PER STRAP <br />19 <br />r <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=1'4' ��S6 <br />NOTE: SEE TYPICAL WALL SEE SHEATHING <br />SECTION C/S3 FOR SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. 5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd 5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > V-6" EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10)10d 2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD F(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. TYPICAL TENSION 2600#.) <br />2X P,T. PLATE 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />T— •. <br />A' io <br />I m1J (3) #5 CONT. ON 3" <br />8" 11-8" r 8CHAIR W/ 3" MIN. <br />CLEARANCE <br />-017 <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />S6 <br />15/32" OSB <br />EXPOSURE1 <br />SHEATHING <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />SECTION X-X IF <br />NOT FULL <br />HEIGHT SHEET- <br />(2)- 2x TOP PLATE <br />DG T V 111i <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING w <br />SOLID 2x coo <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />_ <br />o. U <br />C <br />x <br />w <br />x <br />E <br />2x STUDS Lu <br />BEYOND. y <br />SEE PLAN o <br />2 <br />9FLOOR SYST M <br />1111 <br />IZ <br />2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />SEE PLAN <br />BLOCKING BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />4 FT. <br />O <br />O <br />5 FT. <br />4 FT. <br />O5 <br />FT. <br />4 FT. <br />A—__7 <br />(D4 <br />FT. <br />2x CRIPPLES @ - <br />16" O.C. W/ (2)12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />ROOF NAILING ZONE DIAGRAM <br />o�TFR\ <br />FNi,1,_o <br />ROOF NAILING SCHEDULE: <br />NAILING ZONES (SHINGLE AND TIC <br />ZONE 1: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />y <br />ZONE 2: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />z_ <br />ZONE 3 8d RING SHANK NAILS @ 4" O.C. ON EDGE AND 4" O.0 IN FIELD <br />z <br />(NOTE: IF 5/8" PLYWOOD IS USED, CONTRACTOR MUST USE tOd RING <br />SHANK NAILS) <br />NOTE: <br />ROOF SHEATHING: (APA RATED EXPOSURE 1) 1/2" PLYWOOD <br />(TILE) OR 7/16" OSB MIN. (SHINGLES) SPAN RATED 24/16 <br />W <br />oSHEATHING <br />MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, ATTACH <br />r� <br />PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE ATTACHED TO <br />Z N 0 <br />STUD AND OR BLOCKING AT ALL EDGES. <br />LL , u. <br />A MINIMUM 1/8" SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES <br />AND END JOINTS TO ALLOW FOR EXPANSIONS. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN 1/8 <br />318" "S" = NAIL 31W <br />SPACING <br />S �4"12.S U2" <br />4si�/2 <br />„ <br />® SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />O NAIL AT BASE 2 ROWS @ 4" O.C. W/8d COMMON NAIL <br />© NAIL AT TOP PLATE TWO ROWS ® 4" O.C. W/8d COMMON NAIL <br />@ NAIL OPENING PERIMETER @ W O.C. W/8d COMMON NAIL <br />@ NAIL INT. AT 3" O.C. W/8d COMMON NAIL <br />Q STAGGER ALL VERT. JOINTS & NAIL (Lb 4" O.C. <br />W/8d COMMON NAIL <br />QF SHEATHING SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />W/ 8d COMMON NAILS @ 4" O.C. <br />@ (2) 8d NAILS 0 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />MEMBER IF GABLE END <br />NOTE: <br />" 8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 2 1/2' <br />" DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />O <br />AT ALL PANEL BLOCKING <br />LOCATIONS MIN 2 X 4 #2 SPF <br />TURNED VERTICAL W/ 7/16" <br />OSB FLITCH PLATE TO W/ (2) <br />12d TOENAILS EA. END. NAIL <br />FLITCH PLATE To VERTICAL <br />W/ (4) 8d NAILS <br />(2) 8d NAILS (� 3" O.C. <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />14 2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 . INTERIOR HEADER: <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6)10d x 1 1/2" EACH SIDE <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN, <br />SLAB W/ 6x6 W1.4xW1.4 <br />tt <br />WWF OR FIBERMESH <br />a •.. a <br />• <br />�' �• <br />1=11 I 1 <br />-11111A. <br />111111111111 •; � .� <br />—III—III d •� .. •. <br />M <br />S6 <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />1 <br />2 <br />1 <br />2 <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16, <br />(3) <br />3) <br />1 12) <br />(3) <br />1 (2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10)1Od NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE <br />T <br />1 IIt; It 4 2 <br />(3) # 5 REBAR ON 3" CHAIR JI 4" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING V <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" t^6 <br />ADDITIONAL INFORMATION. J <br />U' <br />Z co <br />Z <br />a. <br />U, 2! <br />cV(D <br />0 <br />^1' <br />cn <br />w <br />"V — <br />Ow <br />' `+ v <br />W <br />F - <br />S <br />m N <br />N M MM <br />C M <br />N <br />pso <br />U <br />§ <br />¢& <br />Sao <br />aS o <br />Al I <br />B D. <br />ry r.g n c <br />N D <br />C4 <br />z <br />4AZ <br />ry` z to <br />w <br />�� <br />usus <br />Q <br />Ch ? <br />Z PG <br />11AF m <br />Ulo, <br />W a <br />ar <br />F <br />rOrESC <br />fittll�R���� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and sped0cations contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residentiai 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />LENNAR <br />4600 W. Cypress St, Suite 2001 Tampa, FL 33607 <br />www.LennarTampa.com <br />o <br />W <br />za <br />w< X <br />=o <br />U) <br />C J <br />SVr � <br />Q <br />0 <br />O <br />U) <br />_ <br />w <br />o <br />�_ <br />F= <br />U) <br />N <br />M <br />w <br />J <br />z <br />P <br />I- <br />r� <br />QIn <br />Z <br />("4 <br />J <br />Lr) <br />..$ <br />$fig <br />dcV' <br />¢ <br />z <br />k <br />IS <br />00 <br />Z <br />� <br />t8 <br />2 <br />rn O <br />V-4 <br />a <br />in <br />S <br />SCALE : AS NOTED <br />DATE : 6/20/2018 <br />TECH: MJAM ES <br />VERSION N0. 4ol <br />SHEET NO. <br />S6 <br />(MONO) <br />
The URL can be used to link to this page
Your browser does not support the video tag.