My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
8007 Wheat Stone Dr
Zephyrhills
>
Building Department
>
Building Plans
>
8007 Wheat Stone Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:31:10 AM
Creation date
2/27/2025 1:15:23 PM
Metadata
Fields
Template:
Building Plans
Street #
8007
Location
Wheat Stone Dr
Contractor
D R Horton
Building Plans - Permit #
22493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />METAL LATH <br />ONE LAYER OF WATER -RESISTIVE <br />TRADITIONAL HARD -CO <br />VAPOR -PERMEABLE BARRIER WITH A <br />STUCCO INSTALLED IN <br />PERFORMANCE AT LEAST EQUIVALENT <br />ACCORDANCE WITH THE <br />TO GRADE D BUILDING PAPER. <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />ZIP SYSTEM 0 TAPE <br />(PCA) RECOMMENDATIONS <br />(INSTALLED OVER ALL JOINTS <br />WITH THE MOST <br />IN ZIP SYSTEM SHEATHING.) <br />RESTRICTIVE <br />CONTROLLLING. <br />OVERLAP TAPE A MIN <br />V AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT <br />PANELEDGES <br />VERTICAL AND HORIZ <br />CONTROL JOINTS AS REQ'D <br />FASTEN ZIP SYSTEM 0 <br />SHEATHING AS REQUIRED BY <br />ENGINEER -OF -RECORD AND/OR <br />LOCAL BUILDING CODE <br />TOP EDGE OF WEEP SCREED TAPED TO <br />WALL SHEATHING WITH ZIP SYSTEM® <br />TAPE OR ADHESIVE BACKED FLASHING <br />(MUST MEET AC148) -1 <br />CODE -APPROVED VINYL WEEP <br />SCREED TO LAP CMU WALL MIN 2" <br />CMU MASONRY WALL <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS ® SHEATHING WITH <br />HARD COA <br />T STUCCO AT 2ND LEVEL <br />BLOCK TO FRAME TRANSITION) <br />ese construction details are provided to assist in the installation of Zip System ® product(s) <br />and may not apply to every situation. Manufacturer accepts no responsibility or liability for the use <br />of these or other construction details. <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIF <br />SYSTEMS 0 SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />1/8" GAP RECOMMENI <br />PANELEDGES <br />ZIP SYSTEM 0 TAPE <br />(INSTALLED OVER AL <br />JOINTS IN ZIP SYSTEI <br />SHEATHING.) <br />OVERLAP TAPE A MIN <br />OF V AT ALL T-JOINT; <br />1/8" GAP RECOMMEN <br />FASTEN ZIP SYSTEM <br />REQUIRED BY ENGIN <br />AND/OR LOCAL BUILC <br />CMU N <br />`ZIP SY5 I tM CRJ SHtA I HIND IJ AF'NKUVtzU I U <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS ® SHEATHING WITH <br />LAP SIDING AT 2ND LEVEL <br />(BLOCK TO FRAME TRANSITION) <br />These construction details are provided to assist in the installation of Zip System ® roduct(s) <br />and may not apply to every situation. Manufacturer accepts no responsibility or liabili�y for the <br />use of these or other construction details. <br />WALL ASSEMBLY <br />VINYL/WOOD/FIBER CEMENT <br />SIDING (INSTALLED IN <br />ACCORDANCE WITH <br />CLADDING MANUF'S <br />INSTALLATION <br />RECOMMENDATIONS) ZIP <br />SYSTEMS 0 SHEATHING <br />WOOD OR LT. GA. METAL <br />STUDS. <br />1/8" GAP RECOMMENDED AT <br />PANELEDGES <br />ZIP SYSTEM 0 TAPE (INSTALL <br />OVER ALL JOINTS IN ZIP SYST <br />SHEATHING.) <br />OVERLAP TAPE A MINIMUM OF <br />1" AT ALL T-JOINTS <br />1/8" GAP RECOMMENDED AT F <br />FASTEN ZIP SYSTEM 0 SHEA' <br />ENGINEER -OF -RECORD ANDK <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />ZIP SYSTEMS ® SHEATHING WITH <br />LAP SIDING AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ®product(s) <br />and may not apply to every situation. Manufacturer accepts no responsibility or liability for the <br />use of these or other construction details. <br />TRADITIONAL HARD -COAT - <br />STUCCO INSTALLED IN <br />ACCORDANCE WITH THE <br />MANUFACTURER'S OR THE <br />PORTLAND CEMENT ASSC. <br />(PCA) RECOMMENDATIONS <br />WITH THE MOST <br />RESTRICTIVE <br />CONTROLLLING. <br />FOUNDATION <br />VERTICAL AND HORIZONTAL <br />CONTROL JOINTS AS NEEDED. <br />DESIGNER -OF -RECORD TO SPECIFY <br />TYPE AND LOCATION. <br />CODE -APPROVED WEEP <br />SCREED AT BASE OF WALL <br />METAL LATH <br />MORTAR SETTING BED ON <br />ONE LAYER OF WATER -RESISTIVE <br />TOP OF MORTAR SCRATCH <br />VAPOR -PERMEABLE BARRIER WITH A <br />COAT IN ACCORDANCE <br />PERFORMANCE AT LEAST EQUIVALENT <br />WITH MANUFACTURER'S <br />TO GRADE D BUILDING PAPER. <br />INSTALLATION <br />r—ZIP SYSTEM® SHEATHING* <br />RECOMMENDATIONS <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />WOOD OR LT. GA. METAL STUDS <br />TOP EDGE OF WEEP SCREED NATURAL OR MANUF — <br />TAPED TO WALL SHEATHING WITH STONE VENEER. <br />ZIP SYSTEM® TAPE OR ADHESIVE INSTALL IN <br />BACKED FLASHING. (MUST MEET ACCORDANCE <br />AC148) WITH MANUFACTURER'S <br />RECOMMENDATIONS <br />FOUNDATION \ <br />da e <br />d <br />DRIP EDGE FLASHING OR WEEP SCREED <br />IN ACCORDANCE WITH <br />MANUFACTURER'S <br />RECOMMENDATIONS AT BASE OF ZIP <br />SYSTEM WALL SHEATHING <br />ZIP SYSTEMS ® HARD COAT <br />STUCCO AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System 0 product(s) and may not apply to <br />everysituation. Manufacturer accepts no responsibility or liability for the use of these or other construction details. <br />ZIP SYSTEM® SHEATHING.* <br />LATH <br />*ZIP SYSTEM® SHEATHING IS APPROVED TO <br />REPLACE THE FIRST LAYER OF A TWO -LAYER <br />UNDERLAYMENT SYSTEM. <br />WOOD OR LT. GA. METAL STUDS <br />ONE LAYER OF WATER -RESISTIVE <br />VAPOR -PERMEABLE BARRIER WITH A <br />PERFORMANCE AT LEAST <br />EQUIVALENT TO GRADE D BUILDING <br />PAPER <br />TOP EDGE OF DRIP EDGE FLASHING <br />TAPED TO ZIP SYSTEM SHEATHING <br />SURFACE W/ ZIP SYSTEM TAPE OF <br />ADHESIVE <br />BACKED FLASHING. (MUST MEET AC148) <br />ZIP SYSTEMS ® SHEATHING w/ <br />ADHERED STONE AT SLAB ON GRADE <br />These construction details are provided to assist in the installation of Zip System ® rod and n I p a p Sys e p uct(s) a may of apply to <br />everysituation. Manufacturer accepts no responsibility or liability for the use of these or other construction details. <br />N ? <br />a <br />O' <br />APEX <br />O U <br />�f <br />r � <br />� t2 <br />N <br />N <br />co <br />J <br />S2 <br />W f: <br />.J <br />J <br />z true design studios <br />U) <br />Y <br />9000 REGENCY SQUARE BLVD. <br />o SUITE 100, JACKSONVILLE, FL 32211 <br />O 0 <br />W � <br />� is <br />Cn <br />ow" <br />m uffON <br />w dw M <br />eft <br />Q <br />0 6200 LEE VISTA BLVD, STE 400 4- <br />U) ORLANDO, FL 32822 <br />U P: 407-850-5200 <br />z <br />W <br />0 <br />w <br /><Y <br />O <br />O <br />O <br />O <br />r <br />ti <br />tc� <br />ti <br />z <br />z <br />W <br />LLI <br />U) <br />W <br />z_ <br />U <br />W <br />C0 <br />w <br />W <br />O <br />O <br />W <br />U^ <br />VJ <br />z <br />� <br />vJ <br />Z <br />w <br />o04 <br />> <br />w <br />U) <br />w <br />o <br />w <br />°- <br />d' <br />o <br />TM <br />o <br />LU <br />X <br />o <br />z <br />0 <br />0 <br />Q <br />p <br />o <br />w <br />I-_ <br />O <br />J <br />LL <br />Abbott Park <br />f1 <br />Q Ll_ <br />V LOT 002-03-A w <br />z Q <br />W <br />O w <br />J PROJECT NO: I— <br />z 2019.007602 z <br />U � <br />W DRAWN: <br />I— LDG w <br />X CHKD: <br />a JAC p <br />Q <br />X <br />Q LO <br />m w <br />w Q <br />z 0 <br />O U <br />W z <br />Q Q <br />z < <br />O U) <br />09-26-19 z <br />U <br />Q REVISIONS: < <br />U) No. Description Date 1 <br />} w <br />Q = <br />J H <br />O w <br />z J <br />2 <br />w U <br />X 0 <br />az <br />Q A405 O <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.