Laserfiche WebLink
16" <br />CONCRETE SLAB w/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />VAPOR BARRIER <br />*REARIING WALL FOOTING SECTION <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />e° d <br />12" UNDER 1 STORY WALL <br />16" UNDER 2 STORY WALL <br />0'-0" A.F.F. SEE ARCH <br />(MAX 20" <br />DEEP) <br />a e. <br />} 4" <br />4" EXTENSION <br />UNDER BRICK VENEER <br />VAPOR BARRIER <br />6 BEARING CURB STEP SECTION <br />CONCRETE SLAB W/ <br />6x6 W1.4 x W1.4 WWF <br />OR FIBER MESH <br />8" CMU CHAIR <br />TOP OF SLAB oL <br />BLOCK W/ (1) #4 OR #5 CONT. <br />U) <br />Q o <br />VAPOR BARRIER �\ <br />W <br />o <br />#4 OR #5 VERT REINFORCING / / <br />UP TO 3 COURSES: 72" O.C. \/\ <br />//\/\/\\\// <br />4 TO 5 COURSES: 48" O.C. <br />FOOTING TO BEAR ON FIRM <br />ADDITIONAL #4 OR <br />#5 . //�\ /\' #5 IN BRICK LEDGE <br />UNDISTURBED SOIL <br />VERTICAL REINFORCEMENT <br />4" OPT BRICK LEDGE <br />NOTED ON FND PLAN <br />TO HAVE 6" BEND AT BOTTOM <br />CAST -IN -PLACE FOOTING SPECS <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />2 STEMWALL SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, <br />PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS <br />CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />0'-0" A.F.F. 1-6 <br />(BEYOND) <br />FLOATING CONCRETE _w <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH > <br />�4 <br />#4 OR #5 VERT REINFORCING <br />UP TO 3 COURSES: 72" O.C. <br />4 TO 5 COURSES: 48" O.C. <br />FOOTING TO BEAR ON FIRM <br />UNDISTURBED SOIL <br />VERT REINFORCEMENT TO <br />HAVE 6" BEND @ BOTTOM <br />CAST -IN -PLACE FOOTING SPECS <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />U-BLOCK W/ <br />U J <br />(1)#4OR#5 <br />Q <br />CONT <br />w <br />w <br />FINISH <br />O <br />GRADE <br />Q //j</j\//\ <br />p <br />ADDITIONAL #4 OR <br />#5 IN BRICK LEDGE <br />4" OPT BRICK LEDGE <br />NOTED ON FND PLAN <br />TSTEMWALL CURB SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />1) #4 OR #5 CONT. CONCRETE SLAB W/ 6x6 <br />( W1.4 x W1.4 WWF OR FIBERMESH <br />MINIMUM 24" (1) #4 OR #5 90" BEND @ 48" O.C. <br />36" MAX --,.,VARIES PER ` - — - — <br />ARCH PLANS ° a <br />12" MIN` ° ° e \ VAPOR BARRIER <br />/ FOOTING TO BEAR ON FIRM <br />UNDISTURBED SOIL <br />6" OPT. EXTENSION <br />IN BRICK LOCATIONS <br />ON FND PLAN <br />12" UNDER 1 STORY WALL w/ <br />ADDITIONAL NO. 4 OR NO. 5 (2) #5 OR (2) #4 CONTINUOUS <br />BAR IN BRICK LEDGE <br />16" UNDER 2 STORY WALL w/ <br />(2) #5 OR (3) #4 CONTINUOUS <br />rl \ MONOLOTHIC FOOTING SECTION - 36" MAX DEPTH <br />*NOTE*: IT IS ACCEPTABLE TO SUBSTITUTE THIS "1A" FTG DETAIL FOR THE <br />"1" FTG DETAIL SPECIFIED ON THE FDN PLAN @ ANY LOCATIONS THAT THE FTG <br />DEPTH EXCEEDS 28". <br />IF GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY FROM STRUCTURE <br />STEEPER THAN 1'-0" VERTICALLY PER T-0" HORIZONTALLY, CONTRACTOR HAS <br />TWO CHOICES: <br />1. PRIOR TO CONSTRUCTION, SEEK GUIDANCE OF FOR TO PREVENT EROSION <br />OF SOIL. <br />2. USE STEMWALL FOOTING <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR Uo <br />FIBERMESH <br />rn O <br />— °°--�-----°— SEE ARCH N � <br />(MAX 16") 00 <br />CN <br />VAPOR BARRIER APEX <br />-� <br />MIN./\/\/\/\/\� N U <br />co 0 <br />CID <br />FOOTING TO BEAR ON /\ / <br />FIRM UNDISTURBED 6" OPT, EXTENSION IN BRICK <br />SOIL LOCATIONS ON FND PLAN N <br />12" UNDER 1 STORY WALL w/ M <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 J <br />BAR IN BRICK LEDGE LL <br />16" UNDER 2 STORY WALL w/ Ltds (2) #5 OR (3) #4 CONTINUOUS J .Q <br />J N <br />true design studios > <br />1 MONOLITHIC FOOTING SECTION z <br />CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE <br />FOLLOWING OCCUR: <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" U 9000 REGENCY SQUARE BLVD. <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY Q SUITE 100, JACKSONVILLE, FL 32211 <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY 0 <br />PER T-0" HORIZONTALLWO PREVENT EROSION OF SOIL. O <br />O Cl)CONCRETE SLAB w/ 6x6 <br />(2) #4 OR (2) #5 CONTINUOUS W1.4 x W1.4 WWF OR W <br />FIBERMESH <br />DoRtH09ON" <br />J <br />LIJ <br />16" VAPOR BARRIER Q <br />3 BEARING WALL FOOTING SECTION z <br />w <br />0 <br />w <br />CONCRETE SLAB W/ 6x6 w <br />W1.4 x W1.4 WWF OR 0 <br />FIBERMESH 00 <br />0'-0" A.F.F. <br />_ SEE ARCH ') <br />' e DETAILS � <br />� <br />LID <br />8" MIN O ' ^ <br />M <br />8"x8" THICKENED 8" WW � W <br />FTG AT <br />STEP-DOWN, SEE VAPOR BARRIER z <br />PLAN <br />4 CURB STEP SECTION m Uj O w <br />w Q <br />w Q O <br />8" UNDER MASONRY WALL Z_ <br />6" UNDER WOOD WALL z Q Q <br />CONCRETE SLAB W/ Z W <br />6x6 W1.4 x W1.4 WWF ILU <br />OR FIBERMESH VARIESv� a <br />SEE ARCH Q LU W <br />(MAX 16") � � <br />e O X <br />\ LL LL 12' MIN \\/\\/\\/\\/\ j Z <br />/\\/\\\/\�\///\//�\\/\\\ 0 Z <br />a <br />VAPOR BARRIER �/\ \ \/ O <br />6 OPT. EXTENSION IN BRICK 0 H <br />LOCATIONS ON FND PLAN a Z_ <br />12" UNDER 1 STORY WALL w/ <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 U LL <br />BAR IN BRICK LEDGE <- <br />16" UNDER 2 STORY WALL w/ w <br />(2) #5 OR (3) #4 CONTINUOUS Abbott Park Q <br />5 GARAGE EXT WALL CURB SECTION 0 <br />CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE Q LOT 004-01-A w <br />FOLLOWING OCCUR: <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" U Z <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY Z <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY 0 <br />PER T-0" HORIZONTALLWO PREVENT EROSION OF SOIL. (n <br />O PROJECT NO: W <br />CONCRETE SLAB W/ 6x6 J 2019.007596 LL <br />W1.4 x W1.4 WWF OR O 0 <br />FIBERMESH Z 0 <br />oRawN. <br />jI 0'-0" A.F.F. SEE ARCH U LDGMV o <br />(MAX 20" <br />d e ° e i — — — DEEP) cHKo: EAF <br />d ° e <br />a 4„ w J <br />° e <br />/ 4" EXTENSION X ,,tf►filll/j��, U) <br />UNDER BRICK VENEER ` �'(1N LqN,''�., <br />12" UNDER 1 STORY WALL �" ��, ,.• �G E NSF•.R ♦♦ice Z <br />VAPOR BARRIER m <br />w/ (2) #4 OR (2) #5 CONT Q � �• O 85 6 •� <br />16" UNDER 2 STORY WALL Z <br />w/ (3) #4 OR (2) #5 CONT <br />6 BEARING CURB STEP SECTION ww 1� :• S ATE OF 4U <br />Z ♦ Fs •< O R O �����Z <br />♦ — <br />•....... <br />TYPICAL REINFORCING <br />BARS AT ENED <br />FOOTING, rS SEE <br />MIN 24" LONG 44 OR #5 <br />BAR SET AT MID -DEPTH <br />OF SLAB, TYP ALL <br />I I RE-ENTRANT CORNERS <br />I II <br />-------------- <br />HOUSE SLAB <br />RE-ENTRANT CORNER DETAIL <br />(RECOMMENDED) <br />PLAN VIEW, DETAIL TYPICAL @ ALL <br />RE-ENTRANT CORNERS <br />NAl- <br />O_ 09-1-19 p <br />F-- W <br />U_ REVISIONS: <br />U- <br />Q No. Description Date w <br />( J <br />} U <br />O 1— <br />Z Z <br />2 O <br />U p <br />w <br />X <br />W STm2mD <br />a_ <br />CMU/METAL CONNECTOR ENGINEERINGQ <br />