Laserfiche WebLink
65'-0" <br />wil <br />56'-0" <br />VERIFY AC COND <br />LOCATION W/ <br />SITE PLAN <br />I <br />0 <br />VERIFY AC CONE <br />LOCATION W/ <br />SITE PLAN <br />FOUNDATION PLAN <br />1/4" = 1'-0" WHEN PRINTED ON 22"x34" <br />2019 V3.0 <br />GENERAL FOUNDATION NOTES: <br />0 <br />+ CONCRETE SLAB ON GRADE SHALL BE MINIMUM 3 1/2" THICK AND <br />p <br />> <br />HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2500 PSI. <br />p <br />C? <br />+ EARTH AND EARTH FILL SLABS GRADE <br />� <br />O <br />MINIMUM BEARING CI <br />ASSUMED TO HAVE A MINIMUM BEARING CAPACITY OF 2,d00 psf, AND <br />0 <br />A��;� <br />C <br />SHALL BE FREE OF ORGANIC MATERIAL AND COHESIVE SOILS. <br />r <br />C\I <br />-C <br />COMPACT THE FILL IN 12" LIFTS TO AT LEAST 95% OF MODIFIED <br />0 <br />D <br />PROCTOR MAXIMUM DRY DENSITY. IT IS THE OWNER'S OR <br />0 <br />CONTRACTOR'S RESPONSIBILITY TO CONFIRM THESE ASSUMPTIONS. <br />• IF CONTRACTOR OR BUILDING OFFICIAL DETERMINES THAT THE <br />p <br />Q <br />SOIL IS NOT SUITABLE FOR 2.000 PSF BEARING CAPACITY. CONTACT <br />I <br />Ct3 <br />EOR. ADDITIONAL FOUNDATION WORK MAY BE REQUIRED. <br />�— <br />• SLIDING GLASS DOOR FRAMES MUST BE RECESSED INTO THE SLAB <br />N <br />IN ACCORDANCE WITH THE BUILDING CODE. CONSULT <br />ARCHITECTURAL PLANS FOR LOCATION OF SLIDING GLASS DOORS. <br />M <br />• MASONRY STEMWALL AND MONOLITHIC FOOTINGS AREAll <br />J <br />INTERCHANGEABLE. SEE SHEET ST-2D FOR ALTERNATE STEMWALL <br />SECTIONS. <br />U_ <br />LLJ <br />+ 24" LONG #4 BAR IS RECOMMENDED TO BE INSTALLED AT ALL <br />J <br />RE-ENTRANT CORNERS, SEE "REtds <br />-ENTRANT CORNER DETAIL" ON <br />J <br />SHEET ST-2D. <br />true design studios <br />z <br />O <br />FOUNDATION KEYNOTES: DC1 <br />U <br />9000 REGENCY SQUARE BLVD. <br />Q <br />SUITE 100, JACKSONVILLE, FL 32211 <br />NOTES APPLICABLE ONLY WHERE SPECIFIED ON PLAN <br />A 8"x8" DEEP THICKENED E 12" DEEP FTG UNDER BOX <br />p <br />p <br />Al EDGE w/ (1) #4 CONT J COLUMN, FTG TO BE <br />PROJECTED MIN 6" AS SHOWN w <br />F-- <br />KC j 16"SQxl2" DEEP FTG D 1, 24"SQx20" DEEP FTG D <br />1 -_...I wi (3) #4 EW (n <br />30"SQx20" DEEP FTG <br />F , 36"SQx20" DEEP FTG <br />0 <br />w/ (4) #4 EW <br />— w/ (4) #4 EW <br />J <br />m <br />G <br />48"SQx24" DEEP FTG <br />H #5 VERTICAL DOWEL TYP <br />AS SHOWN, SEE MASONRY <br />w <br />---� <br />w/ (5) #4 EW, T&B <br />NOTES ON ST-1 <br />Q <br />L <br />1 1/2" SLAB EXTENSION <br />AT FULL ROUGH <br />OPENING WIDTH <br />2" 0 VENT <br />TO EXT <br />I <br />I <br />I <br />I <br />I <br />I <br />lAMI 4 <br />SAN ISO - LH <br />Z <br />w <br />w <br />O <br />p <br />p <br />p <br />ti <br />d' <br />r <br />z <br />U) <br />w <br />z <br />cn <br />m <br />Of <br />w <br />w <br />Z <br />z <br />w <br />0 <br />2" O VENT CC, <br />TO EXT �� O <br />J <br />U_ <br />I <br />Z <br />I O <br />I Q <br />I � <br />O <br />I_ <br />01-1 <br />U <br />IY_ <br />O <br />J <br />I_ <br />Q <br />U <br />z <br />C� <br />O <br />J <br />O <br />Z <br />U <br />w <br />x <br />w <br />a <br />Q <br />m <br />0 <br />O <br />w <br />Q <br />z <br />_O <br />I-- <br />f- <br />U <br /><t <br />U) <br />L IN I YLIY I I V VVIYIYt_V I <br />ABOVE THE CENTER LINE OF {� <br />THE HORIZONTAL DRAIN PIPE O <br />J <br />z <br />W <br />W <br />w <br />rA <br />• <br />W ® <br />0 <br />W <br />WWN/ <br />w <br />x <br />Q <br />L L <br />z <br />z <br />O <br />0 <br />w <br />Ir <br />z <br />-1 <br />I1 <br />ILL <br />w <br />Abbott Park <br />Q <br />U <br />CO <br />LOT 049-03-A <br />0 <br />- -- --- <br />w <br />Q <br />z <br />0 <br />PROJECT NO. <br />w <br />2019.0075999 <br />0 <br />LL <br />DRAWN <br />CRD <br />o <br />-------- <br />---------- 0 <br />CHKD. <br />EAF (n <br />.� L <br />U) <br />5 .• G E,N S •.,� �,� <br />O <br />�� <br />•' <br />NafTEOF <br />- <br /><C <br />- <br />0 <br />ST t4/ <br />:O,n • •� p, ' • �: <br />�101 <br />C/) <br />0 <br />FS; • L 0 R ���:� <br />...... <br />z <br />09125/2019 <br />0 <br />0 <br />w <br />REVISIONS: <br />w <br />No. Description Date <br />~ <br />- ----------------- <br />w <br />J <br />1 <br />' cUn <br />- <br />O <br />I <br />Z <br />..........-`---_-....._.__-- - — ----- --- —..... <br />...: <br />0 <br />CMU/METAL CONNECTOR ENGINEERING <br />