Laserfiche WebLink
Docus,gn Envelope ID 59E322ED-B805-4C40-9CBE-B6588D6B89B9 <br />1 I I J�1 III 'I IIL I I l 11 1 1 ' L ! I III,I_ I F _! 11 11_ 1 <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />EXISTING EXTERIOR CMU <br />TT <br />MIN. 3" EDGE DISTANCE Ll <br />STRIP OF WWF FROM F.F.E. TO <br />MIN. 6" BELOW GRADE. WWF TO J� <br />EXISTING FOUNDATION FACE w/ <br />(2) ROWS OF 3/16' DIA. TAPCONS <br />OR CUT NAILS @ 24" O.C. COVER p ° <br />FLUSH w/ 3000psi CONCRETE. <br />° EXISTING FOUNDATION. <br />� p ° <br />I � D <br />D \ <br />D <br />8" CMU WALL OVERHANGS LESS THAN 1" <br />GROUT BOTTOM 3 COURSES <br />OF EXISTING CMU WALL FOR _ <br />LENGTH OF OVERHANG. FILL <br />TO BOTTOM OF WINDOWSILL <br />WHERE NEEDED <br />MIN. 3" EDGE DISTANCE <br />STRIP OF WWF FROM F.F.E. TO i <br />BOTTOM OF FTG. WWF TO <br />EXISTING FOUNDATION FACE w/ ° p ° — — — — — — — p —A <br />() <br />2 ROWS OF 3/6 DIA. TAPCONS <br />d <br />OR CUT NAILS @ 24" O.C. COVER o <br />FLUSH w/ 3000psi CONCRETE. D <br />° EXISTING FOUNDATION <br />p ° <br />4 � D <br />D \ <br />I ° —A <br />i p <br />8" CMU WALL OVERHANGS 2.5" OR LESS <br />NOTES: <br />• IF EXISTING REBAR DOES NOT MEET 3" EDGE DISTANCE REQUIREMENT, <br />REMOVE INSIDE FACE SHELL OF EXISTING CMU WALL AT ADJECENT CELL <br />AND DRILL & EPDXY NEW FULL HT. VERTICAL#5 DOWEL W/ 12" EMBED INTO <br />EXISTING FOUNDATION AND 4" EMBED INTO EXISTING BOND BEAM. <br />• IF MORE THAN (3) BARS DO NOT MEET THE REQUIRED 3" EDGE DISTANCE, <br />CONTACT EOR. <br />LOCATE AND TIE INTO STEMW <br />REINFORCEMENT IN LAST REIN <br />STEMWALL CELL <br />CMU STEMWALL TO MONOLITHIC TRANSITION DETAIL <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />0'-0" A.F.F. SEE ARCH <br />° <br />— — — — — — (MAX 20" <br />DEEP) <br />EXTENSION <br />UNDER BRICK VENEER <br />12" UNDER 1 STORY WALL VAPOR BARRIER <br />16" UNDER 2 STORY WALL <br />*WARING CURB STEP SECTION <br />CONCRETE SLAB w/ 6x6 <br />W1.4 x W1.4 WWF OR <br />FIBERMESH <br />a <br />VAPOR BARRIER <br />3 BEARING WALL FOOTING SECTION <br />I All uL /'�!'1AITIAl1 IOUS BAR AS <br />" LAP AS SHOWN <br />90 DEGREE <br />CONTINUOUS CONCRETE <br />FOOTING, SEE PLAN <br />TYPICAL STEP IN FOOTING DETAIL <br />CMU STEMWALL MONO LITHIC SLAB <br />8" CMU CHAIR BLOCK W/ (1) #5 <br />CONTINUOUS TO EXTEND MIN 24" <br />INTO MONOLITHIC THICKENED EDGE <br />4" CONCRETE SLAB W/ <br />6x6 W1.4 x W1.4 WWF <br />OR FIBER MESH <br />° #4 OR #5 <br />° ° REINFORCING PER <br />MONOLITHIC FOOTING <br />SECTION <br />° FOOTING TO BEAR ON FIRM <br />4,,° / UNDISTURBED SOIL <br />• STEMWALL FOOTING TO EXTEND MIN <br />12" BELOW MONOLITHIC FOOTING <br />• ADDITIONAL #4 OR #5 VERTICAL TO BE <br />LOCATED WITHIN TRANSITION ZONE <br />ALL FOOTING <br />FORCEMENT <br />CONCRETE SLAB W/ <br />6x6 W1.4 x W1.4 WWF <br />OR FIBER MESH <br />8" CMU CHAIR <br />TOP OF SLAB BLOCK W/ (1) #4 OR #5 CONT. <br />Y <br />— — / <br />�J <br />fn <br />W <br />COLu <br />Q O <br />VAPOR BARRIER \\� <br />LU UJ <br />o to <br />X <br />#4 <br />UPT O 3 COURSES:#5 VERT REINFORCING <br />72" O C �\ � <br />4 TO 5 COURSES: 48" O.C. <br />ADDITIONAL #4 OR <br />FOOTING TO BEAR ON FIRM — / . //� / #5 IN BRICK LEDGE <br />UNDISTURBED SOIL <br />VERTICAL REINFORCEMENT 4" OPT BRICK LEDGE <br />TO HAVE 6" BEND AT BOTTOM NOTED ON FND PLAN <br />CAST -IN -PLACE FOOTING SPECS <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />2 STEMWALL SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />U-0" A._F.F.—__ <br />(BEYOND) <br />FLOATING CONCRETE w U-BLOCK W/ <br />SLAB W/ 6x6 W1.4xW1.4 U J (1) #4 OR #5 <br />WWF OR FIBERMESH > Q Q Cn CONT <br />ti w <br />LU <br />FINISH <br />O GRADE <br />Lo <br />\\ I - \/\\/\\/\\ <br />#40R#5VERTREINFORCING --- ///////�/// ' <br />UP TO 3 COURSES: 72" O.C. \ \\ \\\ <br />4 TO 5 COURSES: 48" O.C. <br />—o <br />FOOTING TO BEAR ON FIRM -- <br />UNDISTURBED SOIL ADDITIONAL E OR <br />G <br />#5 IN BRICK LEDGE <br />VERT REINFORCEMENT TO 4" OPT BRICK LEDGE <br />HAVE 6" BEND @ BOTTOM NOTED ON FND PLAN <br />CAST -IN -PLACE FOOTING SPECS <br />1-STORY: 8" x 16" W/(2) #4 OR (2)#5 CONT <br />2-STORY: 10" x 20" W/(3) #4 OR (2) #5 CONT <br />7 STEMWALL CURB SECTION <br />1. SPECIAL CARE SHOULD BE EXERCISED BY CONTRACTOR WHEN BACK <br />FILLING BEHIND A STEM WALL, PARTICULARLY WHEN IT IS OVER 4 <br />COURSES HIGH. SHOULD THIS CONDITION EXIST, RECOMMENDATIONS <br />MAY BE OBTAINED FROM THE ENGINEER OF RECORD. <br />2. SCREW IN ANCHORS ALLOWED IN MONOLITHIC FOOTINGS ONLY. EPDXY <br />ANCHORS MUST BE USED IN STEMWALL FOUNDATIONS. <br />(1) #4 OR #5 CONT. <br />36" MAX <br />VARIES PER <br />ARCH PLANS <br />\12 <br />M IN <br />6" OPT. EXTENSION <br />IN BRICK LOCATIONS <br />ON FND PLAN <br />3'/2' CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR FIBERMESH <br />MINIM 24" (1) #4 OR #5 90° BEND @ 48" O.C. <br />\ VAPOR BARRIER <br />FOOTING TO BEAR ON FIRM <br />6 ' / UNDISTURBED SOIL <br />b <br />12" UNDER 1 STORY WALL W/ (2) <br />ADDITIONAL NO. 4 OR NO. 5 —�#4 OR (2) #5 CONT <br />BAR IN BRICK LEDGE <br />16" UNDER 2 STORY WALL W/ (3) <br />I#4 OR (2) #5 CONT <br />1 MONOLOTHIC FOOTING SECTION - 36" MAX DEPTH <br />'NOTE': IT IS ACCEPTABLE TO SUBSTITUTE THIS "1A" FTG DETAIL FOR THE "1" <br />FTG DETAIL SPECIFIED ON THE FDN PLAN @ ANY LOCATIONS THAT THE FTG <br />DEPTH EXCEEDS 28". <br />IF GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY FROM STRUCTURE <br />STEEPER THAN 1'-0" VERTICALLY PER 3'-0" HORIZONTALLY, CONTRACTOR HAS <br />TWO CHOICES: <br />1. PRIOR TO CONSTRUCTION, SEEK GUIDANCE OF FOR TO PREVENT EROSION <br />OF SOIL. <br />2. USE STEMWALL FOOTING <br />/�\/�\/'\/1\/1\/ o p <br />\ o <br />VAPOR BARRIER <br />O <br />0*111\ U <br />ALL OTHER EXTERIOR WALL O CY <br />a" <br />CLADDING - MIN 8", U.N.O. ON ARCH O 0 <br />\/ � APES <br />12" MINX/\/\/\/\/\/ N 0 <br />4 � <br />FOOTING TO BEAR ON / <br />FIRM UNDISTURBED 6 OPT. EXTENSION IN BRICK <br />SOIL LOCATIONS ON FND PLAN N <br />12" UNDER 1 STORY WALL w/ co <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 J h, <br />BAR IN BRICK LEDGE LL td <br />CI <br />16" UNDER 2 STORY WALL w/ <br />(2) #5 OR (3) #4 CONTINUOUS J <br />true design studios a) <br />1 MONOLITHIC FOO__TING SECTION z <br />CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE O <br />FOLLOWING OCCUR: Y <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" C 9000 REGENCY SQUARE BLVD. <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY Q SUITE 100, JACKSONVILLE, FL 32211 <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY 0 <br />PER T-0" HORIZONTALLWO PREVENT EROSION OF SOIL. O <br />O <br />CONCRETE SLAB w/ 6x6 Cn <br />(2) #4 OR (2) #5 CONTINUOUS W1.4 x W1.4 WWF OR W <br />FIBERMESH <br />11HOMON' <br />a ° ` m a <br />4/ <br />16" VAPOR BARRIER Q <br />3 BEARING WALL FOOTING SECTION U <br />z <br />W <br />O <br />W <br />CONCRETE SLAB W/ 6x6 <br />W1.4 x W1.4 WWF OR This item has been electronically <br />FIBERMESH signed and sealed by Justin M Lanier, <br />PE on the date and/or time stamp <br />0'-0" P.F.F. � shown using a digital signature. <br />° SEE ARCH I Printed copies of this document are <br />\° DETAILS not considered signed and sealed <br />°>Mby <br />nd the signature must be verified <br />a r a 3rd Party Certificate Authority <br />8" MIN b <br />n any electronic copy <br />W <br />8"x8" THICKENED 8" — <br />FTG AT U) W �/ <br />STEP-DOWN, SEE VAPOR BARRIER W % Of <br />PLAN Z ` LU <br />`�UjO t) <br />4 CURB STEP SECTION m <br />W QW <br />8" UNDER MASONRY WALL Z <br />CONCRETE SLAB W/ 6" UNDER WOOD WALL I Z > Q Q <br />6x6 W1.4 x W1.4 WWF W LIJ 0 <br />LLI <br />OR FIBERMESH VARIES ° SEE ARCH 0 Q , . ' 2 <br />— — — Uj <br />° — °- -- � ° (MAX 16") Lj Wy Ill- <br />4 <br />O L.L X <br />LL <br />12" M I N %\\/\\/\\/\\/\� Z <br />zx\ ° X///VAj/VAj/VAA O <br />VAPOR BARRIE< z <br />R �// ° a /�, // / <br />Of LU <br />6" OPT. EXTENSION IN BRICK <br />LOCATIONS ON FND PLAN a z <br />12" UNDER 1 STORY WALL w/ <br />(2) #5 OR (2) #4 CONTINUOUS ADDITIONAL NO. 4 OR NO. 5 OC <br />BAR IN BRICK LEDGE — <br />16" UNDER 2 STORY WALL w/ Q W <br />(2) #5 OR (3) #4 CONTINUOUS Abbott Park Q <br />)GARAEXTWALL CURB SECTION _j 0 <br />GE <br />CONTACT FOR PRIOR TO CONSTRUCTION IF ANY OF THE Q LOT 035-02 0 <br />FOLLOWING OCCUR: <br />• OVERALL DEPTH OF MONOLITHIC POUR EXCEEDS 28" 0 Q <br />• GROUND ADJACENT TO FTG SLOPES DOWN AND AWAY Z z <br />FROM STRUCTURE STEEPER THAN 1'-0" VERTICALLY _0 <br />PER 3'-0" HORIZONTALLWO PREVENT EROSION OF SOIL. 0 <br />PROJECT NO: W <br />CONCRETE SLAB W/ 6x6 O 2021.011081 <br />W1.4 x W1.4 WWF OR O W <br />FIBERMESH Z DRAWN: O <br />0'-0" A.F.F. SEE ARCH = KAS <br />(MAX 20" C CD <br />\< a ° a ° — ° ° DEEP) X cHKD. MJP U) <br />4„ W W <br />4" EXTENSION X ,yttltlil C) <br />UNDER BRICK VENEER <br />12" UNDER 1 STORY WALL %' ���` ���'' • • • • � <br />w/ (2) #4 OR (2) #5 CONT VAPOR BARRIER m •_,•y�G ENS SF.•.. �Z <br />16" UNDER 2 STORY WALL W _: NO 85166 Q <br />* ; DocuSigned by: ', �' •• <br />w/ (3) #4 OR (2) #5 CONT Z <br />BEARING CURB STEP SECTION O =�•'• ACr�435 <br />6 _- U) <br />• '•�i <br />z sS�DNA1-��%`�, <br />TYPICAL REINFORCING <br />BARS AT THICKENED <br />FOOTING, SEE PLAN <br />II <br />MIN 24" LONG #4 OR #5 <br />BAR SET AT MID -DEPTH <br />OF SLAB, TYP ALL <br />RE-ENTRANT CORNERS <br />— — — — — — — — — — — <br />HOUSE SLAB <br />RE-ENTRANT CORNER DETAIL <br />(RECOMMENDED) <br />PLAN VIEW, DETAIL TYPICAL @ ALL <br />RE-ENTRANT CORNERS <br />SEE NOTES (MAX 16") v <br />STUCCO OR DIRECTLY ADHERED <br />STONE CLADDING FINISH - MIN 6" 6, <br />0 <br />N <br />cn tttttttt���� Q <br />O_ 09-17-2021co <br />p <br />I— W <br />U REVISIONS: LU <br />-- <br />No. Description Date W <br />(n J <br />U <br />(U (A <br />O I— <br />O z <br />= O <br />C <br />W <br />F- <br />x W ST=2mD <br />D_ <br />CMU/METAL CONNECTOR ENGINEERING <br />