Laserfiche WebLink
- - - - - - - - - - - - - - - - - - <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />L.---------------------- <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />J <br />-------------------------------------------------------------------------- <br />L----------------------- <br />I F- � <br />I I <br />-- -- - <br />_ <br />I I I <br />I I I <br />--J <br />I <br />I III <br />------------------------------------- <br />F___� <br />I I I <br />I I <br />_J L------------------------------------- <br />; I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />--------------------------- ---------------------------------------------------------------------- <br />------i r--- <br />I I _ <br />I I I I I I <br />L■_■J � <br />`J I I I I L��J <br />9'-2 1/2" <br />-411 <br />11'-4 1/2" <br />9EN <br />28'-4 1/4" <br />THE BUILDER SHALL VERIFY THAT THE <br />FOUNDATION BEARING SOIL HAS A <br />MINIMUM LOAD CARRYING CAPACITY OF <br />2000 POUNDS PER SQUARE FOOT. IF A <br />LESS SOIL BEARING CAPACITY EXISTS, <br />OBTAIN THE ENGINEER'S RESPONSE <br />BEFORE POURING FOUNDATION FOOTING, <br />AS FOUNDATION REVISIONS WILL BE <br />REQUIRED . <br />RISER <br />4" <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />i <br />I I <br />L - J <br />L J <br />16'-3" LI1_4" <br />3'x3'x 12" DEEP, 3000 P.S.I, <br />CONCRETE THICKENED SLAB <br />FOOTING w/5 REBAR EACH WAY <br />* 12" O.C. <br />,.-; I I IFOUNDAT ION. <br />1816. 1 Termite protection. <br />Termite protection shall be provided by registered <br />termiticides, including soil applied pesticides, <br />baiting systems, and pesticides applied to wood, or <br />other approved methods of termite protection labeled <br />for use as a preventative treatment to new <br />construction, See Section 202, Registered Termiticide. <br />Upon completion of the application of the termite <br />protective treatment, a certificate of compliance <br />shall be issued to the building department by the <br />licensed pest control company that contains the <br />following statement: "The building has received a <br />complete treatment for the prevention of subterranean <br />termites. Treatment is in accordance with rules and <br />laws established by the Florida Department of <br />Agriculture and Consumer Services." <br />1816. 1. 1 <br />If soil treatment is used for subterranean termite <br />prevention, the initial chemical soil treatment <br />inside the foundation perimeter shall be done after <br />all excavation, bockfilling and compaction is <br />complete. <br />1816. 1. 2 <br />If soil treatment is used for subterranean termite <br />prevention, soil area disturbed after initial <br />chemical soil treatment shall be retreated with a <br />chemical soil treatment, including spaces boxed or <br />formed. <br />1816. 1. 3 <br />If soil treatment is used for subterranean termite <br />prevention, space in concrete floors boxed out or <br />formed for the subsequent installation of plumbing <br />traps, drains or any other purpose shall be created <br />by using plastic or metal permanently placed forms of <br />sufficient depth to eliminate any planned soil <br />disturbance after initial chemical soil treatment, <br />1816. 1. 4 <br />If soil treatment is used for subterranean termite <br />prevention, chemically treated soil shall be <br />protected with a minimum 6 millimeter vapor retarder <br />to protect against rainfall dilution. If rainfall <br />occurs before vapor retarder placement, retreatment <br />is required. Any work, including placement of <br />reinforcing steel, done of ter chemical treatment <br />until the concrete floor is poured, sholI be done in <br />such manner as to avoid penetrating or disturbing <br />treated soil. <br />31x31x 12" DEEP, 3000 P.S.I. <br />CONCRETE THICKENED SLAB <br />FOOTING w/5 REBAR EACH WAY <br />0 12" O.C. <br />PLAN <br />1816. 1. 5 <br />If soil treatment is used for subterranean termite <br />prevention, concrete overpour or mortar accumulated <br />along the exterior foundation perimeter shall be <br />removed prior to exterior chemical soil treatment, tc <br />enhance vertical penetration of the chemicals. <br />1816. 1, 6 <br />If soil treatment is used for subterranean termite <br />prevention, chemical soil treatments shall also be <br />applied under all exterior concrete or grade within 1 <br />foot (305 mm) of the primary structure sidewalls. <br />Also, a vertical chemical barrier shall be applied <br />promptly after construction is completed, including <br />initial landscaping and irrigation/sprinkler <br />installation. Any soil disturbed after the chemical <br />vertical barrier is applied shall be promptly <br />retreated. <br />1816. 1. 7 <br />If a registered termiticide formulated and registered <br />as a bait system is used for subterranean termite <br />prevention, Sections 1816. 1. 1 through 1816. 1.6 do not <br />apply; however, a signed contract assuring the <br />installation, maintenance and monitoring of the <br />baiting system for a minimum of five years from the <br />issue of the certificate of occupancy shall be <br />provided to the building official prior to the <br />pouring of the slab, and the system must be installed <br />prior to final building approval. If the baiting <br />system directions for use require a monitoring phase <br />prior to installation of the pesticide active <br />ingredient, the installation of the monitoring phase <br />components shall be deemed to constitute installation <br />of the system. <br />1816. 1. 8 <br />If a registered termiticide formulated and registered <br />as a wood treatment is used for subterranean termite <br />prevention, Sections 1816.1. 1 through 1816. 1. 6 do not <br />apply. Application of the wood treatment termiticide <br />shall be as required by label directions for use, and <br />must be completed prior to final building approval. <br />1816.2 Penetration. <br />Protective sleeves around metallic piping penetrating <br />concrete slab -on -grade floors shall not be of <br />cellulose -containing materials and, if soil treatment <br />is used for subterranean termite protection, shall <br />receive application of a termiticide in annular space <br />between sleeve and pipe. <br />50' - II 1/2 " <br />EN INEEIR'S NOTES <br />0.) ALL WORK TO BE DONE ACCORDING TO 2004 FLORIDA BUILDING CODES <br />WITH 2005, 2006 t 2001 SUPPLEMENTS. <br />(2.) ASSUMED SOIL BEARING CAPACITY TO BE 2000 PSF. SOIL CAPACITY TO BE <br />VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. INFORM ENGINEER OF <br />VARIATIONS. FOOTINGS TO BE EXCAVATED TO CLEAN SOIL, FREE OF VEGETATION <br />AND DELETERIOUS MATTER. CONCRETE SHALL BE PLACED ON AN UNDISTURBED <br />BASE. <br />(3.) IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION <br />PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING AND ITS <br />COMPONENT PARTS DURING ERECTION. THIS INCLUDES, BUT IS NOT LIMITED TO, THE <br />ADDITION OF WHATEVER TEMPORARY BRACING, GUYS, OR TIE DOWNS THAT MAY <br />BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE <br />PROPERTY OF THE CONTRACTOR AFTER COMPLETION OF THE PROJECT. <br />(4.) ALL DIMENSIONS AND ELEVATIONS SHOWN ON THE STRUCTURAL DRAWINGS <br />SHALL BE VERIFIED AND SHALL CONFORM TO THE ARCHITECTURAL DRAWINGS. <br />(5.) CONCRETE : <br />MINIMUM COMPRESSIVE CONCRETE STRENGTH TO BE 3000 PSI IN 28 DAYS. ALL <br />U <br />CONCRETE SHALL BE READY MIXED" AND IN ACCORDANCE WITH A.671. <br />SPECIFICATION C-S4. ALL CONCRETE MODULAR UNITS SHALL HAVE A <br />COMPRESSIVE STRENGTH OF IWO PSI WITH TYPE M OR S MORTAR, 2000 PSI. <br />0 <br />(6.) SLAB ON FILL <br />INTERIOR CONCRETE SLABS POURED ON FILL TO BE POURED OVER WATERPROOF <br />MEMBRANES. ALL SLABS TO BE REINFORCED WITH 6X6 10/10 WELDED WIRE MESH. <br />p, <br />(I.) LUMBER <br />1. STORE LUMBER OFF GROUND. KEEP WELL VENTILATED AND COVERED. <br />0a� <br />2. CURRENT EDITION, ASSOCIATION GRADING RULES GOVERN. <br />3. ALL LUMBER SHALL BEAR GRADE MARK OF AN ASIC BOARD OF REVIEW <br />0 <br />AGENCY. <br />Ln <br />4. ANY SPECIES ALLOWED UNLESS OTHERWISE NOTED. <br />5. SIZES ARE NOMINAL. ACTUAL SIZES SHALL CONFORM TO AMERICAN <br />N <br />LUMBER STANDARD PS 20- 10. <br />C <br />6. MOISTURE CONTENT OF LUMBER 2" OR LESS IN THICKNESS SHALL BE 19 <br />0 <br />OR LESS AT THE TIME OF INSTALLATION. <br />U <br />(8.) TERMITE TREATING : <br />0 <br />SOIL BELOW STRUCTURE TO BE TERMITE TREATED TO A DISTANCE OF 5'-0" <br />0 <br />BEYOND THE PERIMETER LINES OF THE BUILDING. <br />CN <br />(S.)ALL STEEL SHALL BE 40 KSI WITH A MINIMUM CLEAR COVER OF 3" AGAINST <br />SOIL, AND SHALL HAVE A MINIMUM LAP OF 40 TIMES THE DIAMETER OF THE <br />REBAR. <br />_ <br />0 <br />(10.) 2"X12" HEADERS SHALL BE 2-2"X12" LAMINATED W/ 1/2" PLYWOOD GLUED W/ <br />>_ <br />CONSTRUCTION ADHESIVE AND NAILED W/ 5-0160 COMMONS 16" O.C. TO MEET <br />IL <br />LOADS AS INDICATED. <br />U <br />(11.) ALL FASTENERS SHALL COMPLY WITH THE DESIGN LOADS. <br />(12.) CONTRACTOR SHALL HAVE MANUFACTURERS SPECIFICATIONS (CUT SHEETS) <br />ON SITE AT THE TIME OF INSPECTION, FOR REVIEW BY THE BUILDING INSPECTOR, <br />TO MEET LOADS AS INDICATED. <br />V) <br />Z <br />O <br />LIJ <br />0 E <br />R d0 <br />01 � �12 <br />© M <br />ID 0 U. <br />AD°E <br />ac X <br />mE `W <br />s 's <br />' c '• ui p <br />a. 2 'm 3 <br />W <br />«_ C 0 v x <br />r m t' 7 S <br />m 3 d <br />o �,Q <br />Z Fa <br />L v <br />Q LLJ <br />0 U v u- <br />M t, <br />C.o co N <br />�i 00 co <br />C9N <br />A <br />A <br />� �VW� <br />> <br />awCn <br />WOoW <br />'% <br />a O <br />o <br />V � <br />�L <br />d1 <br />� o a <br />Cat q <br />a <br />w A <br />W <br />i� <br />c� <br />z S <br />q Q Z <br />IL N <br />0 1L <br />i z <br />w� U 0 <br />IL O - <br />WLLV <br />o � D <br />Z <br />} LL <br />W = <br />ff L <br />L <br />PROJECT NO. <br />2 000 - 0S <br />DWG NO. <br />