Laserfiche WebLink
11111111111111MILI� 1 1 11,! 1 I� <br />L: _.1.--- _ JI 1. :i I 1 . :1llL1111L ,V <br />THIS DETAIL ONLY REFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH ATTACHMENT. <br />METAL LATH <br />WALL SHEATHING <br />16GAx1-112" LONG (3/4%1" CROWN) <br />STAPLES CW 6" O.C. VERT BETWEEN 1 MAX 1 1. i l 16GAx1-1/2" LONG (34%1" <br />STUDS (NOTED THUS:—) - OFFSET I I I I I CROWN) STAPLES (,) 6" <br />STAPLES BETWEEN STUDS AS SHOWN G.C. VERT INTO STUDS <br />(NOTED THUS:—) <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 14" = V-0" <br />*DETAIL EXCEEDS THE REQUIREMENTS FOR FBCR 703.7.1 LATH' <br />**ONLY APPLIES TO LENNAR TPAJ JAX** <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4"-1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />_ ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" <br />STUB -OUT FOR <br />GAS METER O <br />0 <br />CV <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY"* <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />1U-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-l" <br />(2)16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'4" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />'IT-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />1514" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />Or,co <br />J <br />15/32" CDX <br />0° <br />PLYWOOD OR <br />7/16" OSB <br />RIDGE LINE <br />140 MPH <br />0103 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" <br />WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />a <br />+ + 0.113 <br />INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING <br />DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH 2-3/8 INCH NAIL LENGTH <br />NOTE: * <br />FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL <br />NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />++++t++tot+ttt+++++++tt++ <br />+ <br />+ <br />+ <br />t <br />t <br />+ <br />+ + <br />+ <br />+ + <br />+ + + <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" <br />5000s 1.8/1.7 <br />p nel <br />wood panels <br />Two 3/4" wood panels or 2 x — <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />902.0 <br />2x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking <br />1/8" gap + <br />r <br />+ 5j <br />FILL CELL --A STD. 900 HOOK BOND BEAM <br />ICI®;®�_■�_r <br />-•• <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min. ) Small gap 2" min. <br />2" <br />max. � 4 max. <br />Clinch nails <br />when <br />possible 1 <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 2" min. <br />required when indicated or 4" max. <br />2x-: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING Ys" GAP @ TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />DOUBLE JOIST CONNECTION -Birdsmouthcuts. N.T.S. <br />top flange of joist. <br />- Under 2nd floor column w/ loads <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />details in <br />One 10d box <br />areas=20 of high <br />or-20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) �J <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES --- <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Ilse T 11 Offs nails st 6" n-r- <br />Provide adequate bearing <br />for each lapped joist. <br />10dnails SECTION @ IN BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />Web Stiffener Fastener Schedule <br />Joist Bearin Location <br />Series Depth End Intermediate <br />® <br />BC15000s <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />- <br />BCI6000s <br />BCI6500s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />-16d <br />3-16d <br />14" <br />5-16 <br />5-16d <br />16" <br />6-16d <br />I 6-16d <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 pif max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />Plumbing <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. <br />I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration.— <br />t$t l:U I ANTVVritMt IN CANTILEVER <br />THE WEB. PROVIDE AT <br />LEAST 3" OF CLEARANCE <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1V <br />DO NOT CUT HOLES <br />LARGER THAN 1Y" <br />ROUND IN <br />CANTILEVERS. <br />Round Hole Diam_4er (in) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />8.875 <br />10 <br />11 <br />12 <br />13 <br />Rectangular Hole Side (in) <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />Any 16" joist <br />Span (ft) <br />8 <br />V-0" <br />V-1" <br />1'-2" <br />V-2" <br />1'-3" <br />1"-3" <br />V-7" <br />1'-11" <br />2'-4" <br />2'-9" <br />S-2" <br />3'-7- <br />12 <br />1'-0" <br />V-1" <br />V-2" <br />V-2" <br />V-3" <br />V-9" <br />2'4" <br />2'-11" <br />3'-7" <br />4'-2" <br />4'-9" <br />5'-4" <br />16 <br />V-0" <br />V-1" <br />1'-2" <br />V-2" <br />V-7" <br />2'-5" <br />3'-2" <br />3'-10" <br />4'-9" <br />5'-7" <br />6'-4" <br />7'-2" <br />20 <br />1'-0" <br />11 <br />'-" <br />1'-2" <br />V-2" <br />2'-0" <br />3'-0" <br />4'-0" <br />4'-10" <br />5'-11" <br />6'-11" <br />7'-11" <br />8'-11" <br />24 <br />1 "-0" <br />1'-1 " <br />1'-2" <br />1'-3" <br />2'-5" <br />3'-7" <br />4'-9" <br />5'-10" <br />7'-2" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1Y" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Y" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />install tight to top flange. <br />�✓ \ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />o depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />SIMPSON MGT <br />w/ (22)10d <br />NAILS TYP. �GIRDERTRUSS <br />2X TOP PLATE <br />5/8"0 <br />THRU <br />BOLT <br />2 X B.U.0 <br />SIMPSON MGT <br />w/(22)10d <br />NAILS TYP. <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />HETAL20 INSTALLATION <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />SLEEVE THRU STEMS <br />SEE PLAN FOR °• a . • .; . • • <br />FOUNDATION INFO ` ° a' <br />STEM FOUNDATION <br />GRADE REINF. SEE PLAN <br />e <br />v — 1 <br />I II Wig, <br />AUG 4 202Z <br />VR/\ <br />vIATUAL AEvIEV4 ASSIS <br />Virtual P.evie�,v AspI:", <br />" <br />PlanS Review CoiT10P" <br />for compliance with the <br />Edition by Debra Anne Klahr PX2360 <br />fvtJ l,riAot 4 rvV <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A (WHEN <br />w/ (18)10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @PIPE PVC OR SCH40 SLEEVE <br />PENETRATION <br />1 v <br />4 I a <br />a a I A d �" <br />1 I <br />F_ I <br />SEE FND. PLN. <br />SIZE & REINF. <br />BELOW <br />GRADE PIPE VERTICAL THRU FND. <br />G <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE PLUMBING LINE <br />PENETRATION I <br />I <br />iD ••e• • <br />.d <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />d a a n <br />--- d --.— -- V. E/ as G <br />---\ <br />a—WTT <br />a a <br />SEE FND. PLN. <br />SIZE & REINF. <br />N <br />W 4:o <br />J <br />LO <br />ocry, <br />A � r <br />r, V <br />E �• <br />O <br />x <br />W <br />o: <br />z <br />Q <br />^N, <br />> Or- o LO <br />0 CO4 6 <br />to <br />j3 <br />�/ 7. co d M <br />� U <br />0 25 <br />_ <br />� 0 u- 8 <br />s a� <br />.N <br />n' <br />2 <br />w dv o <br />V N c <br />O M 2 <br />W <br />i` <br />a � <br />LU W <br />CA) W0 <br />Q WW[Ya Z� <br />W jtL(nS�J ¢ <br />a9 <br />V°L <br />(D <br />Q~ <br />aC1 <br />0XLL00LL <br />OZ20H dWLL u_ <br />OCOo 02OOm <br />QzLL <br />—JZ0 <br />°z <br />0 <br />CO OZ0 <br />Lu _a, <br />zZUiaY00Z_W <br />_J W 2W0°a. <br />0 <br />aW <br />Oa: 0 D Z <br />LLa O eau_ <br />It <br />0 <br />ZCN <br />LU <br />0� <br />O <br />QU) <br />M <br />CIO <br />�f <br />� LL <br />ti <br />t0 <br />I— W � C+M <br />00 <br />Z U <br />W <br />LIJ <br />JQ <br />N <br />N <br />O <br />N <br />ti <br />N <br />r <br />0 <br />O <br />00 <br />MCD <br />CO <br />N <br />CD <br />NO <br />NO <br />O <br />O <br />NCV <br />O <br />O <br />N <br />O <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />d' <br />G <br />r- <br />CA <br />O 00 <br />M <br />� <br />O <br />H <br />N <br />O <br />M <br />(0 <br />0 <br />CD <br />C <br />'^ <br />4) <br />o <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Cr <br />CO v�J <br />Z Z <br />—ZO <br />O�0 <br />-F- <br />W <br />°wwin <br />v 5: <br />O <br />V��a <br />F— <br />O Ii <br />^ <br />i.i <br />' ^ <br />VJ <br />OW <br />CL <br />Ha <br />I— <br />�� < <br />Z <br />I..— <br />I= <br />W =) <br />in 0 <br />Z <br />N <br />V <br />Z 3: J <br />00 <br />�awo <br />�2ZW <br />LL <br />N <br />�— <br />LLI N <br />Og�z <br />UU)Z� <br />0�. <br />Q <br />Z <br />Z <br />0 <br />U <br />_%ke <br />0 <br />0 <br />:50 <br />m <br />Z <br />Q <br />Z <br />Z <br />J <br />W M <br />" <br />LAST PLOT DATE <br />>N <br />N a <br />Apr. 25, 22 <br />O <br />STRUCTURAL <br />J <br />DETAILS <br />