My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6347 Back Forty Lp
Zephyrhills
>
Building Department
>
Building Plans
>
6347 Back Forty Lp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:29:39 AM
Creation date
2/19/2025 11:38:52 AM
Metadata
Fields
Template:
Building Plans
Street #
6347
Location
Back Forty Lp
Contractor
Lennar Homes LLC
Building Plans - Permit #
6406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) LAYERS ASTM TYPE 11 OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE 11 OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />12 <br />PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROO <br />SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FL OR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 13/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP W13 <br />(2) TOP PLATE W1 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />LU <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />W <br />16" O.C. 2X S.P.F. STUDS <br />in <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />0 co <br />718" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W1 (2) 1 Od @ 6" O.C. <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />METAL LATH, FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />W <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL <br />W <br />1114OULArION PER <br />1/2" GYP. WIB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB, — <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA :5 1000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEA;;pos- <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYST <br />--METAL <br />SEAT <br />ER PLAN <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />V ifl <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 13/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" OIC <br />CEILING & 8'01C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.C: <br />BASEBOARD <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />4 <br />�!E A <br />M I I- EI I IEI I IEI I <br />'A <br />H <br />IEI I IEEI I M I I= I _11 . 4 <br />111-111 <br />6x6 W1AXW1 4 <br />4 <br />WWF OR FIBERMES <br />STD. 90 NOOK (SEE DETAIL) <br />8"X8"X1 6" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />.�ARCHITECTURAL <br />FINISH <br />(1) #5 VERT, IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />CY) <br />LL <br />ULI <br />0 <br />4"A" INSPECTION PORT AT <br />m <br />=i <br />a. <br />EACH FILL CELL TYPICAL <br />W <br />U) <br />CL <br />m <br />AT GARAGE CONTRACTOR <br />CY) <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />4"to 6" BELOW GRADE <br />:INISH GRADE <br />00 <br />(3) # 5 REBAR 0 \-STD.90*HOOK <br />W/3" MIN. CLEARANCE 4" 1 14 <br />N 3" CHAIR5 (SEE DETAIL) <br />b <br />TYP 2-STORY WALL "'""ECTION-- <br />SCALE: 3/4"=1 <br />C? <br />CD :2� <br />B <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL ------ <br />BAND JOIST <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1 st FLOOR WALL- <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />,TE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY, <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. <br />�6 <br />E <br />S6 <br />2x STUDS @ 1- <br />2"x BOT. PLATE <br />(2) 1 Od @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSE <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />-1 6d <br />2X4 RIBBONS, EACH W/ 4 <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUR <br />SIMPSON HETA20 w/ (8) 1 0dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN, 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1 ST FLR. SEE JIS6 SCALE: 3/4"=V-0" S6 <br />FOR ADDITIONAL INFORMATION. <br />Lu <br />LU <br />= <br />co <br />m <br />0 <br />U) <br />p—mwnm—mq <br />15/32" OSB <br />EXPOSURE1 <br />�x <br />SHEATHING <br />_x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />0 SECTION X-X IF <br />I <br />LU <br />NOT FULL <br />_j <br />HEIGHTSHEET--/I <br />2 <br />a) <br />Z <br />FLOOR <br />SYST <br />IM <br />(2)- 2x TOP PLATE <br />BEYOND <br />__15/32" SB <br />EXPOSUREI <br />F <br />SHEATHING Lij <br />LU <br />DLI :D 2x <br />C <br />LOCKING @ ALL <br />C <br />SHEATH 0 <br />ING <br />U) <br />EDGES( <br />OPENING <br />I I SECTION X-X) <br />SEE <br />0 <br />r <br />_x <br />Fr Ly <br />T!7 <br />_x <br />7 <br />—.@ <br />LU <br />_2xSTUDS LU <br />BEYOND. <br />SEE PLAN 0 <br />0 <br />j_jU <br />U) <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL \_�HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM %A1A1 I r-1 r-%1A'r1^k1 MIA^MARA <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />3/4"l 1/2" <br />S /2) S <br />S <br />N <br />S <br />J�12 <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO wl (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />A STAGGERED FOR SHEATHING <br />SECTION X-X <br />2x CRIPPLES @ <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />T T DA D R BLOCKING AT ALL EDGES. A MINIMUM 8" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />LU <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAW/8". <br />E <br />NAIL AT BASE 2 ROWS @ 4" O.C. wl 8d COMMON NAIL <br />0 <br />NAILAT TOP PLATE TWO ROWS@ 4" O.C. wl 8d COMMON NAIL <br />Z <br />LL <br />(D NAIL OPENING PERIMETER wl (2) ROWS@ 4" O.C. w/8d COMM <br />0 <br />@ NAIL INTERIOR AT 6" O.C. W/ 8d COMMON NAIL. <br />U) <br />STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />w/ 8d COMMON NAIL <br />� LU <br />0 D <br />1-0 <br />Uj U>- <br />PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADEF <br />CF <br />OM F <br />wl 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />< LE U , U) <br />0 co ca <br />@ (2) 8d NAILS @ Y O.C. TO EACH TRUSS END OR @ VERTICAL <br />U� <br />Z cn W 0 0 <br />N LU <br />MEMBER IF GABLE END <br />L�: 7 LL <br />_(n <br />NOTE: <br />WALL SHEATHING INSTALL. <br />rc <br />� �6 &NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED@ 12" O/C FOR <br />2"x`10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />\-- <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />e EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W1 (2) <br />12d TOENAILS <br />o OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE wl SIMPSON <br />LS30 w/ (6) 10d x 11/2" EACH SIDE <br />STUDS TYP. <br />P.T. BOT. PLATE <br />RIBBONS <br />FLOOR TRUSS <br />DETAIL (FLOOR TRUSS) O� <br />SCALE: 1 1/2"=V-0" <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR ",,- <br />SPECS ON FLOOR <br />2ND FLOOR FRAMING SEE <br />ADDITIONAL INFORMATION <br />SECTION J/S6 <br />1/2" GYP. W.B. MIN. @ <br />DECKING -\ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />ATTACHED WALL SHEATHING <br />HGT. FOR WALL HGT. :5 8'-6". (2) <br />TO BOTTOM PLATE/CHORD W/ 8d <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />@ 4" O/C, 2 ROWS STAGGERED <br />PTS FOR WALL HGT. > 8'-6 <br />EMBEDM ENT @ 24" O.C. W/ <br />17, <br />SIMPSON SP1 W/(10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />FLOOR TRUSS SEE FRAMING PLAN <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />FLOOR TRUSS <br />SEE FRAMING <br />WEEP SCREED <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />PLAN <br />INSTALLED PER MANUF. <br />jj�. <br />2"x4" CROSS BRACE @ 48" <br />SIMPSON HETA20 w/ (8) 10dxl 1/2" <br />4<. <br />-11 1=1 117 <br />O/C FOR THE 1ST 2'-0" OF <br />NA ILS @ 24" O.C. INTO TRUSS <br />IEI <br />END WALL W/ (2)1 0dx3" @ EA, <br />BLOCKING & MIN. 4" EMBEDMENT <br />�: <br />�_11_11_101 <br />I <br />END INTO 2"x4" BLOCKING <br />IN KO BLOCK <br />I M I I E El I IEI I IE <br />E I ff <br />. I I= <br />III.,, IMIMIM11 <br />p- <br />111 (3) #5 CONT. ON 3" <br />SEE DETAIL 202 FOR <br />111 <br />8" <br />8" CHAIR W1 3" MIN. <br />MORE INFORMATION <br />CLEARANCE <br />2ND FLOOR FRAME CONNECTION / �R, <br />INTERIOR 2-STORY FRAME SECTION le`*�S <br />PARALLEL TO MASONRY WALL <br />SCALE: 3/4"=V-0" <br />�6 <br />SEE TYP. 2-STORY WALL SECTION FOR <br />SCALE: 3/4"=V-0" <br />1\16� <br />SEE TYP. 2-STORY WALL SECTION <br />ADDITIONAL SLAB INFORMATION. <br />FOR ADDITIONAL INFORMATION. <br />BEA <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.0 W/ 2"DIA <br />x 3/16" PLATE WASHER'(MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W1 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />4' <br />4 <br />E q <br />Cl) A <br />4-. <br />71 <br />. 11 <br />4 A <br />4 <br />(3) # 5 REBAR ON 3" CHAIR 4" V-8" <br />W/3" MIN. CLEARANCE <br />A <br />LTERNATE FOOTING <br />M <br />S6 <br />8d NAILS FOR WALL SHEATHING MUST BE MIN.131" X 2 112" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />V4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1)LSTA30 <br />4-4 <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W1 TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 W/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />co <br />F NISH GRADE <br />0? <br />@ WOOD 1ST FLR. SEE J/S6 FOR <br />SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />2� <br />MAY 3 B 2023 <br />\/V\ <br />V Virtual Review Assist Inc <br />Plans Review completed an'd ap" ir <br />p ved <br />ior compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />co <br />I I e.. <br />AIYe <br />LO <br />0 <br />00 <br />0 1 <br />Ul) <br />0 <br />z <br />LU <br />0 <br />0 <br />LU <br />Q� <br />a <br />z <br />< <br />0 Q LO E <br />> 0 0 <br />0 q U <br />(y) 2� <br />mav cy) Cq <br />V) <br />.iii_ <br />4-- :3 <br />U -0 <br />:E <br />E 0 <br />Z) 0 U 0 <br />o 8 0 <br />0 U- 0, < <br />0 < <br />C) <br />ci <br />V) U LU a <br />OC) <br />co <br />70 70 <br />W W <br />0 W <br />0 Ld Cl) U.1 0 <br />LU LU _j LIJ 2 1.- 0 <br />UJ �-:< [g Q�g�ezw z <br />x 0 0 _j <br />:D 1 0 U0 0 <br />0� <br />< < 0 <br />Cn U<) 00 <br />CY X Of 0 0 -:� �- <br />0 < z U-"U- z 2 -, I— <br />EE 0 <br />F- <br />0 0 <br />U) 8E Of 0- z,;0 0 0 co z <br />LU LU , � LU-= Z :) <br />(D EL > W Uj�w �_ (n , x < 0 <br />a. Z ��Cl Z <br />C/) 0 z <br />LL <br />_j z 0 Lj L) <br />� < 0 LU III z <br />0 Uj m � W 2 0 <br />W Ej 5 <br />0 <br />UL < U_ <br />0 <br />CN <br />W <br />4 <br />> U) CD <br />co (=:) <br />CV) <br />C/) <br />_j U? <br />0- Cf) <br />I <br />LL 1�31 <br />U) - I-, <br />z <br />Li < L(? <br />0� 0- co <br />a- r-- <br />< >- < 00 <br />z C) <br />z <br />W <br />U-1 <br />C:) <br />C:) <br />04 <br />C14 <br />m <br />C14 <br />CY) <br />C14 <br />0 <br />04 <br />C) <br />N <br />C) <br />04 <br />P-� <br />CN <br />1� t' <br />4 <br />0 <br />0 <br />0 <br />0 <br />C:) <br />00, <br />Q <br />CD <br />(0 <br />- <br />00 <br />- <br />0 <br />04 <br />C) <br />N <br />C) <br />N <br />N <br />CNI <br />C) <br />C� <br />C) <br />2 <br />0 <br />C� <br />C) <br />C� <br />CD <br />�4 <br />C) <br />C� <br />0 <br />N <br />0) <br />N <br />CD <br />LO <br />00 <br />CD <br />CY) <br />v-- <br />V-- <br />04 <br />6 <br />M <br />U <br />C) <br />C <br />4 <br />:, <br />4" <br />CD <br />CD <br />6 <br />6 <br />11 <br />(6 <br />0 <br />N <br />U-) <br />E <br />0) <br />> <br />0 <br />CD <br />CD <br />C6 <br />C) <br />14 <br />0 <br />L6 <br />C) <br />6 <br />CD <br />pl� <br />U") <br />00 <br />z Z <br />z <br />0 <br />-6-0 <br />�_j <br />LU <br />W LU U) <br />5: <br />0 <br />C) <br />0 <br />< <br />0 <br />-0 <br />0 <br />Ix Uj <br />-r <br />LO <br />-0 <br />CL <br />LU F- I.� <br />0 <br />W <br />0 <br />< <br />00 <br />F- = z <br />.4 <br />r <br />(D <br />0 t= III <br />z �: _j <br />00 <br />5. <br />>_ ry <br />W 0 <br />z <br />z Z <br />Lf) <br />LU <br />0 <br />< < <br />_j2z <br />>_ <br />CD <br />< <br />( <br />CL >_ W <br />U) Z U) <br />z <br />z <br />< 0 <br />Irmy <br />. . <br />z <br />0 <br />_�e <br />0 <br />j <br />0 <br />0 <br />00 <br />z <br />z <br />z <br />14 <br />W <br />Lce) <br />(.0 <br />C-,4 <br />LAST PLOT DATE <br />> <br />Apr. 24, 23 <br />0 <br />STRUCTURAL <br />DETAILS —MONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.