Laserfiche WebLink
U 4,� k",AtfliILL- <br />LO <br />LO <br />LO <br />12 <br />9 <br />UT <br />39 <br />42 <br />!;2 <br />8 <br />LQ <br />C14 <br />E <br />1�0 <br />_5 <br />12 <br />.2 <br />0 <br />11 1 91 <br />5:� <br />9 <br />C�. <br />SO <br />as <br />ROOF FLASHING AND ROOF FLASHING COMPONENTS <br />TO BE IN ACCORDANCE w/ R903.2, FLORIDA BUILDING <br />CODE 7TH EDITION (2020) RESIDENTIAL <br />12 <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 13/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8"O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2X S.P.F. TOP PLATE - ATTACH 2x STUDS <br />TO TOP PLATE W/ (1) SIMPSON SP2 TYP. @ <br />CORNERS, SP2 MAY BE SUBSTITUTED W/ (1) H2.5A <br />2X BLOCKING @ EA. WALL <br />SHEATHING JOINT <br />16" O.C. 2X S.P.F. STUDS <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED AND NAILED W1 10d <br />COMMON @ 6- O/C EDGES AND 12" O.C. FIELD <br />1/2"GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W <br />OSB (DRAFTSTOPPING) TO BE NAILED W/8d <br />COMMON @ 6"O/C TO ONE SIDE OF THE FLOOR TRUSS FOR <br />AN AREA :5 1000 SQ. FT. OF FLOOR AREA & SEALED <br />PENATRATION AREA W/ FOAM. DRAFTSTOPPING SHAL�,� <br />DIVIDE THE CONCEALED SPACE INTO APPROX. EQLI�t <br />AREAS. v I <br />FLOOR SYSTEM <br />\,PER PLAN <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X- @ GARAGE ONLY) W/ 13/8- <br />DRYWALL NAILS OR DRYWALL SCREWS 7"O/C <br />CEILING & 8'O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOT70M OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.C: <br />BASEBOARD <br />t--j 1 <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />4 <br />E, <br />4 4 . . <br />r <br />4. <br />A- <br />WWF OR FIBERMES <br />6X6 W1.4xW1.4 <br />RMES� - M11 I I <br />:FOR UNDERLAYMENT <br />REQUIREMENTS SEE R905.1.1 <br />PRE ENGINEERED WOOD TRUSS @ 24" O.C. MAX. <br />HURRICANE ANCHOR @ EACH TRUSS <br />SHINGLE ROOF, SHINGLES TO BE IN <br />ACCORDANCE w/ ASTM D7158-CLASS G or <br />H, or ASTM D3161 -CLASS F, IN <br />ACCORDANCE w/ TABLE R905.2.6. 1, <br />FLORIDA BUILDING CODE 7TH EDITION <br />(2020) RESIDENTIAL <br />ROOF SHEATHING - SEE <br />SCHEDULE - [RSH] - ON <br />FRAMING SHEET FOR <br />SHEATHING AND FASTENERS <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE STRUCTURAL SOFFIT SHEET SS <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1X2 NAILER <br />PLYWOOD SHEATHING <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />FOR MORE INFO <br />0 U.1 <br />0 <br />9-ca— 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W1 TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />-J LU <br />=) LU LAYER 1/8" THICK. <br />U- z: <br />INSULATION PER <br />CHART ON FLOOR PLAN <br />(13 �R <br />ETAL SEAT <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />OF <br />P� <br />M( <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X1 6" CONIC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />U.1 <br />4-x4" INSPECTION PORT AT <br />cr <br />a. EACH FILL CELL TYPICAL <br />W <br />CO <br />AT GARAGE CONTRACTOR <br />in <br />TO CUT BLOCK OR POUR <br />7 <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />410 6" BELOW GRADE <br />:INISH GRADE <br />6 <br />\-STD. 90'H <br />OOK <br />(SEE DETAIL) <br />(3) # 5 REBAR ON Y CHAIR <br />W/3" MIN. CLEARANCE 41- 11-8" <br />TYP 2-STORY WALL SECTION ri <br />REV. 03.16.21 SCALE: 3/4"=1I-0" S6, <br />SIMPSON LSTA24 STRAP w/ (8) 10d X 11/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 11/2" <br />NAILS TO STUD & (8) 10d x 11/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL ------ <br />*SIMPSON LTP4 W/ <br />(12) 8d A 1/2" NAILS <br />@ 24" O.C. <br />lstFLOORWALL' N \ <br />Ux <br />SIMPSON LSTA24 STRAP W/ (8) <br />10dx 11/2" <br />NAILS TO STUD & (8) 10d X 1 1/2"TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />SCALE: N.T.S. <br />@ WOOD 1 ST FLR. SCALE: N.T.S <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />6TE W/ <br />O.C. <br />)OR TRUSSIJOIST <br />2x STUDS@ 1 <br />2"x BOT. PLAT[ <br />(2) 10d @ 6" OX <br />PRE-ENGINEE <br />FLOOR TRUSI <br />A FLOOR CONNECTION <br />S6 @ MASONRY 1ST FLR. SEE J/S6 <br />FOR ADDITIONAL INFORMATION. <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6- O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />'IT" <br />CORNER <br />WPICAL 'IT" AND CORNER <br />DETAILS <br />LE: N.T.S. <br />SCA <br />�6 <br />E <br />S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />m 2:S1 TO B0170M PLATE/CHORD W/ 8d <br />@ 4- O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />SEE FRAMING WEEPSCREED <br />PLAN INSTALLED PER MANUF. <br />2-x4- CROSS BRACE @ 48--SIMPSON HETA20 W/ (8) 1 0dX1 1/2" <br />O/C FOR THE 1 ST Z-O" OF NAILS @ 24- O.C. INTO TRUSS <br />END WALL W/ (2)1 OdxY @ EA. BLOCKING& MIN. 4"EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION �R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" I\, �6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />u <br />WEEP SCREED u <br />3 <br />U <br />INSTALLED PER. MANUF. I C <br />C <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KID BLOCK <br />15/3? OSB <br />EXPOSURE I <br />SHEATHING <br />PROVIDE <br />x <br />BLOCKING AS <br />f <br />REQUIRED PER <br />r <br />a SECTION X-X IF <br />W NOT FULL <br />HEIGHT SHEET- <br />U) <br />L <br />i <br />G FLOOR SYST <br />I <br />M <br />(2)- 2x TOP PLATE <br />BEYOND <br />I <br />— <br />15132"OSS <br />EXPOSURE1 <br />F <br />SHEATHING Lu <br />x <br />SOLID 2x 0 <br />BLOCKING a ALL :03 <br />nc <br />SHEATHING 0 <br />m <br />=��, <br />EDGES (SEE <br />OPENING <br />... <br />-i <br />SECTION X-X) <br />W <br />(L 0 <br />C <br />Fx w <br />23 <br />tu- <br />H <br />-2xSTUDS W <br />BEYOND. <br />1 <br />SEE PLAN <br />0 <br />Lj <br />\-2x4 P.T. BASE <br />N�'-�HORIZONTAL PLATE BEYOND <br />2x RIBBON OR VERTICAL SEE PLAN <br />BLOCKING <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />B 3/8" "S"- NAIL 318" <br />SCALE: 3/4"=1'-0-- SPACING <br />',_, �6 <br />S S 314" S <br />1 1/2" <br />1/2" <br />S <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />RIBBONS <br />DETAIL (FLOOR TRUSS) 60"� <br />SCALE: 1 1/2"=V-0" <br />NOTE: SEE TYPICAL WALL <br />I SEE SHEATHING <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION SPECS ON FLOOR <br />1/2"GYP. W.B. MIN. @ <br />2x BLOCKING HORIZONTALLY---� GARAGE SIDE IF APPLICABLE <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />@ INTERVALS NOT <br />EXCEEDING 10--0" (R302.1 1) EMBEDMENT @ 24- O.C. W/ <br />SIMPSON SP1 W/ (10) 10d 2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />NAILS AT EA. STUD <br />2 x STUDS@ 16"O.C. TYPICAL TENSION 2600#.) <br />2X P.T. PLATE 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />-A' <br />A. <br />WA A - 'A <br />(3) #5 CONT. ON 3" <br />11-8.1 8" CHAIR W/ 3" MIN. <br />8. -J CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />AT ALL PANEL BLOCKING <br />!LOCATIONS SHALL BE MIN 20 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FUTCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3- O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />M 1� �Ikl �01441'1 <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8"OIC TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE <br />PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM X" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />LU <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />-i <br />PENETRATE SURFACE MORE THAN Ye'. <br />NAILATBASE2ROWS@4'0.C.W/8dCOMMON NAIL <br />NAIL ATTOP PLATE TWO ROWS@ 4- O.C. w/8dCOMMON NAIL <br />z <br />LL <br />@ NAIL OPENING PERIMETER w/ (2) ROWS @ 4- D.C. vd 8d COMMON NAIL. <br />0 <br />@ NAIL INTERIOR AT 6- O.C. w/ 8d COMMON NAIL. <br />, <br />STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />w/ 8d COMMON NAIL <br />a 03 2 <br />Lu LL f- 0 x <br />PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />CF <br />>- 0 <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />er t; 0 0 U) <br />t; 0 U' :R <br />2LL <br />@ (2) 8d NAILS IS 3- O�C. TO EACH TRUSS END OR @ VERTICAL <br />z <br />0 <br />MEMBER IF GABLE END <br />X 5 <br />U. <br />NOTE: <br />C� WALL SHEATHING INSTALL. <br />&NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED@ 12" O/C FOR <br />241A 0" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE W/ SIMPSON <br />LS30 w/ (6) 10d x 11/2" EACH SIDE <br />'09 <br />0 41AIQO'9 <br />1 >vl <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEAR I NG/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS <br />2x BLOCKING HORIZON ALLY <br />@ INTERVALS NOT T <br />EXCEEDING 10--0- (R302 <br />.11) <br />518"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24- O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />1 <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />- - A -. " \ <br />A A . �A 4-*- <br />. . <br />Cn <br />A <br />711. .11, 8-7. <br />(3) # 5 REBAR ON 3" CHAIR 4" 11-8H <br />W/3"MIN. CLEARANCE <br />ALTERNATE FOOTING <br />m <br />S6 <br />0 8d NAILS FOR WALL SHEATHING MUST BE MIN. 131"X 2 112" <br />0 DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2"x4"WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1-4 <br />1 <br />(1) <br />(2) <br />(1) LSTA30 <br />4--9- <br />j2) <br />3 <br />#2 <br />(2) <br />(2) <br />(1) LSTA30 <br />(3) <br />3) <br />(2) <br />(3) <br />(2)LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" OIC <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />318"THICK EACH. 3RD LAYER 1/8"THICK. <br />SIMPSON SP1 W/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />a <br />00 <br />FINISH GRADE <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />C14 <br />CL- <br />Cf) C= <br />L- C= <br />C-7 <br />C�4 <br />0- <br />:7 12 m = - <br />C-4 <br />- to '0 <br />- 0 g <br />2 <br />C2 <br />-E <br />U1 <br />W <br />40 <br />'V- <br />eo, <br />t it, 0\, <br />To the best of Me Engineer's knowledge, Infoffnafion and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential <br />7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's <br />signature and seal. <br />a <br />Is g(-, <br />. <br />N 6 CD <br />0 C 4 <br />. <br />0 -.-- �; '? $ <br />0 r-- - V R <br />0 N 0 , % <br />rd -5-1 LU <br />CqLLU-1 . 0. <br />Lu <br />z co <br />4 <br />I i Aml 0 <br />C14 <br />W 2 Cr <br />A M Z; 0 <br />1 <br />GO 6 <br />LO Z < <br />M <br />UmI- <br />Um <br />C14 . � 0 <br />0 <br />z 0 <br />C-D <br />< <br />V11 <br />Co <br />Q) (D <br />U. <br />4--J C—/� d <br />ra <br />Fm <br />U <br />0 <br />Ln <br />Ln <br />LU <br />< <br />co <br />0 <br />r. 9 <br />z9 <br />3z <br />E <br />E 8 <br />cc <br />520 <br />E <br />0 8 <br />z <br />CD <br />CN <br />" . <br />�z <br />Lq <br />wx <br />m <br />C <br />mo <br />2-, <br />z <br />�z <br />w <br />m <br />o21 <br />8 <br />�z zz <br />W <br />CL <br />w <br />zjz <br />< 9 <br />9 <br />-0 <br />C=) <br />6j 1 w <br />0 <br />LO <br />LO <br />6 <br />0 <br />T <br />m <br />L0 <br />co <br />j M <br />r11 <br />Cn <br />Cr C.) <br />C) <br />Ir- <br />U) 0 <br />Cq <br />LO <br />< <br />4 a <br />0 <br />LO <br />C14 <br />ol <br />0 <br />LO <br />U11) <br />< <br />E <br />(0 <br />C L0 <br />0 <br />z <br />z <br />E 1— <br />JOB <br />NO: 22-06468 <br />SCALE AS NOTED <br />SHEET NO. <br />S6 <br />(MONO) <br />