My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7540 Gall Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7540 Gall Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 11:46:03 AM
Creation date
2/19/2025 11:47:38 AM
Metadata
Fields
Template:
Building Plans
Street #
7540
Location
Gall Blvd
Contractor
Stewart Perry Company Inc
Building Plans - Permit #
9208
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND SERVICE NOTES: <br />1. PRIOR TO STARTING ANY UNDERGROUND SERVICE WORK, THE <br />CONTRACTOR SHALL CONTACT THE LOCAL ELECTRICAL UTILITY <br />SERVICE REPRESENTATIVE AND COORDINATE REQUIREMENTS FOR <br />THE TRANSFORMER LOCATION, CONCRETE PAD REQUIREMENTS, <br />SECONDARY CONDUIT AND WIRE AND METERING REQUIREMENTS. <br />ALL WORK AND ANY COST RELATIVE TO THE ABOVE THAT IS THE <br />CONTRACTOR'S RESPONSIBILITY SHALL BE INCLUDED AS PART OF <br />THIS CONTRACT. <br />2. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH LOCAL TELEPHONE <br />COMPANY TO PROVIDE A COMPLETE UNDERGROUND SERVICE INSTALLATION <br />INTO THE BUILDING. ELECTRICAL CONTRACTOR SHALL PROVIDE A <br />3" CONDUIT WITH PULL CORD FROM THE MAIN TELEPHONE BACKBOARD INSIDE <br />THE BUILDING, TO THE TELEPHONE CO. SERVICE CONNECTION POINT AT <br />PROPERTY LINE OR AS DIRECTED BY LOCAL TELEPHONE COMPANY <br />REPRESENTATIVE. <br />3. EDGE OF POLE BASE SHALL BE 3'-0" FROM BACKSIDE OF CONCRETE CURB. <br />4. INTERNALLY LIGHTED SIGN PROVIDED BY OWNER. <br />1 #6 STIR. COPPER WIRE <br />CONNECT TO GROUND LUG <br />POLE BASE COVER AT BASE OF POLE <br />TO CONCEAL ALL 45 DEGREE CHAMFER <br />HARDWARE ALL AROUND <br />" FINISHED GRADE <br />ANCHOR BOLTS <br />AS FURNISHED <br />BY MFR. 5/8" X 10' <br />24" GROUND ROD <br />#3 TIES AT <br />12" 0. C. A <br />CONDUIT AS C <br />REQUIRED •-�-3—" .• :• 3" REBAR <br />3. I � • I <br />NOTE: ALL CONCRETE WORK SHALL CONFORM <br />TO DIVISION 3 OF SPECIFICATIONS <br />SCHEDULE <br />HT. <br />A <br />B <br />C <br />30' <br />8'-0" <br />2'-6" <br />8 <br />r3-'% POLE BASE DETAIL <br />E2 SCALE: NTS <br />L-J <br />T <br />O <br />m <br />uj <br />Z) <br />PROPERTY LINE (TYP) <br />WITHLACOOCHEE <br />TRANSFORMER <br />(COORDINATE) <br />I <br />Seal: <br />onsultants: <br />0 <br />ARCHITECTURAL ENGINEERING INCORPORATED <br />3442 EAST LAKE ROAD, PALM HARBOR, FL 34685 <br />CONSULTING ENGINEERS (727) 784-1472 <br />CERTIFICATE OF AUTHORIZATION: FL 3886 <br />W. RONALD MCILVEEN FL PE 30270 <br />
The URL can be used to link to this page
Your browser does not support the video tag.