EXISTING
<br />SANITARY LINE
<br />� ' I
<br />, I
<br />3" VTR I■ I
<br />F 0
<br />I I
<br />I
<br />I cV CV
<br />I
<br />11 Q
<br />J/ p POINT OF CONNECTION
<br />WG1 I /
<br />I TO EXISTING 4" SANITARY.
<br />WCO I �` (STUBBED UP IN THE AREA
<br />OF SLAB LEAVE OUT AND
<br />b CAPPED ABOVE GRADE)
<br />3 Sanitary & Vent Riser
<br />SCALE: NTS
<br />EXISTING CW LINE NEW TENANT SUB METER
<br />AND VALVE. TO BE PROVIDED BY
<br />LANDLORD AND INSTALLED
<br />BY LANDLORD'S GC
<br />1• �a" 3/4.
<br />POINT OF '•')'i
<br />CONNECTION TO �1
<br />EXISTING 1'CW
<br />LINE (VALVED AND ��% 'v �j`►
<br />CAPPED ABOVE
<br />CEILING). 0-1 �/?•
<br />NX ® 0
<br />2 Domestic Water Riser
<br />SCALE: NTS
<br />EXISTING VALVE AND
<br />HOSE BIBB TO REMAIN
<br />AS IS -\
<br />PLUMBING GENERAL NOTES
<br />1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. I.E.: FLORIDA BUILDING CODE 2007- PLUMBING WITH 2O08 23. METERING AND SITE UTILITY CONNECTIONS SHALL BE PROVIDED ON SITE UTILITY DRAWINGS. ALL SERVICES SHOWN ON THIS SET OF PLANS TERMINATE 5'-0"
<br />SUPPLEMENT. FROM BUILDING, UNLESS SHOWN OTHERWISE ON DRAWINGS. PLUMBING CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO SITE UTILITIES.
<br />2. ALL SANITARY PIPING 2-1/2" OR LESS SHALL HAVE A 1/4" PER FOOT SLOPE. ALL SANITARY PIPING 3" OR LARGER SHALL HAVE A 1/8" PER FOOT SLOPE UNLESS 24. FURNISH AND INSTALL HOSE BIBBS AND/OR WALL HYDRANTS 24" ABOVE FINISHED GRADE/FLOOR AND PROVIDE VACUUM BREAKERS.
<br />OTHERWISE NOTED. ALL STORM WATER PIPING 2-1/2" OR LESS SHALL HAVE A 1/4' PER FOOT MINIMUM HORIZONTAL SLOPE. ALL STORM WATER PIPING 3" OR LARGER
<br />SHALL HAVE A 1/8" PER FOOT MINIMUM HORIZONTAL SLOPE UNLESS OTHERWISE INDICATED. 25. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ROOF DRAINS, PLUMBING FIXTURE MOUNTING HEIGHTS AND DIMENSIONS.
<br />3. VALVES AND FITTINGS SHALL BE OF SAME SIZE OF LINE ON WHICH THEY ARE LOCATED, UNLESS OTHERWISE INDICATED ON DRAWINGS.
<br />4. INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE OR BATTERY OF FIXTURES WHERE REQUIRED. ARRESTORS SHALL BE FACTORY FABRICATED.
<br />INSTALL ARRESTORS AND SIZE PER PLUMBING AND DRAINAGE INSTITUTE STANDARD P.D.I. WH-201. ACCEPTABLE MANUFACTURERS: JOSAM, WATTS AND SIOUX
<br />CHIEF. AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO WATER ARRESTORS AS SPECIFIED.
<br />5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING FIRE RATING AND WEATHERPROOFING INTEGRITY OF ALL PIPING AND PENETRATIONS.
<br />6. ALL WATER SUPPLY AND SANITARY LINES SHALL RUN AS CLOSE TO PLANS AS POSSIBLE WITH NO CHANGES IN SIZING.
<br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES.
<br />8. CHANGES IN THE DIRECTION OF SANITARY AND STORM DRAINAGE PIPING SHALL NOT BE MADE WITH FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE
<br />VELOCITY OF FLOW OR CREATE ANY OTHER ADVERSE EFFECT. I.E.: USE OF SANITARY TEE IN A HORIZONTAL CONNECTION, USE OF A DOUBLE SANITARY TEE IN A
<br />VERTICAL STACK, USE OF SHORT RADIUS FITTINGS FOR BRANCH TO HOUSE DRAIN OR STACK CONNECTION.
<br />9. CONTRACTOR SHALL GIVE 24 HOURS NOTICE TO APPLICABLE UTILITY COMPANY PRIOR TO PERFORMING WORK INVOLVING UTILITIES.
<br />10. ALL DRAINAGE PIPING SHALL BE MARKED WITH THE SEAL OF APPROVAL OF THE NATIONAL SANITATION FOUNDATION.
<br />11. WHERE SANITARY SEWER LINES CROSS UNDERGROUND WATER SUPPLY LINES THE INSTALLATION SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2007
<br />PLUMBING, ARTICLE 603.2.CONSTRUCTED OF DUCTILE IRON PIPE (10' EACH SIDE OF WATER MAIN) OR THE WATER LINES SHOULD BE MODIFIED TO PROVIDE 8'
<br />MINIMUM CLEARANCE.
<br />12. ALL FLOOR DRAINS SHALL BE PROVIDED WITH A TRAP PRIMER VALVE AND FITTINGS UNLESS NOTED OTHERWISE.
<br />13. THE PLUMBING CONTRACTOR MAY BE REQUIRED TO DROP PIPE OUTSIDE OF BUILDING TO REQUIRED DEPTH TO PROVIDE CONNECTION TO AREA DEVELOPMENT
<br />UTILITY STUB. ALL DROPS IN DEPTH SHALL BE MADE WITH THE USE OF 450 FITTINGS.
<br />14. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, OR IN CHASES. EXPOSED PIPING SHALL BE SLOPED AND PAINTED TO MATCH ARCHITECTURAL
<br />FINISHES. PIPING IN MECHANICAL ROOMS MAYBE EXPOSED.
<br />15. SLEEVE AND FIRE STOP ALL PENETRATIONS (IF ANY) OF RATED WALLS, FLOORS, CEILINGS, ETC., IN ACCORDANCE WITH APPLICABLE UL STANDARDS AND LOCAL
<br />CODES TO MAINTAIN RATINGS. REFER TO SPECIFICATIONS AND ARCHITECTURAL DRAWINGS FOR RATED WALLS, CEILINGS AND FLOOR INFORMATION.
<br />16. ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE PLACED ON THE INTERIOR SIDE OF THE WALL.THE WALL INSULATION SHALL BE PLACED ON THE
<br />EXTERIOR SIDE OF THE PIPE.
<br />17. SEE RISER DIAGRAMS FOR BRANCH PIPING DETAILS AND SIZES NOT SHOWN ON PLANS.
<br />18. COLD AND HOT WATER PIPING SHALL BE COPPER WATER TUBE (ASTM B88) TYPE 'L' WITH WROUGHT -COPPER (ANSI B16.22), OR CAST BRASS (ANSI B16.18)
<br />PRESSURE FITTINGS AND ALLOY GRADE (ANSI-ASTM B32) 95TA LEAD-FREE SOLDER JOINTS. DISINFECT WATER PIPING AFTER PRESSURE TEST WITH CHLORINE
<br />SOLUTION 50 MG-L) FOR 24 HOURS. FLUSH LINES CLEAN AFTER COMPLETION.
<br />19. SOIL, WASTE AND VENT PIPING SHALL BE PVC: ASTM D2665 SCHEDULE 40. FITTINGS: PVC DWV JOINTS: ASTM WELD. PROVIDE CAST IRON PIPE AND FITTINGS FOR
<br />SOIL, WASTE AND VENT PIPING LOCATED IN CEILING PLENUMS.
<br />20. PROVIDE CLEANOUTS AT BASE OF EACH VERTICAL STACK AT EACH CHANGE OF DIRECTION OF HORIZONTAL RUNS AND AT 100 FOOT INTERVALS OF HORIZONTAL
<br />RUNS FOR SANITARY AND STORM PIPING.
<br />21. PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
<br />MAXIMUM EXISTING INVERT
<br />ELEVATION = 97.6T (BASED ON
<br />FINISH FLOOR ELEVATION OF
<br />100.00' AND TOTAL DEVELOPED
<br />LENGTH OF 100'4r AT 1/8" PER
<br />FOOT SLOPE). SEE EXISTING
<br />CIVIL DRAWINGS FOR EXACT
<br />-- --- INVERT AND CONTINUATION.
<br />4"
<br />EXISTING CLEAN OUT
<br />TO REMAIN AS IS
<br />REFER TO EXISTING
<br />SHELL DRAWINGS FOR
<br />CONTINUATION
<br />EXISTING STUB OUT IN
<br />ADJACENT SPACE TO
<br />REMAIN AS IS
<br />RUN COLD WATER FOR
<br />SINK DOWN FROM ABOVE
<br />CEILING INSIDE OF WALL.
<br />RUN VENT FOR SINK TO
<br />UP ABOVE CEILING INSIDE
<br />OF WALL.
<br />1 Plumbing Floor Plan
<br />Z Scale:1/8"=1'4r
<br />26. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF EXISTING SEWERS IN WHICH NEW SEWER LINES ARE TO BE CONNECTED PRIOR TO INSTALLATION.
<br />28. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR METALS.
<br />29. CONTRACTOR SHALL ROUGH -IN ALL WASTE AND SUPPLIES TO SPECIAL EQUIPMENT ACCORDING TO MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL
<br />CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. INSTALL VACUUM BREAKERS WHERE REQUIRED BY CODE.
<br />30. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING PIPE ROUTING AND EQUIPMENT LOCATIONS) TO ARCHITECT/ENGINEER FOR REVIEW PRIOR TO
<br />THE INSTALLATION OR PURCHASING OF ANY PIPING AND/OR EQUIPMENT.
<br />31. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTERS FOR DOMESTIC WATER SUPPLY CONNECTIONS AS REQUIRED BY CODE.
<br />32. ALL BELOW GRADE/SLAB COPPER PIPE SHALL BE PLACED WITHIN COPPER PIPE SLEEVE (10 MIL) POLYETHYLENE PLASTIC SLEEVING. EXTEND SLEEVING
<br />ABOVE GRADEISLAB.
<br />33. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF FLOOR DRAINS (IF ANY) LOCATED WITHIN TOILET ROOMS.
<br />34. PRESSURE REDUCING VALVES SHALL BE INSTALLED ON BRANCH LINES SERVING FIXTURES AND/OR EQUIPMENT WHEN THE PRESSURE IN THE LINE EXCEEDS
<br />80 P.S.I.
<br />35. COORDINATE EXACT LOCATION OF FLOOR DRAINS FOR HVAC EQUIPMENT WITH MECHANICAL CONTRACTOR. CONDENSATE PIPING SHALL NOT DISCHARGE
<br />INTO SANITARY SYSTEM.
<br />36. ROUTE WATER LINES TIGHT TO STRUCTURE. COORDINATE ROUTING TO AVOID CONFLICTS WITH OTHER DISCIPLINES.
<br />37. IF THE INTENT OF THE DRAWINGS AND/OR SPECIFICATIONS IS UNCLEAR OR HAS MORE THAN ONE INTERPRETATION, IT SHALL BE BROUGHT TO THE
<br />ATTENTION OF THE ARCHITECTIENGINEER IN WRITING BEFORE THE SUBMISSION OF BIDS. THE ARCHITECT/ENGINEER SHALL MAKE CORRECTIONS AND/OR
<br />PROVIDE EXPLANATION IN WRITING.
<br />38. PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED. ALL ITEMS NOT SPECIFICALLY MENTIONED OR
<br />SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. THE CONTRACTOR
<br />SHALL ACQUAINT HIMSELF WITH THE MECHANICAL, ARCHITECTURAL, STRUCTURAL AND ELECTRICAL PLANS PRIOR TO SUBMITTING HIS FINAL BID. NO
<br />ADDITIONAL COMPENSATION WILL BE ALLOWED DUE TO CONTRACTORS FAILURE TO FAMILIARIZE HIMSELF WITH THE PLANS.
<br />39. THE CONTRACTOR SHALL BASE HIS PROPOSAL UPON THE EQUIPMENT AS SCHEDULED OR SPECIFIED, USING THE MANUFACTURERS AND EQUIPMENT
<br />SPECIFIED ON THE DRAWINGS. IF MORE THAN ONE MANUFACTURER IS SPECIFIED FOR ONE ITEM, ANY ONE OF THE MANUFACTURERS LISTED MAY BE USED
<br />IN THIS CONTRACTOR'S PROPOSAL. IF THIS CONTRACTOR WISHES TO USE EQUIPMENT NOT SPECIFIED, HE MUST AT THE TIME OF BIDDING SUBMIT
<br />SEPARATELY ON LETTERHEAD STATIONARY OF THE BIDDER, THE EQUIPMENT HE WOULD SUBSTITUTE AND THE COST TO BE ADDED OR TO BE DEDUCTED
<br />FROM HIS PROPOSAL.
<br />40. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS INSUFFICIENT TIME TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN
<br />DELIVERY WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS.
<br />41. DO NOT PENETRATE WALL FOOTINGS WITH PIPING. COORDINATE WITH GENERAL CONTRACTOR TO DROP FOOTINGS AS REQUIRED TO CLEAR PLUMBING
<br />SERVICES WHERE ABSOLUTELY NECESSARY. ALL PIPING PENETRATING A BEARING WALL OR FOOTING MUST BE SLEEVED AND LOCATION APPROVED BY
<br />STRUCTURAL ENGINEER.
<br />42. REFER TO PLANS FOR VENT THRU ROOF (VTR) PIPE SIZES AND LOCATIONS. LOCATE VTR A MIN.10' HORIZONTAL FROM ANY BUILDING OPENING OR FRESH
<br />AIR INTAKE. EXTEND VTR 12' ABOVE ROOF SURFACE. IF 10' DISTANCE CANNOT BE ACHIEVED LOCATE VTR 2' ABOVE ADJACENT TOP OF FRESH AIR INTAKE OR
<br />BUILDING OPENINGS. PROVIDE in FIBERGLASS INSULATION WITH ALL -SERVICE JACKET ON VENT PIPE INSIDE BUILDING WITHIN V OF VTR LOCATION. VERIFY
<br />FLASHING AND COUNTERFLASHING AND COORDINATE INSTALLATION WITH ROOFING CONTRACTOR.
<br />FIXTURE SPECIFICATIONS
<br />PIPE SIZE
<br />TAG
<br />FIXTURE
<br />MANUFACTURER
<br />MODEL #
<br />DESCRIPTION
<br />CW
<br />HW
<br />SAN
<br />VENT
<br />WATER CLOSET
<br />ADA COMPLIANT PRESSURE ASSISTED WATER CLOSET. VITREOUS CHINA 2-PIECE CONSTRUCTION. PROVIDE
<br />WC-1
<br />PRESSURE ASSISTED
<br />AMERICAN STANDARD
<br />2377.100
<br />1/2"
<br />4"
<br />20
<br />WITH MANUFACTURERS RECOMMENDED ANGLE SUPPLY STOPS AND SUPPLY TUBING AND INSTALLATION
<br />FLUSH TANK
<br />MATERIALS. PROVIDE WITH ANTIMICROBIAL OPEN FRONT COVERLESS SEAT.
<br />(ADA)
<br />LAVATORY
<br />ADA COMPLIANT WALL HUNG VITREOUS LAVATORY. PROVIDE ANGLE SUPPLIES, P-TRAP, PIPING INSULATION
<br />L-1
<br />WALL HUNG
<br />AMERICAN STANDARD
<br />0355.012
<br />1/2"
<br />-
<br />2"
<br />1-1/2"
<br />WRAP, DRAIN GRID AND INSTALLATION MATERIALS. INSTALL AS REQUIRED TO MEET ADA GUIDELINES. PROVIDE
<br />FAUCET 7402.00 WITH WRIST BLADE HANDLES. INSTALL USING MANUFACTURERS RECOMMENDATIONS.
<br />ELECTRIC WATER
<br />ELKAY
<br />BARRIER FREE ADA COMPLIANT ELECTRIC WATER COOLER. COORDINATE POWER OUTLET LOCATION WITH
<br />COOLER
<br />HI-LO
<br />EZSTLBC
<br />1/2"
<br />-
<br />2"
<br />1-1/2
<br />ELECTRICAL CONTRACTOR FOR ELECTRICAL CORD WITH 3-PRONG PLUG. INSTALL PER MANUFACTURERS
<br />RECOMMENDATIONS. REFER TO ARCHITECTURAL ELEVATION VIEWS FOR MOUNTING HEIGHTS.
<br />W®
<br />WALL CLEANOUT
<br />ZURN
<br />Z1446
<br />-
<br />-
<br />-
<br />-
<br />WALL CLEANOUT WITH STAINLESS STEEL ROUND ACCESS COVER. SEE PLANS FOR PIPE SIZE CONNECTION.
<br />FC
<br />FLOOR CLEANOUT
<br />ZURN
<br />Z1400
<br />-
<br />-
<br />-
<br />-
<br />FLOOR CLEANOUT WITH ACCESS COVER. SEE PLANS FOR PIPE SIZE CONNECTION.
<br />ELECTRIC WATER
<br />10 GALLON GLASS LINED STEEL TANK, ANODE ROD & FOAM INSULATION BETWEEN OUTER STEEL JACKET.
<br />HEATER
<br />A.O. SMITH
<br />DEL-10
<br />314"
<br />-
<br />-
<br />-
<br />INCOLOY SHEATHED IMMERSION TYPE HEATING ELEMENTS, 6.0 KW, 208V, 2PH., SET OUTLET TEMP. AT 110 OF
<br />UNLESS OTHERWISE NOTED.
<br />SINGLE COMPARTMENT, 20 GAUGE, TYPE 301 S/S, SELF RIMMING SINK, 25" X 22" X 8' DEEP PUNCHED FOR 3-HOLE
<br />®
<br />KITCHEN SINK
<br />ELKAY
<br />ESE 2522
<br />1/2"
<br />117
<br />2'
<br />1-1/2"
<br />FAUCET INSTALLATION ON 4" CENTERS. PROVIDE T&S FAUCET MODEL B-2731. PROVIDE ANGLE SUPPLY, LOOSE
<br />KEY STOP, REDUCER AND CHROME PLATED 17 GAUGE 1-1/2" X 1-1/2' P-TRAP WITH CLEANOUT. INSTALL USING
<br />MANUFACTURERS RECOMMENDED INSTALLATION INSTRUCTIONS.
<br />NOTE: REFER TO ARCHITECTURAL DRAWINGS FOR ALL FINAL LOCATIONS AND MOUNTING DIMENSIONS OF ALL PLUMBING FIXTURES. PROVIDE ADA CONFORMING FACTORY INSULATION KIT ON HOT, COLD AND P-TRAP WASTE
<br />PIPING AT HANDICAP DESIGNATED LAVATORIES.
<br />PIPING MATERIAL SCHEDULE
<br />INSULATION
<br />SERVICE
<br />SIZE
<br />MATERIAL
<br />SCHEDULE/TYPE
<br />REMARKS
<br />TYPE
<br />THICKNESS
<br />COLD OR HOT WATER
<br />ALL
<br />COPPER
<br />TYPE L
<br />FG
<br />1"
<br />SEE NOTE 2
<br />SANITARY
<br />ALL
<br />C.I.OR PVC
<br />SERVICE WEIGHT
<br />NONE
<br />-
<br />NO HUB
<br />VENT
<br />ALL
<br />C.I.OR PVC
<br />SCH. 40
<br />NONE
<br />-
<br />SEE NOTE 1
<br />NOTES
<br />1. WASTE AND VENT PIPING IN PLENUM SPACE SHALL BE SERVICE WEIGHT CAST IRON, NO HUB.
<br />2. FIBERGLASS PIPE INSULATION: MINERAL OR GLASS FIBERS BONDED WITH A THERMOSETTING RESIN. SEMIRIGID BOARD MATERIAL WITH
<br />FACTORY -APPLIED ASJ COMPLYING WITH ASTM C 1393, OR WITH PROPERTIES SIMILAR TO ASTM C 612. NOMINAL DENSITY IS 2.5 LB/CU. FT. OR MORE.
<br />THERMAL CONDUCTIVITY (K VALUE) AT 100 DEG. F (55 DEG. C) IS 0.29 BTU X INJH X SQ.FT. X DEG. F (0.042 W/M X K) OR LESS. ALL SERVICE JACKET (ASJ):
<br />WHITE, KRAFT-PAPER, FIBERGLASS -REINFORCED SCRIM WITH ALUMINUM -FOIL BACKING; COMPLYING WITH ASTM C 1136, TYPE MANUFACTURERS; A.
<br />CERTAINTEED CORP., B. JOHNS MANVILLE, C. KNAUF INSULATION, D. OWENS CORNING
<br />CLEANOUT AND ACCESS -
<br />COVER. TOP OF COVER TO
<br />BE FLUSH W/TOP OF FLOOR
<br />MAY EXTEND/
<br />WASTE OR VEI
<br />FOR WALL
<br />CONST. REF.
<br />ARCH. DWGS.
<br />CLEANOUT TE
<br />WASTE LINE
<br />LENGTH TO SUIT ---'
<br />FLOOR LINE
<br />a
<br />b a
<br />-1/8" C.I. BEND
<br />`BALANCE OF PIPING SAME
<br />AS CLEANOUT TO GRADE
<br />4 Floor Cleanout Detail
<br />SCALE: NONE
<br />WYE FITTING
<br />FLOW
<br />5 Wall Cleanout Detail
<br />SCALE: NONE
<br />CLEANOUT PLUG
<br />COUNTERSUNK
<br />SCREW
<br />POLISHED S.S.
<br />ACCESS COVER
<br />1/8' BEND AND END
<br />OF LINE CLEANOUT
<br />WASTE LINE, IF
<br />APPLICABLE
<br />WATER HAMMER ARRESTOR
<br />SCHEDULE
<br />INSTALLED ARRESTOR SHALL BE APPROVED DEVICE BY
<br />FLORIDA PLUMBING CODE. ALL SUPPLY PIPING SHALL
<br />= HAVE ARRESTOR THE SAME SIZE AS CONNECTION SIZE
<br />UP TO 1" I.E. PROVIDE P.D.I. SIZE "C' FOR V OR LARGER
<br />WATER SUPPLY TO FIXTURES, P.D.I. SIZE'B" FOR 3/4"
<br />SUPPLY AND P.D.I. SIZE "A" FOR 1/2" SUPPLY.
<br />* P.D.I. SIZE
<br />CONNECTION SIZE
<br />A (1-11 F.U.)
<br />1/2"
<br />B (12-32 F.U.)
<br />314'
<br />C (33-60 F.U.)
<br />1"
<br />P.D.I. = PLUMBING AND DRAINAGE INSTITUTE STANDARD WH-201
<br />SYMBOLS AND ABBREVIATIONS
<br />DESCRIPTION
<br />ABBR.
<br />SYMBOL
<br />SANITARY PIPE ABOVE GRADE
<br />SAN
<br />SANITARY PIPE BELOW GRADE
<br />SAN
<br />-
<br />VENT PIPE
<br />V
<br />------------
<br />COLD WATER PIPE
<br />CW
<br />-
<br />HOT WATER PIPE
<br />HW
<br />- -
<br />STORM ABOVE GRADE
<br />ST
<br />STORM BELOW GRADE
<br />ST
<br />STORM OVERFLOW
<br />STO
<br />ROOF DRAIN
<br />RD
<br />(a )
<br />FLOOR CLEANOUT
<br />CO
<br />0
<br />EXTERIOR CLEANOUT
<br />ECO
<br />WALL CLEANOUT
<br />WCO
<br />I
<br />HOSE BIBB
<br />HB
<br />Hi-C
<br />VENT THRU ROOF
<br />VTR
<br />J i L
<br />DIRECTION OF FLOW
<br />so
<br />SHUT OFF VALVE
<br />CAP
<br />C
<br />TEE UP
<br />TEE DOWN
<br />ELBOW UP
<br />0
<br />ELBOW DOWN
<br />C
<br />REVISION REFERENCE
<br />Q
<br />TYPICAL
<br />TYP
<br />POINT OF NEW CONNECTION
<br />8
<br />'SOME SYMBOLS SHOWN MAY NOT PERTAIN TO THIS PROJECT
<br />DRAWING INDEX
<br />SHEET
<br />TITLE
<br />P101
<br />Plumbing General Information, Floor Plan &
<br />Risers
<br />V
<br />c
<br />0
<br />CL
<br />O
<br />L.
<br />Ow
<br />cug�
<br />vas
<br />-Ucn
<br />W a IUL
<br />w Q
<br />.E�a
<br />L
<br />w ��H
<br />J
<br />U
<br />cn
<br />O
<br />E
<br />E
<br />O
<br />U
<br />L
<br />i
<br />c
<br />J
<br />Q m
<br />QD Q
<br />vJ
<br />Qp LL
<br />co _5
<br />m J
<br />�J=
<br />W
<br />�UJI Ora
<br />N
<br />a
<br />Vn
<br />maNc/
<br />I..L
<br />06
<br />c
<br />_cu
<br />L
<br />_O
<br />IL
<br />C
<br />_O
<br />cu
<br />E
<br />L
<br />cu
<br />s`
<br />1�
<br />V
<br />CD
<br />W EJ
<br />w
<br />W
<br />w
<br />a
<br />N
<br />U1
<br />o�
<br />o
<br />J
<br />a
<br />�
<br />Z w
<br />o
<br />�p
<br />� N
<br />N
<br />Y
<br />W
<br />a
<br />0
<br />U
<br />P101
<br />
|