My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7928 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
7928 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 9:07:13 PM
Creation date
2/19/2025 11:52:53 AM
Metadata
Fields
Template:
Building Plans
Street #
7928
Location
Gall Blvd
Contractor
FM Linear Construction
Building Plans - Permit #
10243
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EX_I.5TIN_Gz LIGI4TINGL 4 VAC DUCT FLAN (/NORTH <br />SCALE: 1/4' . I'-0 <br />EXI5TING ELECTRICAL POWER FLAN 61 NORTH <br />SCALE: 1/4' = 1'-0 <br />V:,, <br />L <br />ELECTRICAL 5I EGFICATION5 <br />I. ALL WORK SHALL BE IN CONFORMANCE WITH THE LATEST EDITION OF N.E.C. AND THE FLORIDA <br />BUILDING CODE 2004 EDITION, w/2005, 2006, 2001 t 20M SUPPLEMENTS. <br />2. IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION. THE <br />ELECTRICAL CONTRACTOR IS EXPECTED TO FURNISH AND INSTALL ALL ITEMS FOR A COMPLETE <br />ELECTRICAL SYSTEM, AND PROVIDE ALL NECESSARY DEVICES AND COMPONENTS FOR <br />EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER <br />3. ALL MATERIALS SHALL BE NEW AND OF DOMESTIC ORIGIN AND SHALL BEAR UNDERWRITERS' <br />LABEL WHERE APPLICABLE. <br />4. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST -GLASS <br />WORKMANLIKE MANNER. THE COMPLETED SYSTEM 15 TO BE FULLY OPERABLE AND ACCEPTABLE <br />OF THIS SYSTEM BY THE OWNER MUST BE A CONDITION OF THE SUB CONTRACT. <br />5. ALL WORK TO BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS <br />OF CONSTRUCTION. <br />6. ELECTRICAL CONTRACTOR TO GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS <br />FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE. <br />1. CORRECTION OF ANY DEFECTS TO BE COMPLETED WITHOUT ADDITIONAL CHAFE AND TO INCLUDE <br />REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN <br />DAMAGED THEREBY. <br />8. ELECTRICAL CONTRACTOR TO PAY FOR ALL PERMITS, FEES, INSPECTION AND TESTING <br />CONNECTED WITH HIS WORK. <br />S. MINIMUM WIRE SIZE SHALL BE 012 AWG, EXCLUDING CONTROL WIRING UNLESS OTHERWISE NOTED ALL <br />CONDUCTORS SHALL BE COPPER WITH THWN/THHN INSULATION. CONDUCTORS 010 AND SMALLER <br />MAY BE SOLID. ALL THOSE 08 AND LARGER TO BE STRANDED. CONTRACTOR SHALL INCREASE <br />CONDUIT SIZE BY ONE(U FOR EVERY 15 FEET OF RUN AND SHALL BE RESPONSIBLE FOR <br />INSTALLATION OF PROPER WIRE AND CONDUIT SIZE. <br />10. ALL UNDERGROUND RACEWAYS SHALL BE GALVANIZED RIGID STEEL CONDUIT OR SCHEDULE <br />40 PVC. ALL OTHER RACEWAYS TO COMPLY WITH GOVERNING CODES. <br />II. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS, CAST ALUMINUM WITH THREADED <br />14USS IN WET OR DAMP LOCATIONS, AND BE OF SPECIAL CONSTRUCTION FOR OTHER CLASSIFIED <br />AREAS. ALL BOXES SHALL BE RECESSED (FLUSH) IN WALLS OR CEILING WHENEVER POSSIBLE. <br />12. DISCONNECT SWITCHES SHALL BE H.P. RATED, GENERAL DUTY, QUICK -MAKE, QUICK -BREAK TYPE. <br />ENCLOSURES SHALL BE AS REQUIRED BY NEC. AND LOCATION (WEATHERPROOF, <br />EXPLOSION PROOF, ETC.). <br />13. ALL GENERAL PURPOSE SWITCHES AND RECEPTACLES SHALL BE THE PRODUCT OF A SINGLE <br />MANUFACTURER COLOR OF FIXTURES AND PLATES SHALL BE DICTATED BY OWNER ALL OTHER <br />REQUIRED DEVICES SHALL MATCH IN COLOR AND STYLE. <br />14. ALL RACEWAYS AND PIPES, SPACED IN OR THROUGH ANY CONCRETE SLAB, SHALL BE SPACED A <br />MINIMUM OF THREE TIMES THE DIAMETER OF THE LARGEST RACEWAY. <br />15. ALL ELECTRICAL RACEWAYS (METALLIC AND NON-METALLIC) AND CONDUITS SHALL HAVE AN <br />EQUIPMENT GROUND CONDUCTOR SIZED IN ACCORDANCE WITH THE LATEST EDITION OF THE N.E.C. <br />16. LOAD DATA IS BASED ON INFORMATION GIVEN ENGINEER AT THE TIME OF DESIGN. VERIFY ALL <br />EQUIPMENT NAMEPLATE RATINGS BEFORE ORDERING. <br />11, CIRCUITS SHOWN ON PLANS ARE TO DETERMINE LOAD DATA AND PANEL SIZES. THE ELECTRICAL <br />CONTRACTOR IS TO PROVIDE CIRCUITS AND ROUTING OF CONDUITS TO SUIT JOB CONDITIONS. <br />18. FURNISH AND INSTALL DISCONNECT SWITCHES, WIRING, AND CONNECTION ON AIR CONDITIONING <br />SYSTEM AS SHOWN ON PLANS. ELECTRICAL CONTRACTOR SHALL VERIFY AND COORDINATE WITH TE WIT <br />MECHANICAL CONTRACTOR REGARDING SUPPLY AND INSTALLATION OF REQUIRED CONTROLS. <br />It. ALL SWITCH GEAR SHALL BE THE PRODUCT OF A SINGLE MANUFACTURER. SYSTEM DESIGN 15 BASED <br />ON SQUARE 'D'. HOWEVER COMPARABLE EQUIPMENT BY WESTINGHOUSE/CWALLANGER, OR G.E. WILL <br />BE ACCEPTABLE. TANDEM AND HALF -SPACE CIRCUIT BREAKERS SHALL NOT BE USED. <br />20, ALL UNDERGROUND PVC CONDUIT RUNS SHALL HAVE RIGID STEEL ELBOWS AND RIGID STEEL <br />SECTIONS AT SLAB PENETRATIONS WHERE SUBJECT TO POSSIBLE DAMAGE. WHERE RIGID STEEL IS <br />USED, IT SHALL BE COMPLETELY COATED WITH AN ALKALI AND RUST -RESISTANT BITUMASTIC PAINT, <br />KIPPER NO. 50, AND THREADS SHALL BE COATED WITH ZINC CHROMATE. <br />21. THE ELECTRICAL CONTRACTOR SHALL MEET AND COORDINATE WITW THE LOCAL POWER COMPANY AT <br />THE SITE PRIOR TO CONSTRUCTION. AT THAT TIME, THE CONTRACTOR SHALL COORDINATE ALL <br />RELATED WORK WITH THE UTILITY COMPANY'S RESPONSIBILITIES TO MEET THE OWNER'S SCHEDULE. <br />22. ALL ELECTRICAL CONDUCTORS SHALL BE INSTALLED IN AN APPROVED RACEWAY. MAXIMUM NUMBER <br />OF 120 VOLT CIRCUITS ALLOWED IN A COMMON CONDUIT SHALL BE SIX (6). ELECTRICAL CONTRACTOR <br />SHALL STRICTLY CONFORM TO THE N E.G. REQUIREMENTS OF RATING FOR CONDUCTOR AMPACITY <br />AND CONDUIT FILL. <br />23. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR SEALING ALL CONDUIT PENETRATIONS MADE <br />THROUGH FIRE RATED WALLS, CEILINGS, SLABS, ETC. PENETRATION SEALS SHALL BE PER U.L. <br />ASSEMBLY STANDARDS. <br />24. LOCAL POWER COMPANY SHALL PROVIDE ELECTRICAL SERVICE CONNECTION AND VERIFICATION OF <br />SAID SERVICE LOCATION. <br />25. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO VERIFY THE LOCATION OF <br />THE TRANSFORMER PROVIDED BY THE LOCAL POWER COMPANY AND POINT OF SAID CONNECTION <br />PRIOR TO SUBMITTING THEIR BID. <br />26. SMOKE DETECTORS SHALL HAVE ELECTRICAL INTERLOCK PER F.B.G. 2004 EDITION, SO THAT IF ONE <br />DETECTOR IS TRIGGERED ALL OTHER SMOKE DETECTORS ARE ACTIVATED. <br />21. NO ELECTRICAL SHALL BE BACKED UP (IF APPLICABLE) IN ANY FIREWALL. <br />25. PRIOR TO COMMENCING WORK, VERIFY ALL MECHANICAL, APPLIANCE AND ELECTRICAL EQUIPMENT <br />REQUIREMENTS. IF GREATER THAN THOSE SHOWN, CONTACT ENGINEER FOR INSTRUCTIONS <br />2S. THE ELECTRICAL CONTRACTOR SHALL INSTALL BOTH THE ELECTRODE GROUNDING CONDUCTOR (2) <br />TWO - 5/8' DIA. COPPER CLAD GROUND RODS 10 FT. LONG AND SPACED 6 FT. APART AND THE <br />'UFER' ELECTRODE GROUND CONDUCTOR TO THE CONCRETE FOOTER PER THE LATEST NEC EDITION, <br />NFPA ARTICLE 10 AND ALL LOCAL CODES AND REGULATIONS. ELECTRODE MUST BE INSPECTED <br />BY BUILDING OFFICIAL PRIOR TO CONCRETE PLACEMENT. <br />REVISIONS <br />BY <br />44 <br />_N W <br />G M a 9 Q <br />01 Q � <br />V�MM S�V <br />� <br />@) <br />U <br />U <br />U'1 <br />Sa w <br />W <br />a 00 <br />zo <br />W <br />H� <br />W <br />a <br />V <br />w�Q <br />cn M <br />l <br />Ix O oc <br />~z <br />0 N z <br />W <br />z <br />o Q <br />P4o� <br />N <br />ON <br />V <br />M-i <br />W <br />u <br />W <br />W <br />z <br />W <br />DATE, t0-13-2008 <br />SCALE, 1/4' <br />- I'-0 <br />DRAWN, ea <br />JOB, 10-006 <br />SHEET 4 <br />CIF ! <br />SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.