My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38378 Springhead Ln
Zephyrhills
>
Building Department
>
Building Plans
>
38378 Springhead Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 1:16:15 PM
Creation date
2/24/2025 10:13:37 AM
Metadata
Fields
Template:
Building Plans
Street #
38378
Location
Springhead Ln
Contractor
D R Horton
Building Plans - Permit #
3330
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: AFDOA28B-263E-4E34-9BOA-833B42563918 <br />TYPICAL ROOF <br />DECK SHEATHING <br />D <br />2x SYP NAILER (IF REQ'D): - <br />• TO WOOD FRAME: (2) 0.131" <br />x 3" NAILS @ EACH STUD, <br />MAX 24" O.C. _ <br />• TO CMU w/ PT NAILER: <br />(2) ROWS 3/6' x 23/4" <br />TAPCONS @ MAX 24" O.C. <br />CHANNEL REQUIREMENTS <br />PER MANUFACTURER <br />MAX 3'-0" OVERHANG <br />` - CHANNEL REQUIREMENTS <br />1 PER MANUFACTURER <br />MAX 12" SPAN <br />2x SYP BLOCK W/ (2) 0.131" x 3" <br />END- OR TOE -NAILS EACH END <br />FASCIA AND DRIP EDGE PER ARCHITECT <br />ATTACH SOFFIT TO 2x BLOCK <br />OR UNDERSIDE OF 2x FASCIA <br />PER MANUFACTURER <br />1x2 SYP NAILING STRIPS TO BLOCK/ NAILER <br />W/ (1) 0.131" x 2%2" NAIL EACH INTERSECTION <br />SEE ST-1 FOR SOFFIT PRESSURE DEMAND <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: <br />1) SOFFIT MANUFACTURER ALLOWABLE <br />PRESSURE. <br />2) +/-57.4 psf. <br />SOFFIT W/ MULTIPLE SPANS <br />TYPICAL ROOF <br />DECK SHEATHING <br />CHANNEL REQUIREMENTS <br />PER MANUFACTURER <br />2x SYP BLOCK W/ (2) 0.131" x 3" <br />END- OR TOE -NAILS EACH END <br />FASCIA AND DRIP EDGE PER ARCHITECT <br />2x SYP NAILER (IF REQ'D): — ATTACH SOFFIT TO 2x BLOCK <br />• TO WOOD FRAME: (2) 0.131" x 3" NAILS OR UNDERSIDE OF 2x FASCIA <br />@ EACH STUD, MAX 24" O.C. PER MANUFACTURER <br />• TO CMU w/ PT NAILER: (2) ROWS 3/g' x <br />2%" TAPCONS @ MAX 24" O.C. MAX 16" SPAN <br />CHANNEL REQUIREMENTS - i- <br />PER MANUFACTURER SEE 9T-1 FOR SOFFIT PRESSURE DEMAND (psf). <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: <br />1) SOFFIT MANUFACTURER ALLOWABLE <br />PRESSURE. <br />2) +/-340 psf. <br />SOFFIT W/ SINGLE SPAN <br />�S"F,_OFFIT DETAILS <br />ffit detail is intended to convey connections between members in the <br />supporting structural frame, not the soffit connections to those members. <br />Product manufacturer and evaluating engineer retain responsibility for <br />individual soffit products and their connection to supporting structural frame. <br />O <br />O <br />N <br />LO <br />04 <br />O <br />O <br />O <br />N <br />CV <br />M <br />J <br />LL. <br />w <br />J <br />J <br />z <br />O <br />fn <br />Y <br />U <br />O <br />0 <br />w <br />I— <br />Z) <br />0 <br />J <br />m <br />w <br />!Y <br />Z) <br />a <br />U) <br />l- <br />z <br />w <br />0 <br />w <br />oc <br />O <br />O <br />O <br />0) <br />i <br />ti <br />Iq <br />07 <br />w <br />m <br />w <br />w <br />z <br />z <br />w <br />0 <br />O <br />LL. <br />O <br />H <br />O <br />a <br />O <br />U <br />0 <br />O <br />J <br />IL <br />c� <br />z <br />O <br />O <br />J <br />O <br />z <br />U <br />w <br />I— <br />x <br />w <br />a <br />X <br />m <br />LU <br />w <br />Q <br />U) <br />0 <br />H <br />F- <br />LL <br />U) <br />O <br />O <br />J <br />O <br />z <br />_ <br />U <br />w <br />X <br />w <br />la. <br />CMUIMETAL CONNECTOR ENGINEERING <br />APEX <br />I <br />t d <br />true design studios <br />9000 REGENCY SQUARE BLVD. Q) <br />SUITE 100, JACKSONVILLE, FL 32211 (0 <br />O <br />-C3 <br />C <br />0) <br />DIH0190N <br />Aswi;2f$ <br />CL <br />4- <br />>N <br />7 <br />This item has been electronically <br />signed and sealed by Justin M Lanier, <br />PE on the date and/or time stamp <br />shown using a digital signature. <br />Printed copies of this document are <br />not considered signed and sealed <br />nd the signature must be verified <br />by a 3rd Party Certificate Authority <br /><n any electronic copy J ` <br />Ll.l♦7 <br />L <br />z <br />J W <br />Uj O co <br />Qeir <br />O <br />W <br />0 <br />¢ <br />0 <br />J <br />LLj <br />LV <br />w <br />w <br />ti <br />X <br />ULV_ <br />0 <br />w <br />I• <br />z <br />a <br />LL. <br />w <br />Abbott Park J <br />U <br />LOT 022-03-1 B 0 <br />w <br />z <br />cD <br />PROJECT NO: w <br />2021.012591 0 <br />LI_ <br />O <br />DRAWN: <br />CD o <br />CHKD: U') <br />MJP U) <br />w <br />J <br />U <br />clIN LA/y�Oi, cn <br />• No 85166 'S <br />DocuSigned by: <br />i 0••• LArPEDA0PP435_.*- �: (rnn <br />OR N <br />11-02-2021 <br />w <br />REVISIONS: _ <br />No. Description Date w <br />J <br />U <br />O <br />z <br />O <br />jSTw7i <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.