Laserfiche WebLink
DocuSign Envelope ID: E631B9FE-6304-4D2E-AC92-45D1657A06BB <br />E <br />�— TYPICAL ROOF <br />DECK SHEATHING <br />O <br />O O <br />MAX 3'-0" OVERHANG A PEX <br />. <br />CHANNEL REQUIREMENTS 04 <br />PER MANUFACTURER O N <br />2x SYP BLOCK W/ (2) 0.131" x 3" 0 <br />END- OR TOE -NAILS EACH END , <br />--_ FASCIA AND DRIP EDGE PER ARCHITECT N <br />-- ATTACH SOFFIT TO 2x BLOCK <br />M <br />2x SYP NAILER (IF REQ'D): — -- _.__ _ OR UNDERSIDE OF 2x FASCIA <br />LJL <br />• TO WOOD FRAME: (2) 0.131" PER MANUFACTURER <br />x 3" NAILS @ EACH STUD, MAX 12" SPAN 1x2 SYP NAILING STRIPS TO BLOCK / NAILER L <br />MAX 24' O.C. _j tds �i <br />W/ (1) 0.131" x 2%Z" NAIL EACH INTERSECTION J j <br />• TO CMU w/ PT NAILER: true design studios <br />(2) ROWS 3/B x 23/4 Z <br />TAPCONS @ MAX 24" O.C. SEE ST-1 FOR SOFFIT PRESSURE DEMAND (psf). O <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: (1)CHANNEL REQUIREMENTS - SOFFIT MANUFACTURER ALLOWABLE U <br />9000 REGENCY SQUARE BLVD.. <br />PER MANUFACTURER PRESSURE. Q SUITE 100, JACKSONVILLE, FL 32211 <br />2) +/-57.4 psf. O <br />SOFFIT W/ MULTIPLE SPANS <br />o <br />w C <br />TYPICAL <br />DECK SHEAOTOHING 0494HOMON, N <br />0 t L_ <br />J t <br />m <br />CHANNEL REQUIREMENTSUj <br />PER MANUFACTURER <br />Q <br />2x SYP BLOCK W/ (2) 0.131" x 3" <br />END- OR TOE -NAILS EACH END C� <br />G7 <br />FASCIA AND DRIP EDGE PER ARCHITECT U N <br />�__EN Z <br />2x SYP NAILER (IF REQ'D): ATTACH SOFFIT TO 2x BLOCK W <br />• TO WOOD FRAME: (2) 0.131" x 3" NAILS OR UNDERSIDE OF 2x FASCIA 0 <br />W <br />@ EACH STUD, MAX 24" O.C. PER MANUFACTURER <br />• TO CMU w/ PT NAILER: (2) ROWS 3/6" x � This item has been electronically <br />23/4' TAPCONS @MAX 24" O.C. MAX 16" SPAN O signed and sealed by Justin M Lanier, <br />PE on the date and/or time stamp <br />CHANNEL REQUIREMENTS 0) Printed <br />using a digital signature. <br />Printed copies of this document are <br />PER MANUFACTURER SEE ST-1 FOR SOFFIT PRESSURE DEMAND (psf). m of considered signed and sealed <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: nd the signature must be verified <br />1) SOFFIT MANUFACTURER ALLOWABLE bn any electronic copyte Authority <br />t <br />PRESSURE. d U) <br />2) +040 psf. Z <br />w <br />SOFFIT W/ SINGLE SPAN w � <br />— <br />Z J z Uj <br />(� w <br />SF OFFIT DETAILS m LU O U) <br />Soffit detail is intended to convey connections between members in the W <br />supporting structural frame, not the soffit connections to those members. W Q <br />Product manufacturer and evaluating engineer retain responsibility for Z <br />individual soffit products and their connection to supporting structural frame. <br />z Q Q <br />Z W 0 <br />W <br />o a J w <br />Lu w <br />OJ X <br />W LLf <br />Z z <br />O O <br />Q 0 <br />W W <br />O <br />CL Z <br />0� W <br />O M <br />U W_ <br />p W <br />Abbott Park _j <br />O (� <br />L_ LOT 009-04-1 B o <br />¢ W <br />U Z <br />Z U <br />QPROJECT NO: WW <br />1 2021.012600 w <br />z O <br />DRAWN: <br />U CD o <br />WLO <br />CHKD: <br />MJP x <br />W W <br />Q U <br />1N LA/V/, <br />No 85166 <br />W S <br />z� <br />+ Doc*Sipnod by: <br />• AT E O F 44/ <br />W �" • C3F4671DACDEF43§�-44jr � <br />� 'O��`''c� O R 10 P .• �� `•` O <br />♦ C? ` Z <br />Z- <br />cn rrrrrt� Q <br />p 11-01-2021 0 <br />� w <br />U_ REVISIONS: LIj <br />U_ I— <br />No. Description Date W <br />O I— <br />O z <br />Z _ O <br />2 0 <br />U <br />W <br />I- <br />X <br />W ST=7 <br />a. <br />Q <br />CMUIMETAL CONNECTOR ENGINEERING <br />