Laserfiche WebLink
DocuSign Envelope ID. 422E4585-AB15-48C1-AF50-1025F7A8ADD7 <br />TYPICAL ROOF <br />DECK SHEATHING <br />MAX T-0" OVERHANG <br />CHANNEL REQUIREMENTS <br />PER MANUFACTURER <br />2x SYP BLOCK W/ (2) 0.131" x 3" <br />END- OR TOE -NAILS EACH END <br />FASCIA AND DRIP EDGE PER ARCHITECT <br />I <br />ATTACH SOFFIT TO 2x BLOCK <br />2x SYP NAILER (IF REQ'D): UNDERSIDE OF 2x FASCIA <br />• TO WOOD FRAME: (2) 0.131"' PER MANUFACTURER <br />x 3" NAILS @ EACH STUDJ��1) <br />MAX 12" SPAN 1x2 SYP NAILING STRIPS TO BLOCK / NAILER <br />MAX 24" O.C. W/ (1) 0.131" x 2%" NAIL EACH INTERSECTION <br />• TO CMU w/ PT NAILER: <br />(2) ROWS 3/s" x 23/4 TAPCONS @ MAX 24" O.SEEST-1 FOR SOFFIT PRESSURE DEMAND (psf). <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: <br />CHANNEL REQUIREMENTS SOFFIT MANUFACTURER ALLOWABLE <br />PER MANUFACTURER PRESSURE. <br />2) +/-57.4 psf. <br />SOFFIT W/ MULTIPLE SPANS <br />2x SYP NAILER (IF REQ'D): <br />• TO WOOD FRAME: (2) 0.131" x 3" NAILS <br />@ EACH STUD, MAX 24" O.C. <br />• TO CMU w/ PT NAILER: (2) ROWS 3/g' x <br />2%4" TAPCONS @ MAX 24" O.C. <br />CHANNEL REQUIREMENTS <br />PER MANUFACTURER <br />TYPICAL ROOF <br />DECK SHEATHING <br />CHANNEL REQUIREMENTS <br />PER MANUFACTURER <br />2x SYP BLOCK W/ (2) 0.131" x 3" <br />END- OR TOE -NAILS EACH END <br />FASCIA AND DRIP EDGE PER ARCHITECT <br />ATTACH SOFFIT TO 2x BLOCK <br />OR UNDERSIDE OF 2x FASCIA <br />PER MANUFACTURER <br />SEE ST-1 FOR SOFFIT PRESSURE DEMAND (psf). <br />CAPACITY OF THIS DETAIL IS THE LESSER OF: <br />1) SOFFIT MANUFACTURER ALLOWABLE <br />PRESSURE. <br />2) +/-340 psf. <br />SOFFIT W/ SINGLE SPAN <br />SF SOFFIT DETAILS <br />Soffit detail is intended to convey connections between members in the <br />supporting structural frame, not the soffit connections to those members. <br />Product manufacturer and evaluating engineer retain responsibility for <br />individual soffit products and their connection to supporting structural frame. <br />O <br />O <br />N <br />U? <br />fV <br />O <br />O <br />O <br />N <br />N <br />M <br />J <br />LL <br />W <br />J <br />J <br />z <br />O <br />L7 <br />Y <br />U <br />Q <br />0 <br />0 <br />W <br />F— <br />Cn <br />J <br />M <br />W <br />Q <br />} <br />Z <br />W <br />C� <br />W <br />W <br />O <br />O <br />O <br />0) <br />i <br />ti <br />Z <br />W <br />m <br />W <br />W <br />w <br />0 <br />0 <br />J <br />LL <br />O <br />H <br />O <br />a <br />0 <br />U <br />Q <br />O <br />J <br />LL <br />Q <br />U <br />z <br />} <br />0 <br />O <br />J <br />O <br />z <br />U <br />w <br />x <br />W <br />a. <br />Q <br />x <br />0}0 <br />W <br />Z <br />O <br />W <br />Q <br />U) <br />O <br />LL <br />a <br />Cl) <br />} <br />0 <br />O <br />J <br />O <br />Z <br />2 <br />U <br />W <br />F- <br />x <br />W <br />d <br />E <br />O <br />U <br />ra <br />O <br />APEX <br />RS <br />Q <br />tds <br />true design studios N <br />9000 REGENCY SQUARE BLVD. C <br />SUITE 100, JACKSONVILLE, FL 32211 ,,; <br />041HOMON <br />fD. <br />.Q <br />N <br />This item has been electronically <br />signed and sealed by Justin M Lanier, <br />PE on the date and/or time stamp <br />shown using a digital signature. <br />Printed copies of this document are <br />not considered signed and sealed <br />nd the signature must be verified <br />by a 3rd Party Certificate Authority <br /><n any electronic copy U <br />W W <br />J z � <br />W <br />LLJ O c) <br />Q <br />> <br />O <br />m <br />W <br />Q <br />J <br />W <br />W <br />W <br />� <br />W <br />x <br />x <br />LL <br />Q <br />z <br />Z <br />O <br />0 <br />H <br />z <br />a <br />LL <br />W <br />Abbott Park <br />U <br />LOT 010-04-1 B <br />0 <br />w <br />Z <br />U_ <br />U) <br />PROJECT NO: <br />W <br />0 <br />2021.012601 <br />Ll. <br />- - <br />O <br />DRAWN: <br />CD <br />801 <br />O <br />CHKD: <br />LO <br />MJP <br />C0 <br />W <br />J <br />Q <br />U <br />,��rrrrri��ar��� <br />�% i1N LA&� <br />rA <br />rn <br />No 85166 <br />� r <br />DocuSigned by: <br />rr <br />� � <br />7FMPEAC0r5.... �(/ i <br />1 <br />'w <br />0R�N• <br />Z <br />•,���i`�,��N Ar <br />11-01-2021 <br />p <br />W <br />REVISIONS: <br />No. Description Date <br />I— <br />w <br />_ <br />J <br />Q <br />U <br />O <br />Z <br />O <br />0 <br />GT=7 <br />CMUIMETAL CONNECTOR ENGINEERING¢ <br />