Laserfiche WebLink
FIBERGLASS SHINGLES <br />OVER *30 FELT PAPER <br />INSTALLED PER FBCR <br />R'BO52.1 ON a, O.S.B. <br />SHEATHING OR J' COX <br />PLYWOOD SECURED PER <br />FASTENER SCHEDULE <br />PRE -ENG TRUSS <br />P,T. IX2 W/ MTL. DRIP EDGE <br />2x4 OR 2xI�, 5UB-BAND <br />PER ELEVATIONS <br />VENTED ALUM. SOFFIT <br />DOUBLE TOP PLATE <br />WINDOW HEADER SIZE <br />VARIES PER WINDOW <br />OPENING SEE HEADER <br />SPAN C34ART FOR <br />DETAILS <br />O.S.B. SHEATHING OR J- <br />CDX PLYWOOD, <br />ATTACHED PER FASTENER <br />SCHEDULE ON SHEET D5 , <br />I/V THICK, 3 C014T <br />PORTLAND CEMENT <br />PLASTER OVER <br />EXPANDED GALVD <br />METAL LATH ON <br />FORTIF15ER JUM50TEX <br />GRADE '0' PAPER OVER <br />TYVEK BUILDING WRAP <br />(REFER TO -STUCCO <br />SPECS FOR COMPLETE <br />INFORMATION) <br />NOTE: SHEATHING MUST <br />NOT BREAK I'-4'MIN. <br />FROM 2ND FLR LINE <br />2x4 CONT, * TOP AND BT. <br />OF FLR TRUSS (TOP 2x4 <br />SUPPORTS BT PLATE OF <br />2ND FLR, BTM. 2x4 15 FOR <br />WALL SHEAT14ING NAILER) <br />FASTEN EACH 2X4 R1550N <br />W1 (5)126 NAILS * EACH <br />rRuss. 5TM. RIBBON TO BE <br />P.T. <br />WEEP -SCREED <br />(SEE DETAIL 2/D3) <br />EMBED. STRAP VERIFY <br />W1 TRUSS PLAN <br />V THICK, 3 COAT <br />PORTLAND CEMENT <br />PLASTER APPLIED <br />DIRECTLY TO MASONRY <br />2—STORY <br />FIRST FLOOR <br />BLOCK SECOND <br />(—,--�FLOOR FRAME <br />2x STUDS a Iro' C <br />INSUL., SEE ENEF <br />FORMS FOR I <br />T 4 G suBrLC <br />AND -a---REWE <br />FASTENER <br />PRE-ENG FLOOR TRUSS <br />SIMPSON HETA-Iro EMBED, <br />STRAP 0 32' O.C. MAX VERIFY <br />W1 TRUSS PLAN <br />G�T-p5um BOARD OR I - <br />HIGH STRENGTH CLG, BOARD <br />2 <br />�x <br />FLOOR <br />,EE ENERGY CODE FORMS <br />OR INSULATION R-vALUES <br />'GYPSUM BOARD OR <br />lIGH STRENGTH CLG, <br />�OARID <br />W15T STRAP VERIFY W1 <br />RUSS PLAN <br />JINDOW ATTACHMENT AS <br />DER MANUFACTURES <br />PPECIFICATIONS <br />WINDOW SILL <br />2x STUDS a I&' or- MAX W1 <br />INSUL., SEE ENERGY CODE <br />FORMS FOR INSULATION <br />R-VALUES <br />J' T 4 G SUEFLOOR GLUED <br />AND SCREWED AS PER <br />FASTENER SCHEDULE <br />PRS-ENG FLOOR TRUSS <br />(INSTALL PER MFG. SPECS.) <br />J'GYPSUM BOARD OR J' <br />PIGP STRENGTH CLG. <br />BOARD <br />CONC. FILLED LINTEL BLK W/ <br />(1) S REBAR CONTINUOUS <br />SEE ENERGY CODE FORMS <br />FOR INSULATION R-VALLIES <br />PRECAST LINTEL <br />WINDOW ATTACHMENT AS <br />PER MANUFACTURES <br />SPECIFICATIONS <br />PRECAST SILL <br />(1) S RE5AR VERTICALLY <br />LLJ/ CONC. POURED CELL <br />Ix2 P.T. FURRING STRIPS <br />6 Irol or - <br />a, CMU <br />1/2, GYP. WL� BD, <br />WOOD BA6E <br />fij O.S.B. SHEATHING OR J- COX <br />PLYWOOD. ATTACHED PER <br />FASTENER SCHEDULE ON SHEET <br />05 <br />1/8' THICK, 3 COAT PORTLAND <br />CEMENT PLASTER OVER <br />EXPANDED GALV'r:> METAL LATH <br />ON FORTIFIBER JUM50TEX <br />GRADE 'D' PAPER OVER TYVEK <br />BUILDING WRAP (f -ENO <br />RET <br />STUCCO SPECS FOR PLETE <br />INFORMATION) <br />2x4 CONT. 6 TOP AND 5T. OF <br />FLR TRUSS (TOP 2x4 SUPPORTS <br />5T PLATE OF 2ND FLR, 5TM. 2x4 <br />15 FOR WALL SHEATHING NAILER) <br />FASTEN EACH 2X4 R15BON W/ (5) <br />126 NAILS a EACH TRU55. BTM. <br />R15BON TO BE P.T. <br />WEEP SCREED <br />.(SEE DETAIL 2/D3) <br />EMBED. STRAP VERIFY <br />W1 TRUSS PLAN <br />%'THICK, 3 COAT PORTLAND <br />CEMENT PLASTER: APPLIED <br />DIRECTLY 70 MASONRY <br />FIBERGLASS SHINGLES <br />OVER 030 FELT PAPER <br />INSTALLED PER FBCR <br />FnO521 ON a' O.S.5. <br />SHEATHING OR J'CDX <br />PLYWOOD SECURED PER <br />FASTENER SCHEDULE <br />P.T. IX2 W/ MTL. DRIP EDGE <br />2x4 OR 2x& SU5-BAND PER <br />ELEVATIONS <br />VENTED ALUM. SOFFIT <br />STIFFBACK (SSE SEALED <br />TRUSS ENG. FOR SIZE 4 <br />CONDITION) <br />SECURE 2x4 PLATE TO WALL W/ <br />i'xro'THRU-5OLTS,m 32' O.C. <br />MAX THEN SECURE GABLE TO <br />2x4 PLATE W/ 12d's S' O.C. MAX <br />OR <br />SECURE GABLE TO DBL TOP <br />PLATE W1 SIMPSON HTC4 * 24' <br />O.C. MAX <br />WINDOW HEADER SIZE VARIES <br />PER WINDOW OPENING SEE <br />HEADER $PAN CHART FOR <br />DETAILS <br />C.S.B. SHEATHING OR J, r-Dx <br />PLYWOOD. ATTACHED PER <br />FASTENER SCHEDULE ON SHEET <br />D5 <br />1/6'THICK, 3 COAT PORTLAND <br />CEMENT PLASTER OVER <br />EXPANDED GALVD METAL LATH <br />ON FORTIFIBER JUMBOTEX <br />GRADE 'D' PAPER OVER TYVEK <br />BUILDING WRAP (REFER TO <br />STUCCO SPECS FOR COMPLETE <br />INFORMATION) <br />NOTE; SHEATHING MUST NOT <br />BREAK 1'-4' MIN. FROM 2ND FLR <br />LINE <br />2x4 CONT. o TOP AND BT. OF <br />FLR TRUSS (TOP 2x4 SUPPORTS <br />BT PLATE Or 2ND FLR, 5TM, 2x4 <br />19 FOR WALL SHEATHING <br />NAILER) FASTEN EACH 2X4 <br />RIBBON W1 (5)12d NAILS 6 <br />EACH TRUSS. BTM. RIBBON TO <br />BE PT. - <br />WEEP SCREED <br />(SEE DETAIL 2/D3) <br />EMBED. STRAP VERIFY <br />W1 TRUSS PLAN <br />%'TPICK, 3 COAT <br />PORTLAND CEMENT <br />PLASTER APPLIED - <br />DIRECTLY TO MASONRY <br />2—STORY GABLE <br />FIRST FLOOR <br />BLOCK SECOND <br />1 ATLOOR FRAME <br />'t-i a�Al M 21A- 11 ^- <br />CONNECTION AT PARALLEL <br />2x4 BLOCKING BETWEEN <br />TRUSSES UJ14ERE 'X' BRACING <br />15 PRESENT <br />PRE-ENG GABLE TRUSS <br />CONT. 2x4 RAT RUN SECURED <br />W/ (2)12d's 0 EACH TRUSS <br />SEE ENERGY CODE FORMS <br />FOR INSULATION R-VALUES <br />I- GYPSUM BOARD OR <br />HIGH STRENGTH CLG, <br />BOARD <br />DOUBLE TOP PLATE <br />WINDOW ATTACHMENT AS <br />PER MANUFACTURES <br />SPECIFICATIONS <br />WINDOW SILL <br />2x STUDS 6 Iro' O.C. MAX W/ <br />INSUL., SEE ENERGY CODE <br />FORMS FOR INSULATION <br />R-VALUES <br />J' T 4 G 5UBFLOOR GLUED <br />AND SCREWED AS PER <br />FASTENER SCHEDULE <br />PRE-ENG FLOOR TRU56 <br />(INSTALL PER MFG. SPECS.) <br />1, GYP5um BOARD OR <br />HIGH STRENGTH CLG. <br />BOARD <br />CONIC. FILLED LINTEL BLK W1 <br />(1) S REBAR CONTINUOUS <br />PRECAST LINTEL <br />WINDOW ATTACHMENT AS <br />PER MANUFACTURER <br />SPECIFICATIONS <br />PRECAST SILL <br />(1) S REBAR VERTICALLY <br />W1 CONC. POURED CELL <br />Ix2 P.T. FURRING 5TRIP5 <br />6 16, OC. <br />a, CMU <br />1/2, GYP. WL. BD. <br />WOOD BASE <br />2x STUDS tv 16' O.r- MAX W/ <br />INSUL, SEE ENERGY CODE <br />FORMS FOR INSULATION <br />R-VALUES <br />J' T 4 G SUBPLOOR GLUEr-> <br />AND SCREWED AS PER <br />FASTENER SCHEDULE <br />NOTE: <br />PER F5CR S0521 - FOR ROOF SLOPES 2:12 TO <br />LESS THAN 4:12, A (2) LAYER UNDERLAYMENT <br />SYSTEM IS REQUIRED. FOR ROOF SLOPES OF <br />4:12 OR GREATER, (1) LAYER UNDERLAYMENT 15 <br />PERMITTED BUT MUST BE PER ASTM D22ro TYPE <br />11, ASTM D 45&S TYPE IV, OR ASTM D ro-15-1 <br />3/4' T 4 G SUBFLOOR GLUED <br />AND SCREWED AS PER <br />FASTENER SCHEDULE ON <br />SHEET D2 <br />PRE-ENG FLOOR TRU55 <br />FASTEN EACH 2X4 RIBBON W/ <br />(5)12d NAILS * EACH TRU55 <br />Gypsum BOARD OR <br />5TM. RIBBON TO BE P - T <br />HIGH STRENGTH CLG. <br />BOARD <br />PRE-ENG FLOOR TRUSS <br />(INSTALL PER MFG. SPEC5.) <br />CONC, FILLED LINTEL BLK W1 <br />(1) S REBAR CONTINUOUS <br />CONC. FILLED LINTEL BLK W/1 <br />(1) 05 REBAR CONTINUOUS <br />RIBBON <br />S— <br />AFASTENING DETAIL <br />SC tAL E.;T3 1,4'- 1'- 0' <br />FIBERGLASS SHINGLES <br />OVER *30 FELT PAPER <br />INSTALLED PER FBCR <br />RS05.2.1 ON J'OS.B. <br />SHEATHING OR J'CDX <br />PLYWOOD SECURED PER <br />FASTENER SCHEDULE <br />PRE-ENG TRUSS <br />P.T. IX2 W/ MTL. DRIP EDGE <br />2x4 OR 2xro SUB-5AND <br />PER ELEVATIONS <br />VENTED ALUM. SOFFIT <br />1,0000 UPLIFT <br />CONNECTOR <br />2x8 SYP 02 <br />DEL TOP <br />PLATE <br />WALL — <br />SHEATHING <br />2x8 SYP 02 — <br />WOOD STUDS <br />AT 12' O.C. MAX <br />2x6 P.T. SYP 02 <br />SOLE PLATE <br />S REBAR 0 I(o' <br />O.C. MAX, IN <br />CONCRETE <br />POURED CELL, <br />VERIFY PER <br />PLAN. <br />SEE ENERG � <br />CODE roRms <br />FOR <br />INSULATION <br />R-vALUES <br />E 1L 2� c� <br />< -4 <br />WALL <br />SECTION <br />WOOD <br />FRAME TO <br />5� . EA. END (�) . <br />SPACE STRAM Ab FOLLOIX5, <br />-)10 MPI4 V, 32- Or- <br />10 MPI4 r. . , 32' OZ, <br />W MP14 S', 40 or- <br />-1,40 MPN 'C' 46 01C. <br />TOP OF STUD "LL <br />&DLE <br />F- <br />TOP OF <br />`MAI�UJAL� - 1 <br />O-U BLOCK WALL <br />SEE ENERGY CODE FOFelS <br />FOR INSULATION R-VALUES <br />1, Gypsum BOARD OR <br />HIGH STRENGTH CLG. <br />BOARD <br />SIMPSON <br />SP2 * EA, <br />2Xa STUD <br />J* DRY WALL <br />J' DIA ANCHOR BOLT <br />AT 16' O.C. MAX WITH '1' <br />EMBEDMENT AND 2' <br />DIA. WASHER <br />5IMfl5ON SPI <br />* EA. 2X6 <br />STUD <br />(1) COURSE TIE-15EAM <br />POURED SOLID WITH <br />CONCRETE. (1) 05 <br />REBAR HORtIZONTALLY <br />PRECAST LINTEL <br />WINDOW ATTACHMENT AS <br />PER MANUFACTURES <br />PRECAST 5 LL <br />Ix2 P.T, FURRING STRIPS <br />o Iro' O.C. <br />a, cmu <br />1/2 GYP. WL. 15D. <br />(1) 04 CONTINUOUS REBAR <br />WOOD BASE <br />04 RE5AR 48' LOWS <br />Wlro'HOOK 0 24'OC, <br />MIN. 24' IN SLAB <br />N r/02'-O` 0-11N. <br />4' CONC., RE INF. W/ ro'xro' <br />WIAXW1.40 WWM ON ro-MIL POLY <br />ETHYLENE VAPOR RETARDER ON <br />WELL -COMPACTED CLEAN FILL <br />TERMITE TREATMENT SHALL BE <br />BORA-CARE <br />(3) S REBAR ON CHAIRS <br />�ACE STRA" SPACED 11 <br />AND PASTENED AS <br />SHOUN WITH ONE <br />ADDITIONAL STRAP AT <br />EAC44 WINDOW KW. STUD <br />"L <br />MIN (10) 10d COMMON NAILS <br />INTO STM (0J4S CIA X 1 1/2' <br />LOWW <br />FILL ALL REM4rNW. STRAP <br />WO-Eb W1 10d NAILS 04TO <br />WOOD BACKW. <br />DO NOT PLACE SCREW IN <br />TOP WOLE NEAREST TO TOP <br />OF CM BLOCK WALL <br />CC*MCT BOTTOM OF <br />STRAP TO CM BLOCK UALL <br />W1 (1),'�Ab' DIA, X 1- 114' <br />LOWa TAPCON MASONRY <br />SCREUJS <br />EXTERIOR STUD WALL CONNECTION <br />r��TO FIRST FLOOR MASONRY WALL <br />A R C N I T E C T 3-1 <br />6 <br />oft, <br />u pin <br />G rMo MOE. <br />41 N. RONALD REAGAN BLVD. <br />LONGWOOD, FIL 32750 <br />PH: 407-774-6078 <br />FAK 407-7744078 <br />www.abdesigngroup.com <br />AA #: 0003326 <br />E as <br />S VE <br />IL 1 RADO <br />LV <br />LOT 29 <br />Lorl <br />BLIK 6 <br />PROJMT# <br />04128.000-02961 <br />MODRU <br />4ENI3 <br />"1751-NEUVILLE" <br />GAP.AGZ NVMG: <br />LEFT <br />PAGIR: <br />MONOLITHIC <br />2—STORY <br />WALL <br />SECTIONS & NOTES <br />Q150 MPH EXP. Bj <br />E! <br />I"plan" '9 <br />DATjb _11/09/17 <br />scAuc: 1/4"=l'-O" <br />m*now <br />%. D 4 <br />