My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7356 Sail Clover Ln
Zephyrhills
>
Building Department
>
Building Plans
>
7356 Sail Clover Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:22:08 AM
Creation date
2/24/2025 9:45:30 AM
Metadata
Fields
Template:
Building Plans
Street #
7356
Location
Sail Clover Ln
Contractor
D R Horton
Building Plans - Permit #
4371
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E!lMm6Na <br />CARE SHOULD BE TAKEN IN IG:EPNG THE VENTPROPERLY <br />A", e" AND ID' <br />SHO—IN Y GALVANIZED <br />AUG NED. VENT%PE IS SEALED IF UTIUZED. NAIL IN PUKE <br />USING 1-- NAILS ATEACH OOMER. ROOFING CEMENT <br />SHOULD BE APPUED TOALL SHINGLE EDGES NEAR THE <br />_RUMINATION <br />CUT OUTTHEGOOSENECKVENTOPENINGINTHEROOF <br />OUTEREDGEAND AROUNDTHEENRREPERNETERAS <br />RECOANENGEDINSEVEREWEATHEROOASTAL <br />SHEATHING. SIZE THE OPEMNO ttJ ACCORDANCE MATH THE <br />CONSTRUCTK)N ZONES, <br />CHMT SHONNANTHE EVENTA NEClNNCAL VENTFAN IS <br />USED, SIZE THE VEMOPENING INACCORMN(£ N1TH <br />VENT FAN MANUFACNRETi %%NGCO(NECIION <br />INSTRUCTIONS. <br />DO NOTCUT INTO TRUSSES M RAFTERS NHEN CUTTING THE <br />OPENNGINTHEROOF. <br />INTERFERING SwNGIE NAHS MOUND THE <br />PERNETER OF THE OPENING SO THATTHE NAILING FLANGE <br />OFTHE VENTLAYS FLAT TOTHE ROOF SHEATHING. SUDS <br />THE <br />TOP AND SIDE FLANGES OF THE VENT UPAND UNDER <br />SHINGLE THVENT FIANCES TO LAY qJ <br />INROOF <br />I <br />OFTHE SHINGLES, <br />THE HINGLES, <br />TTOP OF THE <br />re <br />o� <br />HOOD <br />VENT DETAIL <br />&CALE, NTO <br />CUT HOUSEURAP <br />AT 48' ANGLE <br />MODIFIED -1' CUT <br />N HOUBEa@AP <br />LINE OF WNDCLI I i <br />OPENING <br />ED STUD UULL <br />STEP 1 <br />PLA6411NIS OVER <br />NALNG FLANGE AT <br />JAMOE <br />EXTENDFLASHED MN <br />I' BELOffLa W SILL \7/` <br />FLEXIBLE RABINMG <br />DO NOT SEAL BC TOM! --� <br />FIN <br />STEP 6 <br />TEMPORARILY <br />FOLD -UP A SEC <br />HOUSEURAP(O <br />TAM FLAP WC <br />AL HEAD <br />FOLD HOUBEW <br />N AT JAMBS 1 <br />SLOPE SILL R <br />INSTALL 6' <br />6ELF-ADHERING <br />FLASMINIS OVER <br />VINYL HEAD <br />FLASHED (WITH END <br />DAME) NAILING <br />FLANGE <br />I <br />EMEND <br />FLASHED I' MIN <br />BEYOND JAMS <br />FLASHING, <br />N6TALL VINYL DRIP <br />CAP <br />ASPHALT PLASTIC CEMENT <br />NOLDEDAROu- SASE 6 <br />PIPE AND OVER FLANGE <br />ALIGN PL464ED <br />w NT. EDGE OF <br />ESL RO. <br />MISCHANICALLY <br />FASTEN FANNED <br />EDGES.(CAP <br />"LS, STAPLES) <br />INSTALL DUPONT <br />FLASHING AT THE <br />DIAGONAL CUT <br />ACROSS HEAD a <br />WNDCU <br />PLUMBING VENT DETAILS <br />E NTS <br />PPLY %, <br />IF SEAL* <br />AMISS, *S <br />IPPLY TO <br />NDOU NA <br />LANCE N <br />RE-FUNO <br />IOLEE OR <br />INSTALL 6- UM ADNEBIVS - <br />DAOQD FLSEXT!" FLASHED <br />MATERIAL OVER DRIP CAP <br />JOET(PROTECTO-WRAP <br />SIT-20M. or EOUN) <br />STEP 7 ```� STEP 8 <br />WINDOW FLASHING <br />INSTALLATION DETAILS <br />(FULL WRAP) <br />SCALE: NTS <br />STEP 9 <br />PLA514M <br />OVER JOINT <br />UNDE <br />L IT 18 THE CONTACTORa RESPO OMILTY TO VERIFY <br />ROOF VALLEY DETAIL THE COMPATIBILITY PRODUCTS '1D"` <br />THE SAP, SATYRS A L PRODUCTS IN <br />SCALE: NTS PLASHIM MATERIALS USED DURING CONSTRUCTION. <br />2. INSTALL ALL MATERIALS PER MANUFACTURERS, <br />WRITTEN SPECIFICATIONS <br />UJ9REI�L SEALANTS MAY REACT ADVERSELY IF Nor <br />anBLE. <br />GLEAN AND SEAL JAMB TO BILL JOINT6 WITH <br />DOW 119@ FOLLOWING COMPLETION OF <br />EXTERIOR RETROFIT WORK <br />NOTE: <br />REPAIR SCHEME SHOWN SHALL BE <br />IMPLEMENTED AT ALL WINDOWS WITH <br />EVIDENCE OF WATER INTRUSION BELOW THE <br />WINDOW OPENING <br />SEAL INTERIOR PERIMETER OF WINDOW WITH <br />SEALANT <br />APPLY 061 HW (O <br />ISCUAL) SEALANT 1 <br />WNDOWKI'U JOINT <br />FLUID APPLIED <br />FLASHNG(LANCO <br />WHITE -SEAL RC4E <br />OR ECUALA <br />SLOPE SILL TO EDI <br />NOTE, <br />L IT 16 THE CONTACTORS, RESPCNSIBILTY TO VERIFY <br />THE COMPATIBILITY CP ALL PRODUCTS INCLUDING <br />SEALANT& A SELF -ADHERING R.A&HEIG MATERIALS <br />USED DURING CCN6TRUCTION <br />J. MA614M AT EXTERIOR WNDOWD AND DOOR <br />OPENNGO SHALL BE INSTALLED INACCORDANCE <br />WITH MANFACTURIER'S INSTALLATION N&TRUCTICN& <br />AD APPROVED METHOD U OF MC RT®SA <br />U N ACCORDANCE WITH PENETRATION <br />MANFACTURER& NOTALLAT04 AND PLASNENG <br />INSTRUCTIONS. <br />COMPW&etlR &EALANT6 MAY REACT ADVERSELY IF NOT <br />ATIBLE <br />WALL FLASHING INSTALLATION <br />DETAIL (MASONRY) <br />SCALE- NTS <br />1441 N. RONALD REAGAN BLVD. <br />LONGWOOD, FL 32750 <br />PH: 407-7746078 <br />FAX 407-774-4078 <br />www.abdesigngroup.com <br />AA M. 0003326 <br />� <br />w <br />u <br />g <br />� <br />zh <br />ci <br />�Aj <br />w <br />u <br />(rLi <br />w? <br />1mM <br />LL3Z¢� <br />11j( <br />I�CL <br />a <br />(1 <br />l�`Q'j <br />JfUZ <br />yQQny <br />V <br />}+�a3LSFE <br />y1 <br />�s�j1�,1{ <br />a <br />Wei <br />pw <br />pW <br />A �IT 1) — <br />LOT #13 <br />BLK #13 <br />PHASE #4B <br />PROJECT# <br />04181.04B-13131 <br />MODEic <br />E401 <br />"2828—ENSLEY" <br />GARAGE sTruTG: <br />LEFT <br />PAGE: <br />WALL <br />ASSEMBLY <br />DETAILS <br />160 MPH EXP. C <br />PRIN <br />DATE:T 02/07/22 <br />scALE: 1/4"=1'-0" <br />SHEET <br />WA5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.